HomeMy WebLinkAboutNC0031828_Compliance Report_20230914ROY COOPER
cmvteor
EUUZABEM S. MER •�,
ory
RICHARD E. ROGER& JR. NORTH CAROUNA
Dlr.+Cor
FnvlronmernW Quato
Certified Mail # 7022 1670 0000 9974 4220
Return Receip#$fues •edt
September 14, 2023
Chad Braxton
Town of Vanceboro
PO Box 306
Vanceboro, NC 28586-0306
SUBJECT: Compliance Inspection Report
Vanceboro WWTP
NPDES WW Permit No. NC0031828
Craven County
Dear Mr. Braxton:
The North Carolina Division of Water Resources conducted an inspection of the Vanceboro WW TP on
8/17/2023. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NC0031828. The findings and comments
noted during this inspection are provided in the enclosed copy of the inspection report entitled
"Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required. If you should have any questions, please do not hesitate to contact me with
the Water Quality Regional Operations Section in the Washington Regional Office at 252-946-6481 or via email
at victoda.herdt@deq.nc.gov.
ATTACHMENTS
Cc: Laserfiche
Sincerely,
Victoria Herdt, Environmental Specialist II
Water Quality Regional Operations Section
Washington Regional Office
Division of Water Resources, NCDEQ
korth C+vau Dep..oa+td 6ai�ncAJ Qa�) I D.+—aW—t—
w�,.w.y��e�y�..ioa� i witu.bgaosq.�.u,e I �ral�q�ailb�Yrad.nzleE9
az++ewa
United States Environmental Protection Agency
Form Approved.
EPA Wmhington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 IF I 3' I NC0031828 I11 121 23/08/17 I17 181r.1 19I s I 201 I
21III1 I I I I I III I1 I I I I I I I I I I I I I I I I I I I I III I I I I I r6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Raser�a:
I 72 I ti I 731 .I 174 7 I I I I I I I I80
67 701 I 71IuL J I I I
l�
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also Include
Entry Tlme/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:30AM 23/08/17
18/12/01
Vanceboro VVVVTP
Exit Time/Date
Permit Expiration Date
US Hwy 17 Business
Vanceboro NC 28586
10:30AM 23/08/17
23/04130
Name(s) of Onsfte Representffiive(s)/Tities(s)[Phone and Fax Number(s)
Other Facility Data
///
Vernon McCoy Edwards/ORC/252-244-0919/
Name, Address of Responsible Officlalffltie/Phone and Fax Number
Contacted
Chad Braxton,PO Box 306 Vanceboro NC 2WI360306//252-244-0919/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit N Flow Measurement Operations & Malntenar Records/Reports
Self -Monitoring Progran E Sludge Handling DispoE Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Victoria Herdt C yyuc oa%a= DWR/WARO VVQ/252-948-3911/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
RA"TAO." DWR WQROS WARD 252-498-3921 9/14/2023
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type I
NC0031828 I11 1 231=1 7 17 18 I j I
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
A compliance inspection was preformed at the facilites covered under permit # NC0031828 on
08/17/2023 by V.Herd w/ WaRO - DWR - WQROS. Also present during the inspection was
Vernon Edwards (ORC).
The temp inside the influent sampler was 15 degrees C at time of inspection, informed ORC the
fridge needs to be fixed so that temp is at or below 6 degrees C.
The facility is considured to be compliant with Permit # NC0031828
Page#
Permit NCO031828 Owner - Facility: Vanceboro WWTP
Inspection Date: 08/17/2023 Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
0
❑
❑
❑
application?
Is the facility as described in the permit?
❑
■
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: Permit expires April 30, 2023, a renewal application was rubmitted. Need to add
a
Digester to new permit
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24f7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
•
❑
❑
❑
•
❑
❑
❑
■
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
11
El
El
El
El
■
❑
❑
❑
❑
❑
M
❑
❑
❑
E
❑
•
❑
❑
❑
■
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
❑
❑
❑
Comment: DMRs for March 2022 and July 2022 were spot checked and compared to lab
data. Data on DMRs were consistent with that presented on lab reports
Operations & Maintenance
Yes No NA NE
Page# 3
Permit NCO031828 Owner - Facility: VancebM WWTP
inspection Date: 08/17/2023 Inspection Type: Compliance Evaluation
Operations $ Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable E ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Bar Screens
Yes No NA NE
Type of bar screen
a.Manual
b. Mechanical
❑
Are the bars adequately screening debris?
■
❑
❑ ❑
Is the screen free of excessive debris?
0
❑
❑ ❑
Is disposal of screening in compliance?
M
❑
❑ ❑
Is the unit in good condition?
0
❑
❑ ❑
Comment:
Oxidation Ditches
Yes No NA NE
Are the aerators operational?
0
❑
❑
❑
Are the aerators free of excessive solids build up?
0
❑
❑
❑
# Is the foam the proper color for the treatment process?
0
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
❑
❑
❑
0
Are settleometer results acceptable (> 30 minutes)?
❑
❑
❑
E
Is the DO level acceptable?(1.0 to 3.0 mg/1)
❑
❑
❑
■
Are settelometer results acceptable?(400 to 800 mUl in 30 minutes)
❑
❑
❑
Comment:
Disinfection -Gas
Yes No NA NE
Are cylinders secured adequately?
0
❑
❑
❑
1
Are cylinders protected from direct sunlight?
N
❑
❑
❑
Is there adequate reserve supply of disinfectant?
0
❑
❑
❑
Is the level of chlorine residual acceptable?
0
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de-Ghlorination?
N
❑
❑
❑
Page# 4
Permit NG0031828 Owner - Facility: Vanceboro VVKrP
Inspection Date: 08/17/2023 Inspection Type: Compllance Evaluation
Disinfection -Gas Yes No NA NE
Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No. ❑ ❑ ■ ❑
7782-50-5)?
If yes, then is there a Risk Management Plan on site? ❑ ❑ 0 ❑
If yes, then what is the EPA twelve digit ID Number? (1000- -_)
If yes, then when was the RMP last updated?
Comment:
De -chlorination
Yes
No
NA NE
Type of system ?
Gas
Is the feed ratio proportional to chlorine amount (1 to 1)?
0
❑
❑
❑
Is storage appropriate for cylinders?
N
❑
❑
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Are the tablets the proper size and type?
❑
❑
0
❑
Comment: Sulfur Dioxide is being used.
Are tablet de -chlorinators operational?
❑
❑
0
❑
Number of tubes in use?
Comment:
Secondary Clarifler
Yes
No
NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
N
❑
❑
❑
Are weirs level?
N
❑
❑
❑
Is the site free of weir blockage?
■
❑
❑
❑
Is the site free of evidence of short-circuiting?
N
❑
❑
❑
Is scum removal adequate?
E
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
■
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
N
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately Y4 of the sidewall depth)
N
❑
❑
❑
Comment:
Aerobic Dialester Yes No NA NE
Page# 5
Permit NCO031828
Inspection Date: 0&1712023
Owner - Faculty: Venceboro VVVVfP
Inapectlon Type: Compllance Evaluation
Aerobic Dluester
Yes No NA NE
Is the capacity adequate?
■
❑
❑
❑
Is the mixing adequate?
0
❑
❑
❑
Is the site free of excessive foaming in the tank?
N
❑
❑
❑
# Is the odor acceptable?
N
❑
❑
❑
# Is tankage available for properly waste sludge?
■
❑
❑
❑
Comment: Digester is not currently listed in the permit
Standby Power
Yes No NA NE
Is automatically activated standby power available?
■
❑
❑
❑
Is the generator tested by Interrupting primary power source?
0
❑
❑
❑
Is the generator tested under load?
❑
❑
❑
Was generator tested & operational during the inspection?
❑
❑
❑
0
Do the generator(s) have adequate capacity to operate the entire wastewater site?
■
❑
❑
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up
❑
❑
❑
power?
Is the generator fuel level monitored?
M
❑
❑
❑
Comment:
Pumps-RAS-WAS Yee No NA NE
Are pumps in place? 0 ❑ ❑ ❑
Are pumps operational? ■ ❑ ❑ ❑
Are there adequate spare parts and supplies on site? ❑ ❑ ❑
Comment:
Influent Sampllna
Yes No NA NE
# Is composite sampling flow proportional?
■
❑
❑
❑
Is sample collected above side streams?
M
❑
❑
❑
Is proper volume collected?
■
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
❑
0
❑
❑
degrees Celsius)?
Is sampling performed according to the permit?
■
❑
❑
❑
Comment: The temp inside sampler was 15 degrees Cat time of inspection, informed
ORC the
fridge needs to be fixed so that temp is at or below 6 decrees C.
Page# 6
Permit N00031828 Owner - Facility: Vanceboro W1NTP
Inspection Data: 08/17/2023 Inspection Type: Compliance Evaluation
Effluent Samplina
Yes
No
NA NE
Is composite sampling flow proportional?
N
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
M
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
❑
❑
❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
M
❑
❑
❑
representative)?
Comment: The temp inside sampler was 6 degrees C at time of inspection
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used�for reporting?
■
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
■
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
❑
Comment: The flow meter was calibrated by Chadwick on 6/8/2023,
Dryina Beds
Yes No NA NE
Is there adequate drying bed space?
■
❑
❑
❑
Is the sludge distribution on drying beds appropriate?
■
❑ ,
❑
❑
Are the drying beds free of vegetation?
N
❑
❑
❑
# Is the site free of dry sludge remaining in beds?
■
❑
❑
❑
Is the site free of stockpiled sludge?
M
❑
❑
❑
Is the filtrate from sludge drying beds returned to the front of the plant?
0
❑
❑
❑
# Is the sludge disposed of through county landfill?
0
❑
❑
❑
# Is the sludge land applied?
❑
■
❑
❑
(Vacuum filters) Is polymer mixing adequate?
❑
❑
0
❑
Comment: Last recorded time sludge was removed was July 2023, ORC had Iog
book of previous
records of sludge removal since last inspection.
Page# 7