Loading...
HomeMy WebLinkAbout310191_Sludge Survey (Extension)_20230912DocuSign Envelope ID: 9764B35F-OD21-4CSO-AADC-F329lF269543 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Thomas Smith Thomas Smith Farm 214 Tapp Farm Rd Pink Hill, NC 28572 Dear Thomas Smith: NORTH CAROLINA Environmental Quality September 06, 2023 Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS310191 Thomas Smith Farm TS 1 & TS 1 2nd Stage Animal Waste Management System Duplin County The Division of Water Resources received your sludge survey information on September 05, 2023. With the survey results, you requested an extension of the sludge survey requirement for the lagoon TS 1 & TS 1 2nd Stage at the Thomas Smith Farm facility. Due to the amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed for TS 1 until December 31, 2028 and not needed for TS 1 2nd stage until December 31, 2026. The next sludge survey for the lagoon TS 1 at Tommy Stone Farm should be performed before December 31, 2028 and lagoon TS 1 2nd Stage should be performed before December 31, 2026. Please retain this letter and keep it with your farm records for reference. Please call me at (919) 707-3667 if you have any questions. Sincerely, DocuSigned by: �� �� G a.e 7A2F73C36041485... Melissa Abbott Animal Feeding Operations Program cc: Wilmington Regional Office, Water Quality Regional Operations Section Laserfiche File No: 310191 D � ��� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636 Moan caaouNn 919.707.9129