Loading...
HomeMy WebLinkAboutNCC232771_NOI Application_20230914 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 9/13/2023 8:49:56 AM (NCG01 NOI Submission) Approve by Brooklyn.Broussard 9/13/2023 9:11:34 AM(Review-NOI 159441 Focus Broadband Great Grants 2022) • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: September 18,2023 5:00 PM 9/13/2023 8:50:05 AM • The task was assigned to Brooklyn.Broussard by round robin distribution 9/13/2023 8:50:05 AM Submit by Tev.Holloman 9/14/2023 11:28:38 AM (Payment Verification for NCC232771) •Brent Brinson • The task was assigned to DEMLR NCG01 Payment Team.The due date is:October 25,2023 5:00 PM 9/13/2023 9:11:49 AM • Tev.Holloman assigned the task to Tev.Holloman 9/14/2023 11:28:07 AM applicationConstruction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System(NPDES) General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities NORTH CAROUNA Environmental Quality A. Project Information Part A. Project Location and Waterbody Information ................................................................................................................................................................................................................................................................................................................................................................................................... Are you submitting an NOI that was rejected before? No Yes 1a. Project Name* Focus Broadband Great Grants 2022 1b.Specific Lot Numbers This field may be used to list specifc lot numbers. 1c.Parcel ID Number(s)(PIN) List all PINs associated with this project. N/A 2.County* Robeson 3.Highway or Street Address* N/A Street name only is acceptable if no address number assigned yet 4.City or Township* N/A 5.State* NC 6.Zip Code* 28358 7. Latitude* Enter the latitude in decimal degrees 34.6201 8. Longitude* Enter the longitude in decimal degrees(MUST be negative) -79.0085 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 09/15/2023 Estimated Construction Project Start Date 10.Date to End* 05/30/2025 Estimated Construction Project End Date 11.SIC(Primary)* Other(9999) Standard Industrial Classification for Development 12.Acres to be 4.30 disturbed* (including off-site borrow and waste areas) 13.Total site area 4.30 (acres)* 14. Post-construction 0.00 impervious area (Estimated) (acres)* Project Tracking ID NCC-ROBES-2023-Focus Broadband Great Grants 2022 Assigned automatically(not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a.Receiving Waterbody* Pats Branch Name of waterbody into which stormwater runoff will discharge 15b.Waterbody Index No.* 14-22-3-4 NC Waterbody Index Number Stormwater discharges will flow to additional waters* No Yes 15c.Additional Receiving Waterbody Thick Branch Waterbody name 15d.Waterbody Index No. 14-22-3-5 NC Waterbody Index Number 15e.Additional Receiving Waterbody Big Swamp Waterbody name 15f.Waterbody Index No. 14-22 NC Waterbody Index Number 16a.Is this project subject to the NC Sediment Pollution Control Act?* Yes No, not subject to NC SPCA 17. Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date. B. Permittee Information Part B. Permittee Information-Legally Responsible Entity and Individual ...................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1. Permittee* Legally Responsible Entity Atlantic Telephone Membership Corporation If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name. Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership(FRO)Form. 2. First Name* Keith If Corporation,enter Registered Agent First Name 3. Last Name* Holden If Corporation,enter Registered Agent Last Name 3b.Title CEO/General Manager 4. Permitee E-mail Address* kholden@focusbroadband.com 5. Permittee Telephone No.* 910-754-4311 6. Permittee Mailing Address* Street Address PO Box 3198 Address Line 2 City State/Province/Region Shallotte INC Postal/Zip Code Country 28459 us Check box if the street address the same as mailing address Yes 7. Permittee Street Address* Street Address 640 Whiteville Road Northwest Address Line 2 City State/Province/Region Shallotte NC Postal/Zip Code Country 28470-6503 us B.Type of Ownership* Ownership is only individual if an individual is named in B.1.above. Non-Government C. Site Contact Information Part C. Project Site Contact Information ................................................................................................................................................................................................................................................................................................................................................................................................ 1. Primary Site Contact-First Name* Brent 2. Primary Site Contact-Last Name* Brinson 3.Title Director of OSP Engineering 4.Site Contact E-mail Address* bbrinson@focusbroadband.com 5.Site Contact Telephone No.* 910-754-4311 6.Organization Name Atlantic Telephone Membership Corporation 7.Site Contact Mailing Address* Street Address PO Box 3198 Address Line 2 City State/Province/Region Shallotte NC Postal/Zip Code Country 28459 us 8.Consultant Name (Optional) Alex Lapinsky First and Last name 9.Consultant E-mail alex.lapinsky@mcgillassociates.com This person will be copied on all correspondence. 10.Consultant Telephone No. 910-755-5872 11. Billing E-mail (For Annual Fee correspondence) kholden@focusbroadband.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 910-754-4311 Default is legally responsible person telephone D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Plan Approval Information ...................................................................................................................................................................... 1. Date E&SC Plan 07/24/2023 Approved* 2. E&SC Plan Project ROBES-2023-048 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4.State DEQ Office* Fayetteville(FRO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can include the beginning point and end point coordinates in the"Notes"box below). 5. E&SC Plan z23-0724 Letter of Approval Robes-2023-048.pdf 83KB Approval letter or Must be PDF format Grading Permit 6.Signed FRO Financial Responsibility/Ownership Form 23-0619 Executed FRO Robeson County.pdf 692.11KB Must be PDF format 7.Site Location Map Must be PDF format(limit 20 MB) 22.07118_RobesonCounty Location Map-L-1.pdf 853.3KB Please do not upload entire set of E&SC plans. 8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application.Include additional waterbodies if necessary. Complete listing of stream crossings and index Focus Great Grant 2022 Robeson County Stream Crossings Stream Name Classification Stream Index Pats Branch C;Sw 14-22-3-4 Thick Branch C;Sw 14-22-3-5 Big Swamp C;Sw 14-22 Gallberry Swamp C;Sw 14-22-1 Black Branch C;Sw 14-22-2-3 Beaverdam Branch C;Sw 14-22-1-3-2.5 Little Marsh Swamp C;Sw 14-22-1-3 Frazier Branch C;Sw 14-22-1-3-1 Gum Branch C;Sw 14-22-2-2 Mirey Branch C;Sw 14-22-2-1 Sassfrass Branch C;Sw 14-22-1-3-0.5 Bogue Swamp C;Sw 14-22-1-3-0.7 Buckhorn Swamp C;Sw 14-22-1-2 9. NOI Certification Great Grants 2022 Robeson County eNOI- Form 560.28KB Certification-Form-20230601-DEMLR-SW.pdf Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.613(1)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is,to the best of my knowledge and belief,true, accurate,and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person'(signing on behalf of Legally Responsible Person named in Part B) Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. 'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature 1f11 iIKIr Type Name* Keith Holden Title CEO/General Manager Organization Legally Responsible Entity Atlantic Telephone Membership Corporation Date* 09/13/2023 F. Tracking and COC Info NOI Tracking No. 159441 NC Reference No. NCG01-2023-2771 Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SP(passed from workflow if eNOI approved) Certificate of NCC232771 Coverage(COC)No.* Uses NOI number until approved,then uses NUMBER incremented by SP(formatted and passed from workflow if eNOI approved) Initial Invoice No. NCC232771-2023 Invoice Due Date 10/13/2023 Initial Fee $ 100.00 Invoice Status OPEN