Loading...
HomeMy WebLinkAboutNCC232747_Site Plan or Location Map_20230913 ( } ---( 4Dsite CLAN K J solutions CAMPBELL OG EROSION CONTROL NOTES OR OTHER MEANS.CONTROL EROSION FROM ALL RUNOFF-PRODUCING RAINFALL BUT IN NO CASE LESS THAN civil engineering I land surveying DIRK 49' STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. ONCE EVERY WEEK.ANY NEEDED REPAIRS WILL BE MADE CONSTRUCTION SEQUENCE NOTIFICATION OF COMBINED SELF-MONITORING AND GROUND STABILIZATION CHART 669 Chicago 11.50A v2.f Fayetteville,NC zeros CARDIHM-A�`" �9 1. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. SELF-INSPECTION FORM: 01.1919.26-6777 fax 1910-426-61n rcrse rumor IO226♦ FENCE WHEN IT BECOMES ABOUT 0.5'DEEP AT THE FENCE. MUST BE NO LESS THAN FIVE FEET FROM THE 13.PURSUANT TO G.S.113A-57(2),THE ANGLE FOR GRADED 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND SITE AREA STABILIZATION STABILIZATION TIME rrrADWwIWon�wm THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT SLOPES AND FILLS SHALL BE NO GREATER THAN THE HOLD PRE CONSTRUCTION CONFERENCE. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN DESCRIPTION TIME FRAME FRAME EXCEPTIONS .. ` MAINTAIN A PROPER BARRIER. MORE THAN 24 HOURS. ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR 2. INSTALL STONE CONSTRUCTION ENTRANCE AND TEMPORARY 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR TAHOE CT 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT OTHER ADEQUATE EROSION CONTROL DEVICES OR SILT FENCE WHERE SPECIFIED. LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PERIMETER DIKES, PATOLLY PLACE , PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING STRUCTURES.IN ANY EVENT,SLOPES LEFT EXPOSED WILL, 3. CLEAR AND GRUB THE SITE AS NEEDED. PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED SWALES,DITHCES 7 DAYS NONE LEISURE TRAIL STREET AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED DRAINAGE AREA HAS BEEN STABILIZED.INSPECT WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY 4. FERTILIZE,SEED AND MULCH ALL REMAINING DISTURBED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING AND SLOPES DOTSON DRIVE BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON PHASE OF GRADING,BE PLANTED OR OTHERWISE PROVIDED AREAS. FOLLOWED.RULES DETAILING THE DOCUMENTATION OF THESE \\\\I III//////' OR AT THE EARLIEST POSSIBLE POINT DURING A DAILY BASIS AND REPLACE DETERIORATED,DAMAGED,OR WITH TEMPORARY OR PERMANENT GROUND COVER,DEVICES 5. UPON SITE STABILIZATION,SEEK NCDEQ APPROVAL TO INSPECTIONS TOOK EFFECT OCTOBER 1,2010. HIGH QUALITY COOL BREEZE CONSTRUCTION. ROTTED EROSION CONTROL DEVICES IMMEDIATELY. OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. REMOVE ALL TEMPORARY MEASURES. WATER(HOW) 7 DAYS NONE Q '�. 2( �j DRIVE ® 3. TEMPORARY&PERMANENT EROSION CONTROL MEASURES 8. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL PURSUANT TO G.S.113A-57(3),PROVISIONS FOR 6. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED TO SIMPLIFY DOCUMENTATION OF SELF-INSPECTION REPORTS ZONES � FESS/ '+��G 0o SHALL BE CONSTRUCTED PER THE DETAILS HEREIN,OR DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND AND NPDES SELF-MONITORING REPORTS,DWQ AND DEMLR ` 't' p',6p SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH FINAL STABILIZATION AND PERMANENT VEGETATION HAS MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. DEVELOPED A COMBINED FORM.THE SELF-INSPECTION `4 "(} 5- g CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND BEEN ESTABLISHED,IT IS RECOMMENDED THAT NCDEQ 90 CALENDAR DAYS FOLLOWING COMPLETION OF 7. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING IF SLOPES ARE 10'OR $EA DESIGN MANUAL. APPROVE THE ACTION PRIOR TO REMOVAL. CONSTRUCTION OR DEVELOPMENT. SLOPES STEEPER NOT IN LENGTH AND ARE p2 STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST PROGRAM OF THE NPDES STORM WATER PERMIT FOR 7 DAYS (��(l 4I�C?�J_� US AR 401 FAYETTEVILLE ROAD BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF CONSTRUCTION ACTIVITIES.THE FOCUS OF THE THAN 3:1 NOT STEEPER THAN 2:1, 29 �1(�y 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NODES 9. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED 14.CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION 14 DAYS ARE ALLOWED CYl1 111"` OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION CONTROL MEASURES SHOWN AND ANYTHADDITIONAL TERMINATION(NOT). THE NOT IS AVAILABLE AT: SELF-INSPECTION REPORT IS THE INSTALLATION AND GINE„ 7+___) �� 'S'g LAND DISTURBING ACTIVITIES.910-433-3300 ACTIVITY. MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING HTTPS://EDOCS.DEQ.NC.GOV/FORMS/NCG01-TERMINATION. MEASMAINTURES ACCORDING NANCE F OSI00 THEN D APPDROVEDAPLAN CONTROLT 7-DAYS FOR SLOPES '7//`rOOTT 8, `` n9i 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR 10.THE INSTALLATION OF EROSION CONTROL MEASURES SHALL THE COURSE OF CONSTRUCTION. PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF SLOPES 3:1 OR 14 DAYS GREATER THAN 50 FEET //////111111\\\\\\� S"A OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION 15.THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE FLATTER IN LENGTH NORTH PAVEMENT AREAS.REMOVAL SHALL BE ON A DAILY BASIS ACTI TIES. ARISE ON SITE IS CARROLL THOMAS.CONTACT OF TERMINATION PROCESS. THE PROJECT,AND CONTINUED UNTIL PERMANENT GROUND7 WHEN TRACKING OCCURS. 11.THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE (910)-487-5900. COVER IS ESTABLISHED.THE FORM CAN BE ACCESSED AT: U1�U�i-�3 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY(50)FEET ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES HTTP://PORTAL.NCDENR.ORG/WEB/LR/EROSION ALL OTHER AREAS NONE VICINITY MAP FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE PERFORMING WORK ON THIS PROJECT. WITH SLOPES FLATTER 14 DAYS (EXCEPT FOR CHANNEL.IF REMAINING FOR MORE THAN SEVEN DAYS, 12.ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, THAN 4:1 PERIMETERS AND STABILIZE THE STOCKPILES BY VEGETATIVE COVER,TARPS, CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT(910) HOW ZONES) REVISIONS NOT TO SCALE 433-3300. / rT \ J� f ©e- e- \--.. „ P ' '••••1 �'' • -------- N$F 1 _ �� p- 288, JACK S.BECERRA,JR &WIFE, / ` " ^ �\ JESSCA BECERRA q 7'� 129s 1 _ o �( DB 1216,PG 605 N/F \ ^ /"_ -- �292� N F PB 4085,PG 5 MIDWAY&ASSOCIATES l ,�� ��Y� / DB 504,PG 45 'ALLANTE ND FJACKSON I 1‘294i --) 'L"� `Z90 1 RICARDO A.LAWRENCE\ v I\ SLIDE 3 DpB 4090 1208,P PGG 075/I�z95i N/F I __ F ANDREN/MALLETT N/F DPB G 5 / • . • • • t9-S�Ul-S�Al y. =2. ♦ I N/F JETB 1346,PGP49 DIE?293,11 SAMAN&THA FMALLETT�"-�HB N OSDPEG 383 ��289 4� 8,PG 393 W CAN 85 P ICE NTON II • EDDIE DAVI' DIAZ PB '090,PG 7 DB 1377,PG 993 ,291 D • • &1'E, N/. PB 4085,PG 5 PB 4085 PG 5 pT �HAEL BROWN =: -- SB69TENDOZVPROJECT NAME � DB 1213 19BRANDON M MCNEILL-0- K g LyIFE, 0 EVI PB 4090.PG] 4090, T 3 t ps-.5g,})OUPB 4085,PG 5 N HEATHER MENDOZA N/F B1408PG35 % FEDEX THOMAS INVESTMENT INC • DB 3]3,PG 624PROPERTY NFOC-IOC- C AUTUMN PARK,L.L.C. B672,PO111 • 266 IOC Or IOC LOC-L D � o 1 p N/F �_ - I i 0 / om AAE PACIFIC PARK ASSOCIATES,LLC / 8 sry Q DB 1159,PG 873 _ W -'04( U -- o • z . / � / ��N��O p�G S� V I "_ /` ADBUM46�PARK, PG 4]C, AMERDB N FLOFG 1176,PG 93],LLC - OVERALL DB 1467,PG 50 y /• v I EROSION • �, �3 � I� �1� CONTROL PLAN 3 �,0 4 N/F `� \ s li Ia'-',?',,' AAE PACIFIC PARK ASSOCIATES,LLC ,fj l �-1 DB 1159,PG 873 1 / J ` l o V{ CLIENT // / O r 3]'S Acres /- I CARROLL THOMAS /i -., 's ^ n 6 O I• �s i ; LOC-L LOC-LOC `- pp!_ DL1L- I I r. ✓ 1 nr. 1 Gr. 1 oc-Inc-I nr. I or I Qr. IOC - - fir-- - - ' L. •C,_Inc-10G_=-�-_-�-_-�---�C--�`'--Q- --wv_ LuL iU. a28314 605S.Reilly Road -- - _. „ - s Fayetteville,North Carotin ----- _.--. Phone:(910)467-5900 US HIGHWAY 401 - PUBLIC R/W VARIES --- o -_- PROJECT INFORMATION LEGEND: DESIGNED BY: BRETT Ec A NCDOT R/W DISK I=SIGN DRAWN BY: BRETT E ti ECM-EXISTING CONCRETE MONUMENT z❑s ELECTRICAL METER ❑ CHECKED BY: SCOTT 0 EIP-EXISTING IRON PIPE ❑®ELECTRICAL BOX gLd BIRO FIR-EXISTING IRON ROD PP•UTILITY POLE PROJECT NUMBER: 1940 Ti EIs O EIS-EXISTING IRON STAKE C GUY WIRE EBeO ERB-EXISTING REBAR A WATER VALVE o COMPUTED POINTZOCFIRE HYDRANT DRAWING SCALE N/F-NOW OR FORMERLY 5 SANITARY SEWER MANHOLE 1E111 R/W-RIGHT OF WAY ®PINE TREE HORIZONTAL:1°=100' y PROPERTY UNE BUILDINGS O -ADJACENT PROPERTY UNE -s 9E-SILT FENCE LINE 0 Q -RIGHT-OF-WAY -ow-ay-DIVERSION BERM // OVERHEAD UTUTY -Mx:-.RC-UNITS OF CONSTRUCTION DATE RELEASED PERMANENT EASEMENT OINET PROTECTION GRAPHIC SCALE 3 X FENCE LINE s u Know what's below. >1 TREE LINE ` - II II Call before you dig. L, 11 ( IN FEET) SHEET NUMBER a 1 inch= 100 ft. g C1 .0 1 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED I