Loading...
HomeMy WebLinkAboutNCC204155_NOT Closeout Documents_20230911 Sedimentation/Constiruction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699 County: Mecklenburg Project: Oneida Road Sidewalk&Culvert Replacement River basin: Catawba Person financially responsible:Charlotte-Mecklenburg County Stormwater Project#: MECKL-2020-062 Services-Steven McCraney,Project Manager Address: 600 East Fourth Street,Charlotte,NC 28202 1. Project Location: Oneida Road,Charlotte Pictures: No 2. Weather and soil conditions: Sunny,Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No One Onsite Title: Inspection report: Sent Report Date given/sent: April 01,2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Remove all remaining erosion control measures from the site.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO1) must be requested by the permittee via a Notice of Termination(NOT)unless permit approval date was prior to April 2019. The NOT is available at:https://edocs.deq.nc.gov/Fonns/NCGOI Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: March 29,2022 Time arriving on site: 9:30 AM Time leaving site: 9:45 AM cc: