HomeMy WebLinkAboutNCC232501_Site Plan or Location Map_20230913 ill /11111r CONSTRUCTION SCHEDULE \\ \ \ \\ \ \
I. Obtain all necessary permits and plan approvals.Erosion and Sediment Control \ 11 ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
O (E&SC)permit and a Certificate of Coverage(COC)must be obtained before any land disturbing activities
*,,% occur.A copy of the FAST permit,the COC and a hard copy of the plan must be kept eo site,preferably in a Il\ NCGS 113E-54.1°IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR
W L Pp" pemats box,and accessible during iru:pection. \ \\ COMPLETED AS AN EXCEL SPREADSHEET.
2. Install gavel construction entrances first then silt fences,reinforced silt fence outlets and waffles.
\ 11 AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF TFiE APPROVED
y TV-P Roe 3. Finish clearing and grubbing any necessary areas on the lots as they are started. \ \ \ EROSION AND
4. Begin lot grading and excavation activities \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A
E
\ NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY
er
Z Ry N- 5. Begin all
continue with Haase construction I \ \ \ \ \ \ APPROV D EROSIONTI AND SEDIMENTATIO�CONTARCOLCPELASNO R BYN COMPLETING,THE
v 6. Finish all rough grading and house construction.activities.
t✓ ]. InstallFinish all rouap tiding and house. DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,
" B. Begin fine grading of lot areas \ \ \\ \ / \ PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
R. ` I J./ 9. Final grassing,mulching and stabilizing of lot.In most cases this will involve the installation of sod on the IA.
CONTROL PLAN.'
.$ / -�/ The silt fence will remain in place until the lot is sodded or grassing is stabilized anti takes hold. I \
sR_14�40 } I l!J ,' 10. The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete \
o the following combined self-inspection f found on [he DEMLR website I \\
Oi9 hf[ps//wwwdenncgov/about/divisions/energy-mineraland-land-resources/s[ormwaler/slprmwaterprpgram \\ /
•q /nptles-construction-program.e0 00montheofwmpleteirvapxtionf site and SODDING
g for inspection at all times.It is recommended a copy h kept in a permits box.Ref:G.S.113E-NC through
R� G.S.113E-57 Sections ISA NCAC 04A.0101 through ISA NCAC 04E.0504 General Permit NCG OI1N100
a NPDES for Construction Activities
.-
\ , 11. Self-irupections far erosion and edievtation control measures are to h performed at least once every seven /I \ \ / �� arm.BIM illE vrnlvs
calendar days anti within za hours of every rain fit ENCer than 1 inch.Any needed repairs specified
ebe
d
made immediately mmaintain measures designed.All ESC measures snail be maintaimdae specified in M���'��
SITE , the construction details on this Plan.A rain gauge anal)be installed at the proved site for monitoring. \
12. Inspection and anal acceptance letters.When the protect is complete,the Pennittaes shall contact DEMLR W / / \\\ / snna zero TnmMwn Neces
closeout the MSC Plan.After DEMLR informs the permitree oftne project close out,via inspection report,
Ilk
'A NR the pertnittee shell visit"deq.nc govMCG01"to submit an electronic Notice'f termination re-NOT).A E100 Mi al e
fp annual general permit fee will be charged the e-NOT haz been filledou. / \n /
b �AwaoAo R.t c z1 � CORRECTLY.
o \moo
'°ey '� - Koonce Road SR-146 \
.. 4010011.°111.
A c'o 0 1 / CONSTRUCTION
. N Ro / �� ROLL WATER To u
o / J LIMITS WITH 'IA✓ ui III..We
0'9
iii
AM y�RovRo FOR JILTFENCE\\
LDIan zr. 28 V 7
\ _____Z
ilr:
N APPEARANCE OF GOOD SOD
^•1ra`I V q% / CONSTRUCTION 26 °:yfl.0ilt
pIIpI III IIIr..r,,.,nv„ao.r.x.*
VICII YIT 1 MAP •jam LIMIT9 / Y ENTRANCCONSTTRU TION /1IIIVk11 I�_VI II urmcxemn
WATTLE '�' l `
N.T.S.
�0 �L1 C - awe. n,»nk Min MO
O\ REINFORCED f~ �
CONSTRUCTION m ...--/
I \ merawrx °`"sr"oor"..
DATE: I PAGE: 4. L ITS \ SILT
E 'o
- • - a MIN. - /SILT FENCE \ \ 16 CONSTRUCTION 25 J \ 31
Lot Planr� LIMITS `Ill
7. I I I I I I I I I I I I I I I I I I I I I I I 11. \ \ G' 17 018 n �t a _ OS2 DATE: PAGE:
- \\ Lot Plan „
STEEL FENCE
14 "H" ZO
muse aEA \ \ 2A /
AeovE TH F 'I -. 1 `- ______Lot
"G"
\\ ��o�s� \ de Corner Read \ ¶ u I , , I , e % %j
HARDWARE CLOWIRE THE\ FRONT VIEW \FiiER FIPBI:ICNCE' \ �'f/ �.y ~ RHa R JL OU JL �Hous I I �C= HOUSES � NOUS HousE
TER OF.57
STEEL FENCE
WASHED BTDNE NroaDLIDe POST SET ND CLOTH IN TRENCH x - I._.l _ j -RD �.� Ay
ao'.'' J =RDA J
0Ro0ND NOT ES: y x vet should
N w 3 INLET
OF CURa AY ROADWAY "AY AY
1.Hches.a cloth and"gravel shouts overlay the silt fence at least 12 \
\\ CI CURB Notes:
f `\\ 2.Stone outlets should be placed on low elevation areas of silt fence O y \ 111
Q 0 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland
URY and based on field conditions. ��I \ \ \ 33 Qy LEGEND boundary and/or around protectetl trees,providing a radius of at least 1.25 feet for each
MAINTENANCE: oJO ` \ 9 / 052 -t'•i inch of trunk diameter.
BURY WIRE FENCE AND F 1.Per NCG-01,inspect outlet at lest once a week and after each 1 inch or , 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on
HARDWARE CLOTH FILTER FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. I R e� FFr�r1I N schematic/diagram and field adjusted,if necessary,for placement at low points.If lots are
2.Freshen stone when sediment accumulation exceeds 6inches. ¢� \ 1+4 ,,' contiguous and have different land owners or builders,each lot should have individual Silt
3.Keep mesh free of debris to provide adequate flow. Fancea.
4 SILT FENCE
SECTION VIEW 4.Remove sediment when half of stone outlet is covered. 49," \ / r SILT FENCE OUTLET OM 3.Install required Silt Fence within l0 feet of property line to ensure there is no conflict with
J �/ CONSTRUCTON ENTRANCE set t It is the responsibility f the builder to ensure the lnstellatlon of sediment
5.Replace stone as nestled to facilitate de-watering. r \ septic system. p y
ANC-Envir enrol.peg Gj '-r CURB INLET = control measures aces ofimpactth septic system and repair area(s)
SILT FENCE OUTLET \ \ �o� 4 / 4 4 At least neConrnuctio Entrance/Exit is to be installed per lot
Slade Corner Road 5 wasebnaantipherardedicatedformanagngbuldngmeeralwasteshallbeat
1 \ \ least 50 feet away from t drainlets or drainage ditches unless it can be shown that
\ ,-ZT no other alternative exists.If this separation cannot be achieved,these areas must be
VDJI IJ A� contained behind Silt Fence.
DATE: PAGE: S1 � `� / Ia6.Inlets downstream of disturbances should be protected;streets should be swept when
sediment from the construction activity is present.
Silt ock/watue sit sock/wa l]1�\\ \ J \ ..\NC-Environmental.peg ],Details for Silt Fence,Silt Fence Outlets,Construction Entrances antl other measures are
t le NOT: \ \ \111B1
//\\aow�� MI� Row MI 1. n \ provided on additional sheets.Erosion and sediment control details are not drawn to stele.
R..11#1i=_ R.4II C ,k,rcic,D^TE.f?12/2020TYPICAL LOT LAYOUT WITH CURB AND GUTTER
Vi
2 2 li ll, poet \ \ 3
stakes 'I Stokes a r1 lmto the desired length rtoh 1.logs do \ 6 _ 1 - --�
...of 10 feet beyond the..We
\\\ \ \ �- '' \ \ DATE: PAGE,
SECTION SECTION slope.s'1s«uweu�m located clew \
�q (flat areas land �,a Me silt
��� , ��
eats%`' 9'CoM... sock/wank.).g pa°natem orte \ \ \ \/ . I.%'
l) soo...e.stakes should he placed at a GROUND STABILIZATION \ \ �// /� \ •'
SITE AREA STABILIZATION \ \ �\ \ 0a / •
Trench-^ "� EXCEPTIONS \ \ \ Q'O •••
o 1/2 Mulch or
g 9roune a Mn 6 f DESCRIPTION TIME FRAME / \ \ \ \ ZO4' / •_••••-• one,
uNrRENCHED INSTALLATION 1 PERIMETER DIKES, 7 DAYS NONE \\ 1 \\ \ \ \ /,p RN, •••••••• WAyO°a.
T...w"w.».•,w,.W=°,.".w»a.••wv.,._"..,.+__ SWALES,DITCHES
ISOMETRIC VIEWso.Avattle to hold CM place during run.MAINTENANCE &SLOPES •••.••••••••..t
1 Inspect N after HIGH QUALITY 7 DAYS NONE \ \ \ \ \ \_ /�•••••••••••••••R
Remove
CONPOSr sou M1AL FLOW PATESea.,inch or reater WATER ZONES \ \ \ \ •'.,� .. •••••I I I I I••
r°,une<nm<e s«xa maareea goo m:;r lm� cioo"moo<>�o"�ml leoO�ml 3oe"o°n z. rats rape( clogged or needed to allow for eclogue... (HOW) \ \ \ \ I /?, - aMln. '1•MA •• III I�.:_:
SLOPES STEEPER 7 DAYS IF SLOPES ARE \ \ / , •• •,V 11.
snenFlow-of-° ��at sock/ Rsum(.xj c�,FT)('°sFmj 1F000 rr 3. THAN 3:1 10'OR LESS IN \ \ \ \ \ \ / .- y'y'�
tte funs nil caea ) (.0 nil ReinsMIllfd_ LENGTH AND ARE 1 \ \ \ �'i"- r.`D�e
NOT STEEPER --y
"TX",a.q�a°°i." ar'jn 'mitt ala�rt smut eon) s. .ha"ti«.«. \
- - .aged or dislodge.
Y
�s, Mtn t tie �zet 0/rk Area 4 aemr.we� Pel.ceana .1n THAN 2:1, 14 \ \ ) I p
IAmAmI I/m/mi vm/mi vm/nil vm/m1 ...um . pe namy.nulnea. DAYS ARE V \ \ construction: Maintenance,
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION ALLOWED �� \ V Clear the entrancens extrarea a all vegetation,roots,ndother ab;e mname Per bCG-D,inspectsHeaatnpea 11 oo 1 a after each l mph or
material and properly grade it. greater rainfall,make any required repairs immediately.
L_- SLOPES 3:1 OR 14 DAYS 7 DAYS FOR /
z.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud Or sediment
FLATTER SLOPES GREATER smooth it. from leaving the construction site.This may require periodic
THAN 501 IN \ \\\ 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone.
LENGTH ` \ \ 4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or
ALL OTHER AREAS 14 DAYS NONE(EVOLVE �_ \ \ l \ \ subject to seepage or high water table. tracked onto public roadways.
WITH SLOPES FOR PERIMETERS -�
DATE:, P n M E.w sta I In nrIth ult..ic witlf ,.fire W e F.n< Filler Fabric Price: FLATTER THAN 4;1 AND HOW ZONES) \ \ \ \ . \ \ I CONSTRUCTION ENTRANCE/EXIT
L°ate, ex. a.n g a c pore fie Fence pore Back.trench \ \
_ ,h°r rap \ \� ` \ ` \\ \ PAGE 1 of 2
Steel Post thoroughly \
\ \ �� TOTAL DISTURBED ACREAGE: 2.84 ACRES
ST p General Erosion Control Notes • - \
Plastic or 1 J
w.tea 18"° t•T !� -� 1.only the areas shown shall be disturbed. \ \ \ \ 1 I I / LOT EROSION CONTROL PLAN
e� � • +I z All disturbed D shall be grossed and \ V LOTS 16 19, 26 & 27
yy fix,\/� • had ass as pssi le and maintained
I
/� )_ K X_ �maoe m.o-<"<n / 1 until pemanent cove established. _ 1`\ �\ I I N
I )
1 \ 1 WOODHA 777EN
Construction: • Filter Fabric ow / I \ \ \
standard1. Construft the sediment harder of strengk or extra st��gk synthetic filler khea. CROSS SECTION VIEW I \ I
2.Ensure matthe height of the sediment fence does not exceed inches hove the ground.(Higher fence. I!
tonimpound
l amen°isede`froromaconnn ausrollsNamalaneih'offnu na)niertoavwal ne.whenjointsare \ \\ 1 I \\ I \ �� FOR
a summ�e wire d.s securely filter hreme,FbtenNaeurelro`UeUapaeSid ;.Pe.Egin, Maintenance: MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION FURR CONSTRUCTION
side of the impost.wire a plastic xlo sea should nave a minim m 9O pound(male strength.°upslope 1. mono greaerrainee.M eft,
ealeeb.
6. used,..Po.a ma.imum msfeet even.Supports should be amren ,tea,,derma.,
securely too m.ground a minimum of24General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per weak minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be
s Extra strength fltertanne mem root post coating aces not requires wire mean support knee.Securely AND DEVELOPMENT INC.
krkbnsa�� y posts pore plastic P should have a minimum ul poundknsik Remove
�.n as
necessary to
provide
adequate
relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. t
ea M1ea m Haase cola.am a�nrn.a tie.aloft m.ro w.a line of posts and are to avaa..rmlmng me fence au rig Gravel Construction Entrance-The gravel pad should remain in a condition to prevent on d or sediment from leaving the construction site.This may require periodic toptlressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all
7.Excavate trench y p g p p p DbjeciDnablematedalBapioed,washed,DreackedDnmpubrDroaaways. McLAUCHLIN TOWNSHIP HOKE COUNTY
upslope 4.Remove
all
to ng grad land naa unstable
fie,the can deposits
9 Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure
rule filter fabric and compact.Thorough< pa on of me hack,.is drainage area has been properly.tablll:m. that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times,Take care to not undermine the fence during cleanout operations. SCALE:�" ��0' JULY 2023
Do not attach finerseoklu exce5n9 cog ens Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth
GRAPHIC SCALE
<nerelmautf.na Pe,km�an and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
too 0 5o i W 200 400
1O..\NC-Envir omen tol.;peg Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be
SILT FENCE repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass.
Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET )
sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft.
Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE MF-0106
LAST SAVED:7/19/2023 4:58 PM LAST PLOTTED:S/6/2023 2:42 PM PLOTTED Eck Dennis Gilbert FILENAME:O\CURRENT JOBS\FURR CONSTRUCTION\23-2651-0J WOOOHAVEN-EC\PLANS\WOODHAVEN EC-LOTS 16-19.26 00 2JDWG