Loading...
HomeMy WebLinkAbout20201384 Ver 1_EBX_BobsBranch_20201384v1_Credit Release Request Task1_Task7_20230911 3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 September 11, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Heath Hidlay, hhidlay@res.us (717-543-7711) Through: Environmental Banc and Exchange, LLC (EBX) We formally request a credit release for the Bobs Branch Mitigation Site (DWR Project # 2020- 1384 v1) for completion of Task #1 and Task #7 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #1 and Task #7 and are either pending review or have already been approved: 1) BPDP (approved 3.15.2023) 2) MBI (approved 3.15.2023) 3) Conservation Easement Recorded (and Plat) with Longterm Steward and Conservation Easement Holder Assigned 4) Bond Pending Signature for Construction (#612402585) Penal Sum $150,000 Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 25 108,399.300 Buffer Preservation Buffer Enhancement Generated Nitrogen Nutrient Offset Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Nitrogen Nutrient Offset Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: 1) Approved Project Credit Table (Asset Table approved by DWR, whether it is the BPDP table), 2) Approved Credit Release Schedule (approved credit release schedule, from the MBI), 3) Excel Credit Release Schedule 4) Construction Bond (Pending Signature) #612402585 Table 7. Bobs Branch Project Credits Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter NO if ephemeral or ditch 1) Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (ft2) Total (Creditable) Area of Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Convertible to Riparian Buffer? Riparian Buffer Credits Convertible to Nutrient Offset? Delivered Nutrient Offset: N (lbs) Delivered Nutrient Offset: P (lbs) Buffer Rural Yes I / P Restoration 0-100 BS1, BS2, BB1 370,183 370,183 1 100%1.00000 Yes 370,183.000 No —— Buffer Rural Yes I / P Restoration 101-200 BS1, BS2, BB1 31,099 31,099 1 33%3.03030 Yes 10,262.680 No —— Buffer Rural No Ephemeral Restoration 0-100 BS2 49,597 49,597 1 100%1.00000 Yes 49,597.000 No —— Buffer Rural No Ephemeral Restoration 101-200 BS2 2,549 2,549 1 33%3.03030 Yes 841.171 No —— Buffer Rural Yes I / P Restoration 20-29 BB1 2,783 2,783 1 75%1.33333 Yes 2,087.255 No —— Buffer Rural No I / P Restoration 0-100 No Credit Area -BB1, BS2 9,078 0 1 100%Yes —No —— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— Totals (ft2):465,289 456,212 432,971.106 0.000 0.000 Total Buffer (ft2):465,289 456,212 Total Nutrient Offset (ft2):0 N/A Total Ephemeral Area (ft2) for Credit:55,414 55,414 Total Eligible Ephemeral Area (ft2):117,139 11.8%Ephemeral Reaches as % TABM Enter Preservation Credits Below Total Eligible for Preservation (ft2):155,096 0.5%Preservation as % TABM Credit Type Location Subject?Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (sf) Total (Creditable) Area for Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits Buffer Rural No Ephemeral 0-50 BS2 2,719 2,719 5 100%5.00000 543.800 Buffer Rural No Ephemeral 20-29 BS2 549 549 5 75%6.66667 82.291 Buffer — Buffer — Buffer — Preservation Area Subtotals (ft2):3,268 3,268 Square Feet Credits 456,212 432,971.106 0 0.000 3,268 626.091 459,479 433,597.198 Square Feet Credits Nitrogen:0.000 Phosphorus:0.0000 TOTAL AREA OF BUFFER MITIGATION (TABM) TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset: Preservation: Total Riparian Buffer: Cape Fear - Randleman N/A N/A Restoration: Enhancement: Mitigation Totals 1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a). last updated 08/03/2020 10 VIII. CREDIT RELEASE SCHEDULE A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that the Riparian Buffer Credits associated with the Bank Parcel will become available for sale to a third party in accordance with the Credit Release Schedule below in Table 3.0. Table 3.0 - Credit Release Schedule for Riparian Buffer Credits Task Project Milestone % Credit Availa ble for Sale 1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded* and Financial Assurance Posted 20 2 All Riparian Earthwork & Mitigation Activities, Planting and Installation of Monitoring Devices completed, easement boundaries adequately marked, all applicable permits obtained. A site visit performed by DWR is required for this task 20 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10 4 Monitoring Report #1: Approved by the DWR** & Financial Assurance Posted 10 5 Monitoring Report #2: Approved by the DWR** & Financial Assurance Posted 10 6 Monitoring Report #3: Approved by the DWR** & Financial Assurance Posted 10 7 Item B (1) of Section IX in this Instrument has been completed and approved by DWR. 5 No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship 8 Monitoring Report #4: Approved by the DWR** & Financial Assurance Posted 5 9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10 Total 100% * For specification, please see Section V in this Instrument ** DWR Approval provided upon a determination that the site is meeting performance standards contained within the approved BPDP B. DWR may modify the credit release schedules based on the information submitted or the order in which required information is received. DWR will notify the Sponsor of any modification to the credit release schedule. C. Any major deviations to the Bank Parcels that were not authorized in writing by DWR prior to implementation may affect the amount of riparian buffer credits that will be generated by the Bank Parcels. IX. PROCEDURE FOR DEBITING AND CREDITING Credit Ledgers As‐Built Credits Original Mit Plan Credits 433,597.198 Riparian Buffer Credit release schedule TOTAL (as-built) Credits: Credit Release # % Buffer  1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded* and Financial Assurance Posted 20% 86,719.440                   2 All Riparian Earthwork & Mitigation Activities, Planting and Installation of Monitoring Devices completed, easement boundaries adequately marked, all applicable permits obtained. A site visit performed by DWR is required for this task 20% 86,719.440                   3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10% 43,359.720                   4 Monitoring Report #1: Approved by the DWR** & financial assurance posted 10% 43,359.720                   5 Monitoring Report #2: Approved by the DWR** & financial assurance posted 10% 43,359.720                   6 Monitoring Report #3: Approved by the DWR** & financial assurance posted 10% 43,359.720                   7 Item B (1) of Section X in this Instrument has been completed and approved by DWR.5% 21,679.860                   8 Monitoring Report #4: Approved by the DWR** & financial assurance posted 5% 21,679.860                   9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10% 43,359.720                   108,399.300               Requested Credits for Task 1 and Task 7