Loading...
HomeMy WebLinkAboutSite Inspection 9.11.23 NC 69page:1 Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190210 NCDOT - NC 69 Widening (A-0011C) Clay NCDOT - NC 69 Widening (A-0011C) NC DOT Division 14 - Sylva 9/11/2023 Routine Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-83° 49' 32''+35° 00' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Inspection Summary: page:2 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190210 9/11/2023 Blazer, Keith Site Inspection (DOT)Routine Site inspection was conducted on September 11, 2023 by Kevin Mitchell with the Asheville Regional Office. Kevin Barnett, Reid Whitehead,and Brian Luther were present during the inspection. The following are items that need attention: - Station L 204+00 LT - SDOs need maintenance. Recommend additional cover on slopes above JS. JS is headcutting and DEO offered suggestions for repair. - Station L 203+00 RT - Recommend additional cover on slope. JS is headcutting above 60" culvert. DEO offered suggestions for repair. - Station L 159+00 LT - Energy dissipator structure is piping and needs repair. Recommend removing fill, wrapping structure with fabric, and adding mix of large and fine material to fill voids. I have attached a typical in the email. - Station L 149+00 - 150+00 - Recommend using a camera to investigate potential culvert failure under NC 69. This was discussed during the inspection on 6.12.23 after multiple sediment losses into the JS. Coir fiber logs need to be removed from the stream after culvert is stabilized. Continue to meet NPDES cover requirements. 20190210 Blazer, Keith page:3 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit:9/11/2023 Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: