CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Heath Hidlay, hhidlay@res.us (717-543-7711)
Through: Environmental Banc and Exchange, LLC (EBX)
We formally request a credit release for the Bobs Branch Mitigation Site (DWR Project # 2020-
1384 v1) for completion of Task #1 and Task #7 per the approved credit release schedule, which is
included in the Attachments with this request. The following documents have been submitted to
DWR for Task #1 and Task #7 and are either pending review or have already been approved:
1) BPDP (approved 3.15.2023)
2) MBI (approved 3.15.2023)
3) Conservation Easement Recorded (and Plat) with Longterm Steward and Conservation
Easement Holder Assigned
4) Bond Pending Signature for Construction (#612402585) Penal Sum $150,000
Credits requested for release are detailed below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration 25 108,399.300
Buffer Preservation
Buffer Enhancement
Generated Nitrogen Nutrient Offset
Delivered Nitrogen Nutrient Offset
(Jordan sites only)
Generated Nitrogen Nutrient Offset
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
Signature:
Attachments: 1) Approved Project Credit Table (Asset Table approved by DWR, whether it is the
BPDP table), 2) Approved Credit Release Schedule (approved credit release schedule, from the
MBI), 3) Excel Credit Release Schedule 4) Construction Bond (Pending Signature) #612402585
Table 7. Bobs Branch Project Credits
Project Area
N Credit Conversion Ratio (ft2/pound)
P Credit Conversion Ratio (ft2/pound)
Credit Type Location
Subject? (enter
NO if
ephemeral or
ditch 1)
Feature Type Mitigation Activity Min-Max Buffer
Width (ft)Feature Name Total Area (ft2)
Total (Creditable)
Area of Buffer
Mitigation (ft2)
Initial Credit
Ratio (x:1)% Full Credit Final Credit
Ratio (x:1)
Convertible to
Riparian
Buffer?
Riparian Buffer
Credits
Convertible to
Nutrient Offset?
Delivered
Nutrient
Offset: N (lbs)
Delivered
Nutrient
Offset: P (lbs)
Buffer Rural Yes I / P Restoration 0-100 BS1, BS2, BB1 370,183 370,183 1 100%1.00000 Yes 370,183.000 No ——
Buffer Rural Yes I / P Restoration 101-200 BS1, BS2, BB1 31,099 31,099 1 33%3.03030 Yes 10,262.680 No ——
Buffer Rural No Ephemeral Restoration 0-100 BS2 49,597 49,597 1 100%1.00000 Yes 49,597.000 No ——
Buffer Rural No Ephemeral Restoration 101-200 BS2 2,549 2,549 1 33%3.03030 Yes 841.171 No ——
Buffer Rural Yes I / P Restoration 20-29 BB1 2,783 2,783 1 75%1.33333 Yes 2,087.255 No ——
Buffer Rural No I / P Restoration 0-100 No Credit Area -BB1,
BS2 9,078 0 1 100%Yes —No ——
———
———
———
———
———
———
———
———
———
———
———
———
———
Totals (ft2):465,289 456,212 432,971.106 0.000 0.000
Total Buffer (ft2):465,289 456,212
Total Nutrient Offset (ft2):0 N/A
Total Ephemeral Area (ft2) for Credit:55,414 55,414
Total Eligible Ephemeral Area (ft2):117,139 11.8%Ephemeral Reaches as % TABM
Enter Preservation Credits Below Total Eligible for Preservation (ft2):155,096 0.5%Preservation as % TABM
Credit Type Location Subject?Feature Type Mitigation Activity Min-Max Buffer
Width (ft)Feature Name Total Area (sf)
Total (Creditable)
Area for Buffer
Mitigation (ft2)
Initial Credit
Ratio (x:1)% Full Credit Final Credit
Ratio (x:1)
Riparian
Buffer Credits
Buffer Rural No Ephemeral 0-50 BS2 2,719 2,719 5 100%5.00000 543.800
Buffer Rural No Ephemeral 20-29 BS2 549 549 5 75%6.66667 82.291
Buffer —
Buffer —
Buffer —
Preservation Area Subtotals (ft2):3,268 3,268
Square Feet Credits
456,212 432,971.106
0 0.000
3,268 626.091
459,479 433,597.198
Square Feet Credits
Nitrogen:0.000
Phosphorus:0.0000
TOTAL AREA OF BUFFER MITIGATION (TABM)
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
Nutrient Offset:
Preservation:
Total Riparian Buffer:
Cape Fear - Randleman
N/A
N/A
Restoration:
Enhancement:
Mitigation Totals
1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).
last updated 08/03/2020
10
VIII. CREDIT RELEASE SCHEDULE
A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by
DWR, it is agreed that the Riparian Buffer Credits associated with the Bank Parcel will become
available for sale to a third party in accordance with the Credit Release Schedule below in Table
3.0.
Table 3.0 - Credit Release Schedule for Riparian Buffer Credits
Task
Project Milestone
%
Credit
Availa
ble for Sale
1 Instrument and BPDP Approved by DWR, Conservation Easement
Recorded* and Financial Assurance Posted
20
2
All Riparian Earthwork & Mitigation Activities, Planting and Installation of Monitoring Devices completed, easement boundaries adequately marked, all applicable permits obtained. A site visit performed by DWR is required for this task
20
3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10
4 Monitoring Report #1: Approved by the DWR** & Financial Assurance Posted 10
5 Monitoring Report #2: Approved by the DWR** & Financial Assurance Posted 10
6 Monitoring Report #3: Approved by the DWR** & Financial Assurance Posted 10
7 Item B (1) of Section IX in this Instrument has been completed and approved by DWR. 5
No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship
8 Monitoring Report #4: Approved by the DWR** & Financial Assurance Posted 5
9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10
Total 100%
* For specification, please see Section V in this Instrument
** DWR Approval provided upon a determination that the site is meeting performance standards contained within the
approved BPDP
B. DWR may modify the credit release schedules based on the information submitted or the order in
which required information is received. DWR will notify the Sponsor of any modification to the
credit release schedule.
C. Any major deviations to the Bank Parcels that were not authorized in writing by DWR prior to
implementation may affect the amount of riparian buffer credits that will be generated by the Bank
Parcels.
IX. PROCEDURE FOR DEBITING AND CREDITING
Credit Ledgers
As‐Built Credits
Original Mit Plan Credits 433,597.198
Riparian Buffer Credit release schedule TOTAL (as-built) Credits:
Credit Release # % Buffer
1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded* and
Financial Assurance Posted 20% 86,719.440
2
All Riparian Earthwork & Mitigation Activities, Planting and Installation of
Monitoring Devices completed, easement boundaries adequately marked, all applicable
permits obtained. A site visit performed by DWR is required for this task 20% 86,719.440
3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10% 43,359.720
4 Monitoring Report #1: Approved by the DWR** & financial assurance posted 10% 43,359.720
5 Monitoring Report #2: Approved by the DWR** & financial assurance posted 10% 43,359.720
6 Monitoring Report #3: Approved by the DWR** & financial assurance posted 10% 43,359.720
7 Item B (1) of Section X in this Instrument has been completed and approved by DWR.5% 21,679.860
8 Monitoring Report #4: Approved by the DWR** & financial assurance posted 5% 21,679.860
9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been
conducted 10% 43,359.720
108,399.300 Requested Credits for Task 1 and Task 7