Loading...
HomeMy WebLinkAbout240008_Sludge Survey (Extension)_20230912DocuSign Envelope In DE36B2E5-r) )A-4F5B-9CCE-BA93657AF1AQ ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Harry Hart Hart Farm 7451 Green Swamp Rd Bolton, NC 28423 Dear Harry Hart: NORTH CAROLINA Environmental Quality September 10, 2023 Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS240008 Hart Farm Lagoon 1 & 2 Animal Waste Management System Columbus County The Division of Water Resources received your sludge survey information on September 05, 2023. With the survey results, you requested an extension of the sludge survey requirement for the lagoon 1 & 2 at the Harry Hart Farm facility. Due to the amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed for Lagoon 1 until December 31, 2024 and not needed for Lagoon 2 until December 31, 2028. The next sludge survey for the lagoon 1 at Harry Hart Farm should be performed before December 31, 2024 and lagoon 2 should be performed before December 31, 2028. Please retain this letter and keep it with your farm records for reference. Please call me at (919) 707-3667 if you have any questions. Sincerely, Docu Signed by: zv 7A2F73C36041485... Melissa Abbott Animal Feeding Operations Program cc: Wilmington Regional Office, Water Quality Regional Operations Section Laserfiche File No: 240008 North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636 NORTH CARCLINA 919.707.9129