HomeMy WebLinkAbout20230825024252_001ROY COOPER Govemor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality July 31, 2023 DWR # 20230749 Lincoln County Brandon O'Brien 7317 Webbs Chapel Cove Ct Denver, NC 28037 Delivered via email to: biobrien@colonialmaterias.com Subject: APPROVAL of CATAWBA RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS; 7317 Webbs Chapel Cove Ct, Lake Norman Mr. O'Brien, You have our approval for the impacts listed below for the purpo a described in your application dated May 26, 2023, received by the Division of Water Resources (Divisi n) May 26, 2023. These impacts are covered by the Catawba Buffer Rules and the conditions listed below. This Buffer Authorization does not relieve the permittee of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to, Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, arid/or Stormwater regulations. The following impacts are hereby approved, provided that all of t e Conditions listed below, and all of the conditions of the Catawba Riparian Buffer Rules are met. No ther impacts are approved, including incidental impacts. [15A NCAC 02B .0611(b)(2)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers —Zone 1 262 (square feet) 0 (square feet) Buffers — Zone 2 0 (square feet) 0 (square feet) This approval is for the purpose and design described in your ap ication. The plans and specifications for this project are incorporated by reference as part of this Auth rization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)] If you are unable to comply with any of the conditions below, you must notify the Mooresville Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. North Car hm Depa=ent or Envimnmmml Q liry I Division or R'aler Resources D_E Q�� Maoresri e R eiowl Office 1601 East Curter enue, Suite 301 1Moomsille. AC 28115 704.663.1699 7. Will work be conducted from land? ❑ From water? 1 8. Total amount of impacts below the normal pool lake level / Normal Water Level impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward /P( manent imp(aac�ts excavation, rip rap, retaining walls, etc.) in square feet: impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): G a CL� -kC\ S"Ube 11. Signature By signing below, I, as the project proponent, certify to the following: The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Owne gent's Signature' ["uA NCAC 020 502i Date Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Page 3 of 5 �0 lake (At Full Pond/ Normal Water Level)O to �— s Zr� E QF �>e)0v O t Z to C Side ViewCL 3 tL 3 ft. below full pond water level Existing bank o 4 ft. abate full bond water level Qo Quo Side ViEWC� F+ Re16LD P6nd 2 ft. additional clearing -if necesmry FORM: SSGP 09-2020 Page 5 of 5 Lake (At Full Pond/ Normal 4ter Level) �9 ull Pond/ Normal Water level( `- Shoreline i CS o� <z> C)© O 1 131 k� } �40lie fu I I Pond a .�et,0 3rwll-kccS � 6e c v m eck Plan View ��-G Tip Qa p I �.R� rock Lake Existing Dock Full Pond/ Normal Water Level'uh�- :h: )soh nf- 2ft,l�ft �!0!ow'+kre.ry 'irc:n+W Plan View FORM: SSGP 09-2020 Page 4 of 5