Loading...
HomeMy WebLinkAbout20230792 Ver 1_401 impact to below pond receivedROY COOPER Govemor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality July 31, 2023 DWR # 20230792 Catawba County Eric Dunn 8500 Sylvan Dr Terrell, NC 28182 Delivered via email to: edunn5000@email.com Subject: APPROVAL of CATAWBA RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS; 8500 Sylvan Dr Lake Norman Mr. Dunn, You have our approval for the impacts listed below for the purpc May 23, 2023 received by the Division of Water Resources (Divis covered by the Catawba Buffer Rules and the conditions listed bi not relieve the permittee of the responsibility to obtain all other approvals before proceeding with the project, including those re and Erosion Control, Non -Discharge, Water Supply Watershed, a The following impacts are hereby approved, provided that all of t the conditions of the Catawba Riparian Buffer Rules are met. No incidental impacts. [15A NCAC 02B .0611(b)(2)] described in your application dated, ) June 7, 2023. These impacts are N. This Buffer Authorization does auired Federal, State, or Local red by, but not limited to, Sediment Stormwater regulations. Conditions listed below, and all of ier impacts are approved, including Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers —Zone 1 300 (square feet) 0 (square feet) Buffers — Zone 2 0 (square feet) 0 (square feet) This approval is for the purpose and design described in your apf lication. The plans and specifications for this project are incorporated by reference as part of this Autt orization Certificate. If you change your project, you must notify the Division and you may be requir d to submit a new application package. If the property is sold, the new owner must be given a opy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC B .0611(b)(2)] If you are unable to comply with any of the conditions below, yo i must notify the Mooresville Regional Office within 24 hours (or the next business day if a weekend or oliday) from the time the permittee becomes aware of the circumstances. North Cazolim Deparimeot of Eocitonm ml Q Moor ,iOe Regional Office 1601 Fast Crnter 704.663.1699 I Dn'isioo of Wnter Rewwces e_ Suite 301 1 Mooresville. NC 2311 � Lake (At Full Pond/ Normal Water Level) () fig Full Pond/ Normal Water Level 0 Shoreline © c> C:�)� Plan View Full etlatlontl ckaMe `M rcceiury E Plan View Lake jftuxx /� © OO J 2loc� Existing Dock iwR.7R FORM: SSGP 09-2020 1 Page 4 of 5 Lake (At Full Pond/ Normal Water Side View Us v 0 0 Z v c 0 CL 2, q 4 obim III pmd- 3 ft. below full pond water level 4 ft. above full Existing bank 10 ft. bank height `QQ Q ft .,Side Vi �%A II_ --. water level 2 ft. additional clearing •x necessary PLE FORM: SSGP 09-2020 1 Page 5 of 5 7. Will work be conducted from land? ❑ From water?X 8. Total amount of impacts below the normal pool lake level / Normal Water Level impacts (including all excavation, backfill, rip lap, retaining walls, etc.) in square feet: in square feet: 9. Total amount of impacts above the normal pool lake leve� / Normal Water Level and 50 feet land -ward impacts (including back fill, excavation, rip rao, retaining walls, etc.) in square feet: impacts (temporary clearing, construction cotidor) in square feet: 10. Please describe the vegetation above the normal pool landward to be impacted (number of trees, for 11. Signature By signing below, I, as the project proponent, certify to • The project proponent hereby certifies that all informa accurate, and complete to the best of my knowledge • The project proponent hereby requests that the cen on this CWA 401 certification request within the al Owner/Agent's Signature' [15A-NCAC 02H_0502 M] 'Agent's signature is valid only if an authorization letter 12. Please approximately sketch the following information i each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Fu c. Location of rip rap or fill to be placed below the Fu d. Location of any proposed structures such as buildi e. Location of any excavation or dredging below the elevation level/ Normal Water Level and 50 following: contained herein is true, belief authority review and take action de reasonable period of time Date the owner is provided this plan and provide dimensions for Pond/ Normal Water Level elevation Pond/ Normal Water Level elevation s, retaining walls, docks, etc. II Pond/ Normal Water Level FORM: SSGP 09-2020 1 Page 3 of 5