HomeMy WebLinkAbout20140090 Ver 2_DOT Inspection Report 8-12-2015_20150812North Carolina Department of Transportation Roadside Environmental Unit Erosion & Sedimentation / Stormwater Report Proiect Information Inspection Date: 08/12/2015 Project #: 34839.3.GVS4 Division #: Project Type: Project Length River Basin: Location Description: E Contract 4.00 Evaluator TIP #: County: Andrew J Whittaker U-2579B Forsyth Engineer: Winston Salem Res. (Cragmore) Disturbed Acres: 150 Yadkin HQW Zone: NO Trout Zone: NO Winston Salem Northern Beltway Eastern section US 158 to Bus 421 and I 40 Proiect Evaluation Report Type: ✓❑ Routine ❑PCN Length Section 0.1 Sta 590 +/- left 0.1 Sta 523, right OF NORiH �qR � `" �`ti 9 * * o = 0 9�r��NrOF iRANSQ��P ❑ICA ❑ICA Ex 1st ❑ICA Ex 2nd ❑CICA - SWO ❑ ECPAR Installation Maintenance Effectiveness Plan Overall Project of BMPs of BMPs of BMPs Implementation Evaluation 7 7 8 8 7 � C� 7 Grading Scale: 0- 6= Immediate Corrective Action Required, 7= Fair, 8= Good, 9= Very Good, 10 = Excellent Remarks and Recommendations: Partial review of project. Heavy rains caused erosion and resulted in sediment loss at two locations. The site at approx sta 590, left, has been cleaned up. There is some confusion about the pipe location on this side and the subsequent installation of it conflicted with the EC plans. The EC plans must be adjusted to accomdate changes in the drainage system. Contractor's crews installing pipe and those installing EC devices should review the plans before working and causing conflicts in the field. In short, follow the approved plans. -Along L line, slope drain at approx sta. 594 left, failed. Fill in the sump and compact slope. Capture runoff in sump outside the rip rap ring. Install two slope drains at this spot. -Maintain diversions across the roadway and direct runoff in sections to each slope drain to avoid overwhelming individual drains. -Remove the temp ditch at headwall. Direct roadway runoff from sta 22 to sta 20 on driveway to basin 13.4; from approx sta 19+25 to 20+00 to basin 13.8; sta 17+50 to 19+25 into the new Type B basin to be installed. From before sta 15 to sta 17 needs to go into basins 13.1 -On 36" pipe, install rock pipe inlet silt trap per plans. Stabilize the outlet of the 36" pipe to prevent scour. No erodible area should remain between the new basin to basin 13.4. Again, follow the plans. -Install type B sediment basin and dam on left of pipe outlet (24x12) w 2 baffles. Direct runoff into the rear of the basin. Maintain the existing skimmer basin 13.8 and stabilize the area from outlet to the pipe outlet area. -Slopes along L line need to be finish graded n permanent stage seeded. Side slopes on driveway need to be finish graded n permanent stage seeded as well. That means ditches need to be at final elevation n slopes correct. -At this site, all runoff needs to be broken up into drainage areas for each basin and directed into the basins. Around sta 523, reinstall compacted berm. Use silt fence to close off toe of fill slope at skimmer outlet. Stabilize the entire area between the skimmer outlet and the pipe outlet. -Refurbish special sediment control fence and recommend rip rap the area from special sediment control fence to energy dissipator at pipe outlet. 7 7 8/12/2015 2:59 PM Page 1 of 2 -Cleanout accumulated silt at pipe outlet. -Cleanout skimmer basin. -Slopes along this section need to be finish graded and permanent stage seeded. -Cleanout silt fence and finalize this area. -Per plans, sta 522 to 524 slopes are to be matted, which means finish grade, permanent stage seed and mat. -Recommend installing rock toe protection and stabilizing this area as soon as possible. -This area along the L line by the pond needs to be stabilized and monitored closely. There is mis-communication within the contractor's operation that led to the pipe being installed in a different location than anticipated by the other crews installing the EC devices. In any case, the EC devices can be moved to accomodate the pipe location if needed. Locating and staking of the pipe locations accurately must be done and the adjustments to the EC devices must be done to reflect the actual plan. 8/12/2015 2:59 PM Page 2 of 2