Loading...
HomeMy WebLinkAboutWQ0002708_Monitoring - 07-2023_20230829 (5)Monitoring Report Submittal ..................................................... Permit Number#* WQ0002708 Name of Facility:* Wrenn Road WTF Month: * July Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: * Name of Submitter: * Signature: Date of submittal: Initial Review Year:* 2023 Upload Document* July 2023 WQ002708 NDAR.pdf 1.96MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). emily.fentress@raleighnc.gov Emily Fentress Reviewer: Wanda.Gerald 8/29/2023 This will be filled in automatically Is the project number correct?* W00002708 Is the monitoring report accepted?* Yes NO Regional Office* Raleigh Reviewer: _anonymous Review Date: 9/12/2023 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page l of T_ Permit No.: W00002708 Facility Name: Wrenn Road County: Wake Month: July Year: 2023 Field Name: 01A Field Name: 01B Field Name: 02A Field Name: 02B Did irrigation occur Area (acres): 19.6 Area (acres): 16.18 Area (acres): 13.33 Area (acres): 20.15 at this facility? Cover Crop:Fescue/Trees Cover Crop: P� Fescue/Trees Cover Crop: P� Fescue/Trees Cover Crop: P� Fescue/Trees ❑ YES 7 NO Hourly Rate (in): 0.11 Hourly Rate (in): 0.13 Hourly Rate (in): 0.15 Hourly Rate (in): 0.13 Annual Rate (in): 26 Annual Rate (in): 26.9 Annual Rate (in): 36.7 Annual Rate (in): 28.9 Weather Freeboard Field Irrigated? YES 0 NO Field Irrigated? YEs NO Field Irrigated? YE5 NO Field Irrigated? YES] NO >. U O 7 iC E O c6 0) ° cn N A Q V '' °- N O 0- Q 'p d N F- .a' m >, C `° J= 7 �' C x o '° J 47 'a N O Q Q 'D O O .a' >, _C `° J= E LA O �' C 'x ° `° J d a d O a Q -O d o' _ LS7 T C `° J= L� 7 �' C X ° J U� 'O N O a > Q N F .a' _ m >+ _C J= E m 7 �' C x ° J 3 °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 0.35 2.73 2 0 2.73 3 0 2.73 4 0 2.73 5 0.44 2.62 6 0 2.62 7 1.02 2.62 8 0.05 2.72 9 0.45 2.72 10 0 1 2.76 11 0 2.74 12 0 2.71 131 1 0 2.7 14 1.46 2.8 15 0.25 2.77 16 0.09 2.81 17 0 2.79 18 0 2.74 191 1 0 2.74 201 1 0 2.71 21 0 2.61 22 0 2.61 23 0.22 2.51 24 0.04 2.65 25 0 2.62 261 1 0 2.58 27 0 2.58 28 0 2.51 29 0 2.51 30 0 2.41 31 0 1 2.47 1 Monthly Loading: 0 0.00 0 0.00 0 0.00 0 r4m 0.00 12 Month Floating Total (in): V3.76 5.26 0.00 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page i of S Permit No.: W00002708 Facility Name: Wrenn Road County: Wake Month: July Year: 2023 Field Name: 03A Field Name: 03B Field Name: 04A Field Name: 04B Did irrigation occur Area (acres): 23.38 Area (acres): 9.74 Area (acres): 21.87 Area (acres): 15.4 at this facility? Cover Crop:Fescue/Trees Cover Crop: P� Fescue/Trees Cover Crop: P� Fescue/Trees Cover Crop: p� Fescue/Trees ❑ YES ❑ NO Hourly Rate (in): 0.16 Hourly Rate (in): 0.17 Hourly Rate (in): 0.16 Hourly Rate (in): 0.18 Annual Rate (in): 42.3 Annual Rate (in): 44.1 Annual Rate (in): 41.4 Annual Rate (in): 40.9 Weather Freeboard Field Irrigated? YES NO Field Irrigated? YES 0 No Field Irrigated? YES 0 No Field Irrigated? YES NO T U m ° a) w a E ) o +�' .a .0 a) a a) f�0 p fn Z En -am-° U - >, 0- Q p �a Lo w - E 1 °a 5 0- % Q ° ..a)+ E 6) H '- _ °) T C ma m O O J E a0) 7- C E o 'X o co x° J �a E a) a o °_ % Q -° « E rn H- _ CM >. C @o R O J E Trn C- C E 'X ° �a 2° J °-° E a) a 0 4. Q -° a) w Em a) 1- •- _ rn T C F" m o J E Trn 7- C E�=a 'X ° ns fa 2 0 J a � E .0 °a ° °- Q o a) 4; E ~ .- _ CM T C mo ca 0° J E 7_ C E 'K ° cc n3 2° J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 0.35 2.73 2 0 2.73 3 0 2.73 4 0 2.73 5 0.44 2.62 6 0 2.62 7 1.02 2.62 8 0.05 2.72 9 0.45 2.72 10 0 2.76 11 0 2.74 121 1 0 2.71 13 0 2.7 14 1.46 2.8 15 0.25 2.77 16 0.09 2.81 17 0 2.79 181 0 2.74 19 0 2.74 20 0 2.71 21 0 2.61 22 0 2.61 23 0.22 2.51 24 0.04 2.65 25 0 2.62 26 0 2.58 27 0 2.58 28 0 2.51 29 0 2.51 30 0 2.41 31 0 2.47 Monthly Loading: 0 0.00 0 0.00 0 0.00 0 0.00 12 Month Floating Total (in): 5.07 6.91 0.84 2.12 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of S Permit No.: W00002708 Facility Name: Wrenn Road County: Wake Month: July Year: 2023 Field Name: 05A Field Name: 05B Field Name: 06A Field Name: 06B Did irrigation occur Area (acres): 20.05 Area (acres): 20.47 Area (acres): 19.18 Area (acres): 18.25 at this facility? Cover Crop:Fescue/Trees Cover Crop: p� Fescue/Trees Cover Crop: P� Fescue/Trees Cover Crop: P� Fescue/Trees ❑ YES 0 No Hourly Rate (in): 0.15 Hourly Rate (in): 0.18 Hourly Rate (in): 0.18 Hourly Rate (in): 0.18 Annual Rate (in): 29 Annual Rate (in): 39 Annual Rate (in): 41.3 Annual Rate (in): 39.7 Weather Freeboard Field Irrigated? YEs ❑ NO Field Irrigated? YES ❑ NO Field Irrigated? YES n No Field Irrigated? YE5 ❑ No >. ° U C Cz ° c6 CL E a)w 2 N a d a In N °- U '- Q M - E .N ° a > Q a d N E c _ m >+ C ',, m J E m 7 C E J m o E N �° Q ° d E a� _ T C @ J E rn 7 C E J m E N ' a i Q a N E _ >+ C m J E C E J m E d '° > a a N E a> a >. C m E o> 7 >' C E °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 0.35 2.73 2 0 2.73 3 0 2.73 4 0 2.73 5 0.44 2.62 6 0 2.62 7 1.02 2.62 8 0.05 2.72 9 0.45 2.72 10 0 2.76 11 0 2.74 12 0 2.71 13 0 2.7 141 1 1.46 2.8 15 0.25 2.77 16 0.09 2.81 17 0 2.79 18 0 2.74 19 0 2.74 201 0 2.71 21 0 2.61 22 0 2.61 23 0.22 2.51 24 0.04 2.65 25 0 2.62 26 0 2.58 27 0 2.58 28 0 2.51 291 0 2.51 30 0 2.41 31 0 2.47 Monthly Loading: 0 t53O jjj 0 0.00 0 0.00 0 0.00 12 Month Floating Total (in): 4.84 3.85 4.28 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page __�_ of 5 Permit No.: W00002708 Facility Name: Wrenn Road County: Wake Month: July Year: 2023 Field Name: 07A Field Name: 07B Field Name: Field Name: Did irrigation occur Area (acres): 18.69 Area (acres): 18.51 Area (acres): Area (acres): at this facility? Cover Crop:Fescue/Trees Cover Crop: P� Fescue/Trees Cover Crop: P� Cover Crop: P: ❑ YES ❑ NO Hourly Rate (in): 0.16 Hourly Rate (in): 0.18 Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 41.7 Annual Rate (in): 43.9 Annual Rate (in): Annual Rate (in): Weather Freeboard Field Irrigated? YES ❑ NO Field Irrigated? YES NO Field Irrigated? YES ❑ NO Field Irrigated? YES ❑ NO >` p o -a 0 d R w fa a E 0 Q .0 d a a) O In N- a U 7 .- T Q A a Q �p N � _0 E .T a O a � Q -a d ..�. m E a) F � _ m >` C = a m m p J E a m C E j o X O o = p J d -a E .d_ a- a o a 7 Q a d .�, E 1- "i _ >. C - a 0 O J E a m 7 C E 7 a O N m x O J � U E .N a- a o a Q a d ,«; E a� F •� - rn T C ti O J E � u 7- C E j a X O R m 2 0 2 J m - E 2 7 a O a � Q o d p E Io _ 2 ~ � _ 0) >, C a @ 0 J E a a) 7_ C E 7 0 X O m 2 0 J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 0.35 2.73 2 0 2.73 3 0 2.73 4 0 2.73 5 0.44 2.62 6 0 2.62 7 1.02 2.62 8 0.05 2.72 9 0.45 2.72 10 0 2.76 11 0 2.74 12 0 2.71 13 0 2.7 14 1.46 2.8 15 0.25 2.77 16 0.09 2.81 171 0 2.79 18 0 2.74 19 0 2.74 20 0 2.71 21 0 2.61 22 0 2.61 23 0.22 2.51 24 0.04 2.65 25 0 2.62 26 0 2.58 27 0 2.58 28 0 2.51 29 0 2.51 30 0 2.41 311 10 2.47 Monthly Loading: 0 0.00 0 0.00 0 0.00 0 0.00 12 Month Floating Total (in): 0.0010 0.00 I01:T►Lti►1H1Z691l:5ifil NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page S of S Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Q Compliant ❑ Non -Compliant ❑� Compliant ❑ Non -Compliant ❑✓ Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? 0 Compliant ❑ Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? 2 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. IOperator in Responsible Charge (ORC) Certification 11 Permittee Certification I ORC: Marla Dalton Certification No.: 1002064 Grade: SI Phone Number: 919-996-3674 Has the ORC changed since the previous NDAR-1? ❑ Yes P-1 No Permittee: Lisa Joseph Signing Official: Lisa Joseph Signing Official's Title: Resource Recovery Manager Phone Number: (919) 996-3172 Permit Exp.: 9/30/26 Signature ` / Date ✓ Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617