Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC232723_Site Plan or Location Map_20230911 EROSION & SEDIMENTATION CONTROL PLANS
LAUREL OAKS SUBDIVISION
PHASE 2 - SINGLE FAMILY RESIDENTIAL SUBDIVISION
LEE COUNTY, SANFORD , NC
FEBRUARY 7TH, 2023
PROJECT SITE DATA INDEX OF SHEETS
Z
ca��
sion Date
OWNER: SFTEN,LLC,a Delaware limited liability company \\oR`F �y/ Sheet1 No. COVER SHEET Sheet Title Rev 1-PhasRee 2 Update 02/07/23
2000 Aerial Center Parkway, 110A Montville,NC 27560 r
yf , - �. 1.02 GENERAL NOTES Rev 1-Phase 2 Update 02/07/23
DEVELOPER: D.R. HORTON,RALEIGH DIVISION - ;Wife Y 2.01 EXISTING CONDITIONS Rev 1-Phase 2 Update 02/07/23
/.v'►�00 A",
DEVELOPER ADDRESS: 2000 Aerial Center Parkway,Suite 110A Morrisville,NC 27560 a��A�d�P�Qs,�� 3.01 OVERALL E&SC PLAN Rev 1-Phase 2 Update 02/07/23
SITE ADDRESS: COMMERCE ROAD IN SANFORD,LEE COUNTY,NC ` ��9/- i 3.02 OVERALL E&SC PLAN-AERIAL Rev 1-Phase 2 Update 02/07/23
s� 1 PHASE 1
o ,
� 'PHAS
��►}0����� '� 3.03 STAGE 1-EROSION CONTROL PLAN Rev 1-Phase 2 U
LEE COUNTY PIN: 9660-15-0255-00,9650-97-7167-00,9660-07-7558-00, pdate 02/07123
9660-,8-6263-00,9660-17-4596-00,9650-96-8137-00, 4, 3.04 STAGE 1-EROSION CONTROL PLAN Rev 1-Phase 2 Update 02/07/23
9660-18-5664-00,9660-16 4708-00,9660-26-2753-00 q \�0�\ % ;z 3.05 STAGE 2-EROSION CONTROL PLAN Rev 1-Phase 2 Update 02/07/23
OVERALL SITE AREA: 209.26 ACRESr? Go �,•*%-O.4$444/' 1,1 3.06 STAGE 2-EROSION CONTROL PLAN Rev 1-Phase 2 Update 02/07/23
PROPOSED USE: SINGLE FAMILY AND TOWNHOMES S"� i' 9�� OW "
® ,'Vk ®..%% �r�trr 4.01 EROSION CONTROL DETAILS AND NOTES Rev 1-Phase 2 Update 02/07/23
NCDEQ APPROVAL DATE JUNE 24,2020 Ace;y",7"� '7'r ''�j 4.02 EROSION CONTROL DETAILS AND NOTES Rev 1-Phase 2 Update 02/07/23
PROJECT ID:LEE-2020-036 +p�\GO ,�, 0 / W I??,>j•�� j. O 4.03 EROSION CONTROL DETAILS AND NOTES Rev 1-Phase 2 Update 02/07/23
PHASE 1 DISTURBED ACREAGE 78.0 ACRES to. �0 ► r;/� 4.04 NCG-01 DETAILS AND NOTES Rev 1-Phase 2 Update 02/07/23
I—_�s� __
NCDEQ APPROVAL DATE APRIL 30,2021 �1= ` _ /
PROJECT ID:LEE-2021-025 hL
��, % =�!�� a J
PHASE2DISTURBEDACREAGE 30.OACRES ./1""" �� ��„Ilk!, -3
ow rim I0Okooa`d�A �k
• eff7•704
Ova 1-iipio.A. /
wai PHASE �,,
Jl iO15/7
06 s 17i" / ,
ab
ilk V4
����8 GRAPHIC SCALE
�V' MO500 1000
/, A
— �� -
1111 -1
� 1 Inch=500 "".
APPROXIMATE ENTRANCE LOCATION
N35°25'16.60"(35.4213)
W79°07'36.67"(79.1270)
FOR EROSION CONTROL
APPROVAL ONLY NOTE-FOR ANY PERFORMANCE RESERVATIONS REGARDING THE SEDIMENT CONTROL PLAN(PERFORMANCE
BASED)OR CRITICAL AREAS,A FIELD REVISION OR A CUSTOM PLAN MAY BE REQUIRED
PLANS PREPARED FOR:
N OWNER DEVELOPER PROJECT MANAGER ENGINEER FUws exrexouxom Eo E soo lob No 22-018
I�' D•R llotw ll ■ SFTEN,LLC D.R.HORTON •'s- r ' ,4,:: Dare: FEB.7th,2023
LAND DESIGN AND PLANNING,LLC JM Smith Engineering,PLLC ;04 ryt,
a Delaware limited liability company •9 Drawn ay JKV
ATTN:Tracey Davis Jason Via ATTN.Jason M.Smith,PE ;'. 1.
ATTN.Robed Stuart-Authorized Signatory Division NPDES Technical Compliance Administrator 534 Eagle Drive PO Box 331 .+ 034007p., t. ? Checked By 1M5
�1 ;yly,�,p,(A 2000 Aerial Center Parkway,Suite 110A 7208 Fats of Neuse Rd.Suite 201Rale Holly Hill,FL 32117 Cornelia,GA 30531 O!! ;
C�CI?hC�"_"" Mornsville,NC 9:(i19,49C-2183615 y 0:70684-2331 •9 � w: > SHEET NUMBER
��/ '� s 0:(919)460-2999 M:(919)497-2163 M:678595fi945 jmsmith@jmsmithengineedng.cam 's� 1-N ti:'
restuart@drhorton.com tmdavisl@drhorton.com via.jason@outlook.com MARK,,,.•"
KNOW WHAT'S BELOW. AVMITH
EaaNEER°rrxv ,Ex, „
•01
CALL BEFORE YOU DIG.