HomeMy WebLinkAboutNCC232744_Site Plan or Location Map_20230913 I ) • T� /C1P
J, \\ \ \ I / // /// EROSION CONTROL NOTES \`�4DSlte
\ _I i
I I 1. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT \ �SOliitiorts
P,� \ \ \ I I I / \ / FENCE WHEN IT BECOMES ABOUT 0.5'DEEP AT THE FENCE. \ �7 K\+ ��LL
FpOt pftl \ \ I I /'r THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO civil engineering I land surveying
`pF • MAINTAIN A PROPER BARRIER. 609 Chicago Dine wne vz.f Fayetteville,NC 28306
1 SRl;SN '`,I0 \ I I I I 1 I • O EIP"b 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR omcelmo+26-6m ra1910-1263]n rcrse rumor 1Gzs6.
PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF w,wADWwwo,,.wm
*SITE ¢ 1 I I I \ I I N/F BEFORE EARTH
ANYDISTURBANCE
EARTH DISTURBANCEOPERATION
OPERATIONS TAKE INSTALLED
PLACE
Po JOSEPH&JEAN WARD OR AT THE EARLIEST POSSIBLE POINT DURING
/ \ \ \ PB 46,PG 56 / CONSTRUCTION.
0553649652000 3. TEMPORARY&PERMANENT EROSION CONTROL MEASURES
•
k Q ��N`<-ROl I I 1 / SHALL BE CONSTRUCTED PER THE DETAILS HEREIN,OR
SHALL SAC'' ` I / \ \ \ I I / / / 1 \ \ \ \ DESISN BE MANU EROSIONCONSTRUCTED
AND SEDIMENT ACCORDANCE CONTROL PLANNING AND `\\��N��Rrf1.O/'��2'
`� / \ / / I ` 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQL.
-ry_•:y
•
1 \ / I \ \ LAND E A MINIMUM OF 48 DISTURBING ACTIVITIE HOURS0 P433R3000BEGINNING ANY 1 SEA �_
v •
5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE 02 4f�C?�J_
o I/ \ I I \1 \ / / I I I \ \ \ DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. �u
\ I l REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING k AONEN�`' \r
\ \ \ 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY(50)FEET 99��"OTT 8 \\
/ \ I / FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE ///////ttttlt\\\\\
NORTH I 10 I l 1 \ / �/ ) I STABILIZE THE REMAININGCHANNEL.IF FOR
BY OVEGE VEGETATIVE COVER,RE THAN SEVEN TARPS, / 5 25 23
• \__ OR OTHER MEANS.CONTROL EROSION FROM ALL V./
VICINITY MAP P N/F I °$ TEMPORARY/ STOCKPILES BY
LOCATED ONRPAVEDS USUURFACESND NE LES.
IY PBN46.PG L56 f,69ry MUST BE NO LESS THAN FIVE FEET FROM THE
NOT TO SCALE •
0553646149000 \\ °ry'M0 I DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT REVISIONS
a6 MORE THAN 24 HOURS.
\ 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL
/ • \ / DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE
AREA HAS BEEN STABILIZED.INSPECT TEMPORARY EROSION
•
• \ O• \ / AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND
/ REPLACE DETERIORATED.DAMAGED.OR ROTTED EROSION
CONTROL DEVICES IMMEDIATELY.
AARON&ALEXANDRA BARTH / I I � / 8. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL
PB 136,PG 93 / / DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE
0553641396000
FINAL STABILIZATION AND PERMANENT VEGETATION HAS
/ I I BEEN ESTABLISHED,IT IS RECOMMENDED THAT NCDEQ
/ / / / /
/ APPROVE THE ACTION PRIOR TO REMOVAL
9. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED
CONCURRENTLY WI THE INITIATION OF CONSTRUCTION
/ / / / / / / % / WIN 10.THE NSTALLATION OF EROSION CONTROL MEASURES SHALL
0
\ I / / / / / /^ '� / TAKEACTI TIESCEDENCE OVER ALL OTHER CONSTRUCTION
LEGEND: \', / i" It
/ % 11.THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE
R/W-RIGHT OF WAY / y' / ' _ PERFORMING WORK, ACTIONS AND F ONM THIS PROJECT.OF ANY OTHER PARTIES
PROPERTY UNE \\ / / ^. / / / 12.ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
- - -ADJACENT PROPERTY LINE . A96'
j' CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY
/ /
RIGHT-OF-WAY ___ _ _- / __ ,
_ RUNOFF-PRODUCING RAINFALL BUT IN NO CASE LESS THAN
/ \ ONCE EVERY WEEK.ANY NEEDED REPAIRS WILL BE MADE
270-MAJOR CONTOUR . / ya i --- -- IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED.
278-MINOR CONTOUR / / ECM / ^ / / 4A _- -- ---- / 13.PURSUANT TO G.S.113A-57(2),THE ANGLE FOR GRADED
-s- -SILT FENCE LINE / / SLOPES AND FILLS SHALL BE NO GREATER THAN THE
I 227.202 SF ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR
s
-1oc-10p-LIMITS OF CONSTRUCTION / $ (522 AC) OTHER ADEQUATE EROSION CONTROL DEVICES OR
O INLET PROTECTION / y / -- STRUCTURES.IN ANY EVENT,SLOPES LEFT EXPOSED WILL,
/ ^° / WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY
' PHASE OF GRADING,BE PLANTED OR OTHERWISE PROVIDED
/ WITH TEMPORARY OR PERMANENT GROUND COVER,DEVICES
/ / - OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION.
/ / PROJECT NAME
/ / PURSUANT TO G S 113A 57(3),PROVISIONS FOR
/ /\ / _Op7=0g� 110 - PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION
O / OaB_O7 SF 1p / / / _--- - 90 MUST
CALENDARODAYS HOLLOWING ALL
COMPLETIONDISTURBED
OFAREAS WITHIN
N/F , U \ I f� IN/ CONSTRUCTION OR DEVELOPMENT. PALESTINE
CHRISTOPHER WAYNE MILLER, °: r /^I - 14.CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION
, PB 79,PG 19 0 / / I CONTROL MEASURES SHOWN AND ANY ADDITIONAL
0553632878000 m / / / ' I I / MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING
i YWj _ _-- THE COURSE OF CONSTRUCTION. ROAD LOTS
CONSTRUCTION SEQUENCE /� / / N / / LIMITS OF / --- 15.THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT
/ CONSTRUCTION __ _ ARSE ON SITE IS SANJAY KHAZANCHI.CONTACT J(��0 [/y
7. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND / U / _ - /(TYP) o / / O (9 7)-37-7174 1 A 2A• K TA
L
HOLD PRE CONSTRUCTION CONFERENCE. "� 170
2. INSTALL STONE CONSTRUCTION ENTRANCE AND TEMPORARY / N/F
SILT FENCE WHERE SPECIFIED. _ _YI LINDA MASON°RIGGERS • •
i
3. CLEAR AND GRUB THE SITE AS NEEDED. 18
PB 78.PG 39
0553742009000
4. FERTILIZE,SEED AND MULCH ALL REMAINING DISTURBED ) lc o / _
AREAS. / / / rL / ---- r1. / - -
5. UPON SITE STABILIZATION,SEEK NCDEQ APPROVAL TO
REMOVE ALL TEMPORARY MEASURES. // _ / / / • • E 178.65' -- -
6. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED ` • f: N68'5538" _ / /
AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND • --
' I. Ygo NOTIFICATION OF COMBINED SELF-MONITORING AND
ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. •
`i1 N68'S5'38"E 396.27'TOTAL 21880' / __ - _- SELF-INSPECTION FORM:
7. TERMINATION OF COVERAGE UNDER THE NPDES GENERAL ` I - / - -- / --- ---
•
STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES MUST �� BP WELL I/ _ THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN
BE REQUESTED BY THE PERMITTEE VIA A NOTICE OF \ SIR 177 46' O.2'AG / \ / ---- ---- 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR
TERMINATION(NOT). THE NOT IS AVAILABLE AT: / - - LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH
HTTPS://EDOCS.DEO.NC.GOV/FORMS/NCGO1-TERMINATION. , - -- PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED
PLEASE NOTE THAT THE CLOSE OUT INSPECTION REPORT \ y i - _ / I EROSION AND SEDIMENTATION CONTROL PLAN IS BEING
MUST BE UPLOADED AS PART OF COMPLETING THE NOTICE / '"\ ^gym �' I❑ / FOLLOWED.RULES DETAILING THE DOCUMENTATION OF THESE EROSION
OF TERMINATION PROCESS. / I INSPECTIONS TOOK EFFECT OCTOBER 1,2010.
\ / .EX.SHE°/ I e`'/ • TO SIMPLIFY DOCUMENTATION OF SELF-INSPECTION REPORTS CONTROL PLAN
AND NPDES SELF-MONITORING REPORTS,DWO AND DEMLR
/ / DEVELOPED A COMBINED FORM.THE SELF-INSPECTION
/ ` I // 3 / \ PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING
I 11 PROGRAM OF THE NPDES STORMWATS PERMIT FOR
____ CONSTRUCTION ACTIVITIES.THE FOCUS OF THE
/ 1A �- SELF-INSPECTION REPORT IS THE INSTALLATION AND
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL
/ (1 372 AC) o•In �� C - _ / � MEASURES ACCORDING TO THE APPROVED PLAN.THE
\ (1.68 1^ EX,HOUSE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF
GROUND STABILIZATION CHART \ / I ./ THE PROJECT,AND CONTINUED UNTIL PERMANENT GROUND
Eir
COVER IS ESTABNISHED.THE FORM CAN RM ACCESSED AT:
SITE AREA STABILIZATION STABILIZATION TINE HTOP.//PORTAL.NCDENR.ORG/WEB/LR/EROSION CLIENT
DESCRIPTION ONE FRAME FRAME EXCEPTONS z I 1111A^ F I IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM,
PERISWAMETER
RD DIKEES 7 DAYS NONE \ \ I m . I Im I PLE PLEASE OONTACT THE FAYETTEVILLE REGIONAL OFFICE AT(910)
AND SLOPES w " C FAITHWILL HOMES,HIGH QUALITY WATER 7 DAYS NONE
(HOW)ZONES O \ o
IF SLOPES ARE 10'OR N/F I •
I ro I>o - \ I LLC
SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE JULIOS •&LISA SMITH •m 3A
THAN 3:1 NOT STEEPER THAN 2:1, / PB 79,PG 19 \ / O I P
14 DAYS ARE ALLOWED \ 0553635527000 \ I N69'33'26"E N/F
TEMPORARY ::::/VED
MICHAEL BAGGETT&
7-DAYS FOR SLOPES \ Tate--, O r MARY BUNNELLS 1.5 AC
SLOPES 3:1 OR 14 DAYS GREATER THAN 50 FEET \ O SILT FENC, I I o, *TOTAL DISTURBED AREA:
S
FLATTER IN LENGTH 72.. PB 146,PG 20
NONE N/F a 0553730779000
ALL OTHER AREAS (EXCEPT FOR \ Ii, IO TREVOR A.CALFO o1MTH SLOPES FLATTER 14 DAYS PERIMETERS AND PB 138,PG 137 �, L I 3840 Legion Road
THAN 4.1HOW ZONES) I \ I u 0553636690000 N_'N�IyQC� SHEDS TO I Hope Mills,North Carolina 28348
m \ -z Phone:(917)371-7175
/ I � I
/ I h (0.66 AC) „•m�I ---__. _ _- PROJECT INFORMATION
/ I= o
\ N 'N I'n I / o: \
J 1 °i- 1 �. / \ \ DESIGNED BY: BRETT
a , I - 18
o.m o� S
`e w \ I G w DRAWN BY: BRETT
- \\ \
m - \ i CHECKED BY. SCOTT
\ Ex.DIRT DRIVEWAY PP PROJECT NUMBER: 2007
�: -- ,
//���
DRAWING SCALE
= I
\ / ER,A •1h - _ 0) - -ns- HORIZONTAL:1=50
1 I • \ ; _��� = S 1111111._ TINE R
__ //�.;yaw �-F� � LOU R t7 0�,(PRO::
BLIC R/W - - _ - -
o�s A;I E6 -3�,- / 11 15'DRIVEWAY PIPE TO BE INSTALLED- DATE RELEASED
o \ - -o 1�001 PER THE EXISTING DITCH UNE GRAPHIC SCALE
s o s AG - - `-' ' ,,� �(T�) 200 MAY 25,2023
Know what's below. J , `
- - - - .�T _ 60 0 Is 9G
li Call before you dig. \ TEMPORARY - 110 - `�
Y g CONSTRUCTION - SHEET NUMBER
F ENTRANCE -
v ( ) -- ( IN FEET)
-- 1 inch= 50 ft.
1 - - - - - - - - C-1 .0
I THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED