Loading...
HomeMy WebLinkAboutNCC201074_NOT Closeout Documents_20230908 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Lee Project: Pfizer Pharmaceuticals GTx2 Contractor River basin: Cape Fear Person financially responsible:Wyeth LLC,a subsidiary of Pfizer-Tony Project#: LEE-2020-028 Mulcahy,Site leader Address: 4300 Oak Park Road,Sanford,NC 27330 1. Project Location: Oak Park Road,Sanford Pictures: No 2. Weather and soil conditions: Sunny and Dry-Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Connor Jarvis, Rob Woodside,&John Barbour Title: Pfizer Representatives Inspection report: Sent Report Date given/sent: September 05,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Celina Amaya Others present: N/A Date of inspection: September 05,2023 Time arriving on site: 1:00 PM Time leaving site: 1:30 PM CC: