Loading...
HomeMy WebLinkAbout780081_Routine Inspection_20230912Date of Visit: /oti Arrival Time: Departure Time: County: L_ Region: r V Farm Name: JrL�r,Tp Owner Email: Owner Name: , 46et e_ 144ro leO Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: ti Certified Operator:_ Back-up Operator: Location of Farm: Latitude: Phone: Integrator: Certification Number: l7 5.3 Certification Number: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes .allo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes eNo ❑ NA ❑ NE ❑ Yes J�J_No ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facility Number: "7 - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes�Ej­No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: p Designed Freeboard (in): Observed Freeboard (in):_ 5. Are there any immediate threats to the integrity of any of the structures observed? 4'Yes 040 ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes -E!rNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes . fNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes j2rNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes .E:fNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑'No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 2] No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window n Evidence of Wind Drift I-1 Annlicntion Onkide of Annrnvrd Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes _�o ❑ NA ❑ NE [,2"Yes No ❑ NA ❑ NE ❑ Yes � No ❑ NA ❑ NE ❑ Yes _Q No ❑ NA ❑ NE ❑ Yes ZNo ❑ NA ❑ NE ❑ Yes 4D'No ❑ NA ❑ NE ❑ Yes .E:rNo ❑ NA ❑ NE ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes D No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ®No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑NA ❑NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facifi Number: Date of Inspection: /l 13 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0 No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes J3"No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EfrNo 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes o Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWNIP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ Yes ❑-tCo ❑ NA ❑ NE ❑ Yes .E]'No ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes Q N-0 ❑ NA ❑ NE ❑ Yes Q-No ❑ NA ❑ NE ❑ Yes Q-No ❑ NA ❑ NE ❑ Yes Q­I�o ❑ NA ❑ NE 4-01 b 941�� �� 4i ; ::t- oh �!�o ifro �4c�-�/�i 17 Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of Phone: 9`"1 Date: C? /,-zA'j- S/12/2020 FACILITY#: �17 "d !_ FARM NAME: &47 " 1 LAGOON LEVEL PERMIT (ns) - DUE EVERY 5 YEARS 7� - EXPERIATION DATE NUMBER OF ANIMALS 3 / �LDi CURRENT NUMBER OF ANIMAL - OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - ODOR CONTROL CHECK LIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (#21) -GOOD FOR 60 DAYS BEFORE OR AFTER % DATE qAl NITROGEN LEVEL ° i 3 _ DATE V )/,6 NITROGEN LEVEL -;k L/ /�j DATE `� NITROGEN LEVEL /gl //r�.3 SOUL REPORT (i i) - EVERY 3 YEARS: DATE - P-1 (NO MORE THEN 400) e - PH (Note if4orlP ) - Cu1ZN (NO MORE THEN 3000) CU ZN (IFPEANUTS NOMORETHEN300) fJ itp[�3 - "-3 ( 6463 �/ IRR2 (#21) /( Not over PAN CROP TYPES /I (%� be-1- p,)31193 "`- FLOW RATES NITROGEN (N) - Not over PAN CROP TYPES FLOW RATES NITROGE ) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION (xz<) EACH REEL SHOULD BE CA41TE EVERY OTHER YEAR DATE OF CALIBRATION FLOW RATESf'd7 RAIN FALL (#21) -INITIAL AFTER 1" RAIN EVENT J -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED. 13SLUDGE(miazs) -DUE EVERY YEAR: DATE s J/3 /� O:�,q(e P: 3, ke % RATIO OF SLUDGE ry� O: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE OTHER FORMS (azz AND 421) RAIN BREAKER FORM CROP YEILDS MORTALITY *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED BINS LAGOON GARBAGE Bermuda grass: Opens March 1s2- Ends September 302 Small Grain Over seed: Opens October 1n-Ends March 31s2 Corn: Opens February 15* - Ends June 30u Cotton: Opens March 152 - Ends August 1s2 Rye: Opens September 1st -Ends March 31st Oats: Opens September Isf-Ends April 15* Wheat Opens September 1st- Ends April 30* Soybeans: Opens April 1-t-Ends September 152 . Fescue: Opens August 1st -Ends July 31st Sorghum Hay: Opens March 15w -Ends August 31 st