PROJECT INFORMATION
1 Project Name Erwin Road Residential
2 Project Area(ac) 9.04
3 Coastal Wetland Area(ac) - _
4 Surface Water Area(ac) -
5 Is this project High or Low Density? High
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) -
8 Will the vegetated setback remain vegetated? N/A
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell _
13 Wet Pond 1
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting(RWH)
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS) _
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
alIVER CERTIFICATION
27 Name and Title: Matt Lowder,PE
28 Organization: Bowman North Carolina,Ltd.
29 Street address: 4006 Barret Dr.Suite 104
30 City.State,Zip: Raleigh,NC 27609
31 Phone numbe_r(s_): 1 919-553-6570
32 Email: I mlowder@bowman.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications,
operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer A....-111 iL•i
���%%•eqk CAR �.;
�5 Q�kF,SSIp G
SEALSignature of Designer
24434 /
kr-or' 401144-.O41
Q~ ligl7-_.
/llrflf11. Seal ale D
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so,number of drainage areas/SCMs 1
3 Does this project have low density areas? No
4 If so,number of low density drainage areas 0
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1
_4 Type of SCM - Wet Pond _
5 Total drainage area(sq ft) 393826 220108
6 Onsite drainage area(sq ft) 393826 206526 _
7 Offsite drainage area(sq ft) 0 13582
8 Total BUA in project(sq ft) _ sf 85120 sf _
New BUA on subdivided lots(subject to permitting)
9 (so ft)New BUA not on subdivided lots(subject to
10 permitting)(sf) -
11 Offsite BUA(sq ft) 3070 sf
12 Breakdown of new BUA not on subdivided lots:
-Parking(sq ft)
-Sidewalk(sq ft) 7748 sf
-Roof(sq ft) 33210 sf _
-Roadway(sq ft) 41092 sf
-Future(sq ft)
-Other,please specify in the comment box
below(sq ft)
New infiltrating permeable pavement on subdivided
13 lots(sq ft)New infiltrating permeable pavement not on
14 subdivided lots(sq ft) -
Existing BUA that will remain(not subject to
15 permitting)(sq ft) -
16 Existing BUA that is already permitted(sq ft) -
17 Existing BUA that will be removed(so ft) -
18 Percent BUA 39%
19 Design storm(inches) 1 in
20 Design volume of SCM(cu ft) 7297 cf
21 Calculation method for design volume Simple Method
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
WET POND
1 Drainage area number 1 I
2 Minimum required treatment volume(Cu ft) 7297 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes
4 Is the SCM located away from contaminated soils? Yes
5 What are the side slopes of the SCM(H:V)? 3:1
Does the SCM have retaining walls,gabion walls or other
6 No
engineered side slopes?
Are the inlets,outlets,and receiving stream protected from erosion
7 Yes
(10-year storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes
design volume?
9 What is the method for dewatering the SCM for maintenance? Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? Yes
11 Does the maintenance access comply with General MDC(8)? Yes
12 Does the drainage easement comply with General MDC(9)? Yes _
13 If the SCM is on a single family lot,does(will?)the plat comply with N/A
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes
16 Does the SCM follow the device specific MDC? Yes
17 Was the SCM designed by an NC licensed professional? Yes
WET POND MDC FROM 02H.1053
18 Sizing method used SA/DA _
19 Has a stage/storage table been provided in the calculations? Yes
20 Elevation of the excavated main pool depth(bottom of sediment 163.60
removal)(fmsl)
21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 164.60
22 Elevation of the bottom of the vegetated shelf(fmsl) 169.60 _
23 Elevation of the permanent pool(fmsl) 170.10
24 Elevation of the top of the vegetated shelf(fmsl) 170.60 _
25 Elevation of the temporary pool(fmsl) 172.10
26 Surface area of the main permanent pool(square feet) 4375 _
27 Volume of the main permanent pool(cubic feet) 14336 cf
28 Average depth of the main pool(feet) 3.92 ft —
29 Average depth equation used Equation 3
30 If using equation 3,main pool perimeter(feet) 267.0 ft _
31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft
32 Volume of the forebay(cubic feet) 2411 cf _
33 Is this 15-20%of the volume in the main pool? Yes
34 Clean-out depth for forebay(inches) 12 in _
35 Design volume of SCM(cu ft) 7297 cf
36 Is the outlet an orifice or a weir? Orifice _
37 If orifice,orifice diameter(inches) 1.56 in
38 If weir,weir height(inches)
39 If weir,weir length(inches)
40 Drawdown time for the temporary pool(days) 3.97
41 Are the inlet(s)and outlet located in a manner that avoids short- Yes
circuiting?
42 Are berms or baffles provided to improve the flow path? Yes
43 Depth of forebay at entrance(inches) 60 in
44 Depth of forebay at exit(inches) 36 in
45 Does water flow out of the forebay in a non-erosive manner? Yes
46 Width of the vegetated shelf(feet) 6 ft
47 Slope of vegetated shelf(H:V) 6:1
48 Does the orifice drawdown from below the top surface of the Yes
permanent pool?
Does the pond minimize impacts to the receiving channel from the 1-
49 Yes
yr,24-hr storm?
50 Are fountains proposed?(If Y,please provide documentation that No
MDC(9)is met.)
51 Is a trash rack or other device provided to protect the outlet system? Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes
53 Species of turf that will be used on the dam and embankment
541 Has a planting plan been provided for the vegetated shelf? Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional information about
55 the wet pond(s):
Wet Pond 1 9:13 AM 8/21/2023