Loading...
HomeMy WebLinkAboutNCC230818_Modification Confirmation Email_20230914 Georgoulias, Bethany From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Thursday, September 14, 2023 10:47 AM To: andrew.moore@dominionenergy.com Cc: Georgoulias, Bethany; andrew.moore@dominionenergy.com; KATY.D.MAYS@DOMINIONENERGY.COM; amber.liepse@hdrinc.com Subject: [External] Modification Confirmation CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. This e-mail is to notify you that the modification information for COC No. NCC230818 for the project M-73 Cardinal to NC State Pipeline Project that you submitted on 9/13/2023 has been added to the permit file records as of 9/14/2023. Modification Reason: Other Revision(s)to E&SC Plan Additional Details(if provided): Limits of disturbance has been adjusted based on property agreements and easements. Limits of disturbance decreased from 54.18 to 52.8 acres. Note that there will be no change in impervious surface area from pre-to post-development conditions throughout the pipeline installation portion of the project.The regulation station development portion of the project is small and has a Built Upon Area (BUA) of 1.1%, well below the thresholds for a low-density development area. You can find all Construction COC Permit files in our Document Repository here. Questions? Please contact The NC Stormwater Program at(919) 707-3640. Be sure to add laserfiche.ncdenr.gov@mccicloud.io to your contacts to avoid future a-mails about this application from going into Spam filters. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored. i