HomeMy WebLinkAbout240008_Sludge Survey (Extension)_20230912DocuSign Envelope In DE36B2E5-r) )A-4F5B-9CCE-BA93657AF1AQ
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Harry Hart
Hart Farm
7451 Green Swamp Rd
Bolton, NC 28423
Dear Harry Hart:
NORTH CAROLINA
Environmental Quality
September 10, 2023
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS240008
Hart Farm Lagoon 1 & 2
Animal Waste Management System
Columbus County
The Division of Water Resources received your sludge survey information on September 05, 2023.
With the survey results, you requested an extension of the sludge survey requirement for the lagoon
1 & 2 at the Harry Hart Farm facility. Due to the amount of treatment volume available, and the
rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed
for Lagoon 1 until December 31, 2024 and not needed for Lagoon 2 until December 31, 2028.
The next sludge survey for the lagoon 1 at Harry Hart Farm should be performed before December
31, 2024 and lagoon 2 should be performed before December 31, 2028. Please retain this letter
and keep it with your farm records for reference.
Please call me at (919) 707-3667 if you have any questions.
Sincerely,
Docu Signed by:
zv
7A2F73C36041485...
Melissa Abbott
Animal Feeding Operations Program
cc: Wilmington Regional Office, Water Quality Regional Operations Section
Laserfiche File No: 240008
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636
NORTH CARCLINA
919.707.9129