HomeMy WebLinkAbout310191_Sludge Survey (Extension)_20230912DocuSign Envelope ID: 9764B35F-OD21-4CSO-AADC-F329lF269543
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Thomas Smith
Thomas Smith Farm
214 Tapp Farm Rd
Pink Hill, NC 28572
Dear Thomas Smith:
NORTH CAROLINA
Environmental Quality
September 06, 2023
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS310191
Thomas Smith Farm TS 1 & TS 1 2nd Stage
Animal Waste Management System
Duplin County
The Division of Water Resources received your sludge survey information on September 05, 2023.
With the survey results, you requested an extension of the sludge survey requirement for the lagoon
TS 1 & TS 1 2nd Stage at the Thomas Smith Farm facility. Due to the amount of treatment volume
available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge
survey is not needed for TS 1 until December 31, 2028 and not needed for TS 1 2nd stage until
December 31, 2026.
The next sludge survey for the lagoon TS 1 at Tommy Stone Farm should be performed before
December 31, 2028 and lagoon TS 1 2nd Stage should be performed before December 31, 2026.
Please retain this letter and keep it with your farm records for reference.
Please call me at (919) 707-3667 if you have any questions.
Sincerely,
DocuSigned by:
�� ��
G a.e
7A2F73C36041485...
Melissa Abbott
Animal Feeding Operations Program
cc: Wilmington Regional Office, Water Quality Regional Operations Section
Laserfiche File No: 310191
D � ��� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636
Moan caaouNn
919.707.9129