HomeMy WebLinkAboutNCC204155_NOT Signed Certification_20230911 NCG01 Notice of Termination (NOT) Certification Form
Directions:
Print this form, complete,scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 61h Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22]
General Permit Certificate of Coverage (COC) No.: NCC204155
Name of Project: Oneida Rd Sidewalk/Culvert Replacement Project
Per NC General Statute 143-215.6E (i), any person who knowingly makes any false statement, representation,or
certification in any application, record, report, plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge
and belief, such information is true, complete, and accurate.
Legally Responsible Organizational Entity(must match eNOT): City of Charlotte
*Legally Responsible Person (must match eNOT): Jennifer Smith
*Title of Legally Responsible Person: City Engineer
Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person:
*Signature. 4
Date: q c,? 9 a
* IMPORTANT TE. This form must be signed by a responsible corporate officer that owns or operates the
construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV, Section B, Item (6)of the NCGO10000 permit.
For more information on signatory requirements,see Part IV,Section B, Item (6)of the NCGO10000 permit.