Loading...
HomeMy WebLinkAboutRE_ R-3300B Hampstead Bypass sediment losses (2)From:Westphal, Anneliese To:Sprinkle, Hannah H; Steffens, Thomas A CIV USARMY CESAW (USA); Lane, Stephen Cc:Giles, Jon W; Steenhuis (LJB, Inc.), Joanne H Subject:RE: R-3300B Hampstead Bypass sediment losses Date:Friday, September 8, 2023 3:02:47 PM Attachments:image001.pngphoto 1_Idalia_SR6 Pipe Outlet_after.jpgphoto 2_Idalia_SR6 sediment in pond after.jpgphoto 3_Culvert 13 inlet wing wall bank after.jpgphoto 4_Culvert 13 inlet area sediment in stream.jpg Hannah, Stephen, and Tom, Jon and I reviewed the subject project today, including the areas which had sediment losses from the Idalia rain event. Please see the attached photos. Area 1 Y30 STA 22+40 LT The sediment was removed at the outlet of the pipe and from the pond. See photos 1 and 2. Area 2 Culvert 13 inlet L1 STA 712+50 RT The sediment was removed form the “inside” of the wing wall and the area was stabilized with new coir fiber mat. There is still sand in the stream channel which the contractor still plans to remove. We will need to follow-up on that removal. See photos 3 and 4. Also, at our “ride through” meeting next week, we would like to discuss some scour that was noted on the inlet side of the channel (on the other side from where the sediment had accumulated). Thank you, Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 From: Westphal, Anneliese Sent: Friday, September 1, 2023 2:11 PM To: Sprinkle, Hannah H <hannah.sprinkle@deq.nc.gov>; Steffens, Thomas A CIV USARMY CESAW (USA) <Thomas.A.Steffens@usace.army.mil>; Lane, Stephen <stephen.lane@deq.nc.gov> Cc: Giles, Jon W <jwgiles1@ncdot.gov>; Steenhuis (LJB, Inc.), Joanne H <ext-jhsteenhuis@ncdot.gov> Subject: R-3300B Hampstead Bypass sediment losses Hannah, Stephen, and Tom, Ben Meyer has reported the following losses at 2 areas on the subject project from the Idalia rain event. Please see the attached photos. He reported that the rain gauge at the office was overtopped (>5”) and from the MPE website the project received over 5” of rain in 24 hours. Area 1 Y30 STA 22+40 LT less than 2cy of material from 36” crossline pipe. The pond is at the corner of SR6 and Y30 (NC210). The sediment deposited in the pond is from the outlet of the pipe (photos 1 and 2). Area 2 Culvert 13 inlet L1 STA 712+50 RT approximately 1cy of material (photos 3,4, and 5) We will update you if there are other areas reported. Thank you, Anneliese Anneliese Westphal Environmental Senior SpecialistDivision 3NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile910 675 0143 faxawestphal@ncdot.gov 5501 Barbados BlvdCastle Hayne, NC 28429-5647 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.