HomeMy WebLinkAboutWQ0024756_Compliance Evaluation Inspection_20230908DocuSign Envelope ID: 009E3475-06B1-4EBF-A56F-3E92CBDC288B
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
Fred M Bunn
Fmb at the Grove LLC
2231 NW Nash St
Ste D
Wilson, NC 27896-1783
NORTH CAROLINA
Environmental Quality
September 08, 2023
SUBJECT: Compliance Inspection Report
The Grove WWTP
Non -discharge Permit No. WQ0024756
Carteret County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the The Grove WWTP on
8/24/2023. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in Non -discharge Permit No. WQ0024756. The findings and
comments noted during this inspection are provided in the enclosed copy of the inspection report
entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Geoff Kegley with the Water
Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at
geoff.kegley@deq.nc.gov.
ATTACHMENTS
Cc: DWR files — Laserfiche
Don O'Mara - ORC
Sincerely,
EDocuSigned by:
ev�((a Sa 6"
E3ABA14AC7DC434—
Morelia Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
D North Carolina Department of Environmental quality I Division of Water Resources
,./ Wiimington Regional Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 26405
910.796,7215
DocuSign Envelope ID: 009E3475-06B1-4EBF-A56F-3E92CBDC288B
Compliance Inspection Report
Permit: WQ0024756 Effective: 02/15/22 Expiration: 06/30/25 Owner : Fmb at the Grove LLC
SOC: Effective: Expiration: Facility: The Grove WWTP
County: Carteret 104 W Bogue Blvd
Region: Wilmington
Atlantic Beach NC 28512
Contact Person: Fred M Bunn Title: Manager Phone: 252-399-1617
Directions to Facility:
System Classifications: SI, WW2,
Primary ORC: Donald P Omara Certification: 7904 Phone: 252-247-9167
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
WQ0032160 Fmb at the Grove LLC - The Grove Sewer System
Inspection Date: 08/24/2023 Entry Time 12:OOPM Exit Time: 01:OOPM
Primary Inspector: Geoff Kegley Docusi9ned by: Phone:
Secondary Inspector(s): �
C017E2515MB417-,
Reason for Inspection: Routine
Inspection Type: Compliance Evaluation
Permit Inspection Type: High Rate Infiltration
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Treatment Flow Measurement -Effluent
Treatment Flow Measurement -Influent
Miscellaneous Questions
Treatment Flow Measurement -Water
Treatment
Treatment Barscreen
Use Records
Treatment Filters
Record Keeping
Treatment Activated Sludge
Treatment Clarifiers
Treatment Disinfection
End Use -Infiltration
Treatment Flow Measurement
Treatment Return pumps
Standby Power
(See attachment summary)
Page 1 of 7
DocuSign Envelope ID: 009E3475-06B1-4EBF-A56F-3E92CBDC288B
Permit: WQ0024756 Owner - Facility: Fmb at the Grove LLC
Inspection Date: 08/24/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
A routine compliance inspection of The Grove WWTF was conducted on August 24, 2023. The purpose of the evaluation was
to verify that the facility is operating in compliance with the conditions and limitations specified in Permit W00024756. Don
O'Mara — ORC was present during the inspection.
The Grove WWTF is permitted for 120,000 GPD and consists of:
• manually cleaned bar screen
• 36,346 gallon flow equalization basin
• two 58,643 gallon aeration tanks
• two 13,100 gallon clarifiers
• 29,930 gallon sludge holding basin
• tertiary sand filter
• 3,360 clearwell
• 5,446 mudwell
• ultraviolet disinfection
• 11,440 gallon irrigation pump tank
• 0.56 acre (24,258 ft2) drip line dosed high -rate infiltration area
While this extended aeration plant is permitted for 120,000 gpd, current flows only average around 12,000 gpd in the summel
season and 7,000 gpd in the winter. Only one train is in operation due to the low flows.
The plant is surrounded by a public parking lot but is secured by a locked fence and signs are posted restricting public
access. The high -rate infiltration raised drip field is located across West Bogue Blvd.
MW #1 has been replaced. Locking caps need to be installed on all monitoring wells, especially since this area is open to
the public.
A review of the last two years of NDMR/NDAR reports shows two Nitrate exceedances in June and July 2022. GW-59
reports have been compliant.
There are some minor maintenance issues to be resolved, but overall the facility is deemed compliant with non -discharge
permit W00024756. Please review the comment sections of the inspection report for more details.
Page 2 of 7
DocuSign Envelope ID: 009E3475-06B1-4EBF-A56F-3E92CBDC288B
Permit: WQ0024756 Owner - Facility: Fmb at the Grove LLC
Inspection Date: 08/24/2023 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Type
Yes No NA NE
Reuse (Quality)
❑
Single Family Spray, LR
❑
Lagoon Spray, LR
❑
Activated Sludge Spray, LR
❑
Activated Sludge Drip, LR
❑
Activated Sludge Spray, HR
❑
Recycle/Reuse
❑
Single Family Drip
❑
Infiltration System
Treatment Yes No NA NE
Are Treatment facilities consistent with those outlined in the current permit? 0 ❑ ❑ ❑
Do all treatment units appear to be operational? (if no, note below.) 0 ❑ ❑ ❑
Comment: Due to low flows, only one train is in operation.
Treatment Flow Measurement -Influent
Yes No NA NE
Is flowmeter calibrated annually?
❑
❑ 0 ❑
Is flowmeter operating properly?
❑
❑ ❑
Does flowmeter monitor continuously?
❑
❑ ❑
Does flowmeter record flow?
❑
❑ ❑
Does flowmeter appear to monitor accurately?
❑
❑ ❑
Comment:
Treatment Flow Measurement -Water Use Records Yes No NA NE
Is water use metered? ❑ ❑ ❑
Are the daily average values properly calculated? ❑ ❑ 0 ❑
Comment:
Treatment Flow Measurement -Effluent Yes No NA NE
Is flowmeter calibrated annually? ❑ ❑ ❑
Is flowmeter operating properly? ❑ ❑ ❑
Does flowmeter monitor continuously? ❑ ❑ ❑
Does flowmeter record flow? ❑ ❑ ❑
Does flowmeter appear to monitor accurately? 0 ❑ ❑ ❑
Comment: The flowmeter was calibrated on 5/24/2023 by Delta Systems Environmental.
Standby Power Yes No NA NE
Is automatically activated standby power available? 0 ❑ ❑ ❑
Page 3 of 7
DocuSign Envelope ID: 009E3475-06B1-4EBF-A56F-3E92CBDC288B
Permit: WQ0024756 Owner - Facility: Fmb at the Grove LLC
Inspection Date: 08/24/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Is generator tested weekly by interrupting primary power source?
Is generator operable?
Does generator have adequate fuel?
Comment:
• ❑ ❑ ❑
• ❑ ❑ ❑
❑❑❑■
Treatment Barscreen Yes No NA NE
Is it free of excessive debris? 0 ❑ ❑ ❑
Is disposal of screenings in compliance? 0 ❑ ❑ ❑
Are the bars spaced properly? ❑ ❑ ❑
Is the unit in good condition? 0 ❑ ❑ ❑
Comment: Screenings from the manual bar screen are removed as needed. The high-level float in the EQ
tank, following the manual bar screen, was activated. The visual light was operable, but the
auto dialer did not work.
Treatment Activated Sludge Yes No NA NE
Is the aeration mechanism operable? 0 ❑ ❑ ❑
Is the aeration basin thoroughly mixed? ❑ ❑ ❑
Is the aeration equipment easily accessed? ❑ ❑ ❑
Is Dissolved Oxygen adequate? ❑ ❑ ❑
Are Settleometer results acceptable? ❑ ❑ ❑
Is activated sludge an acceptable color? 0 ❑ ❑ ❑
Comment: Aerators are controlled automatically by the DO levels. MicroC is added to the EQ basin.
Treatment Clarifiers
Yes No NA NE
Are the weirs level?
0
❑ ❑ ❑
Are the weirs free of solids and algae?
❑ ❑ ❑
Is the scum removal system operational?
❑
❑ ❑
Is the scum removal system accessible?
❑ ❑ ❑
Is the sludge blanket at an acceptable level?
❑
❑ ❑
Is the effluent from the clarifier free of excessive solids?
❑ ❑ ❑
Comment:
Treatment Return pumps Yes No NA NE
Are they in place? 0 ❑ ❑ ❑
Are they operational? 0 ❑ ❑ ❑
Comment:
Treatment Filters Yes No NA NE
Is the filter media present? 0 ❑ ❑ ❑
Is the filter media the correct size and type? ❑ ❑ ❑
Page 4 of 7
DocuSign Envelope ID: 009E3475-06B1-4EBF-A56F-3E92CBDC288B
Permit: WQ0024756 Owner - Facility: Fmb at the Grove LLC
Inspection Date: 08/24/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Is the air scour operational? 0 ❑ ❑ ❑
Is the scouring acceptable? 0 ❑ ❑ ❑
Is the clear well free of excessive solids? 0 ❑ ❑ ❑
Is the mud well free of excessive solids and filter media? 0 ❑ ❑ ❑
Does backwashing frequency appear adequate? 0 ❑ ❑ ❑
Comment: Backwashing is done manually as needed. The high-level float was activated in the mudwell
and the operator was notified of alarm on his cell phone.
Treatment Disinfection
Yes No NA NE
Is the system working?
❑ ❑ ❑
Do the fecal coliform results indicate proper disinfection?
❑ ❑ ❑
Is there adequate detention time (>=30 minutes)?
❑
❑ ❑
Is the system properly maintained?
❑ ❑ ❑
If gas, does the cylinder storage appear safe?
❑
❑ ❑
Is the fan in the chlorine feed room and storage area operable?
❑
❑ ❑
Is the chlorinator accessible?
❑
❑ ❑
If tablets, are tablets present?
❑
❑ ❑
Are the tablets the proper size and type?
❑
❑ ❑
Is contact chamber free of sludge, solids, and growth?
❑
❑ ❑
If UV, are extra UV bulbs available?
❑
❑ ❑
If UV, is the UV intensity adequate?
❑
❑ ❑
# Is it a dual feed system?
❑
❑ ❑
Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No. 7782-50-5)?
❑
❑ ❑
If yes, then is there a Risk Management Plan on site?
❑
❑ ❑
If yes, then what is the EPA twelve digit ID Number? (1000-
If yes, then when was the RMP last updated?
Comment:
Record Keeping
Yes No NA NE
Is a copy of current permit available?
0
❑ ❑ ❑
Are monitoring reports present: NDMR?
❑
❑ ❑
NDAR?
❑
❑ ❑
Are flow rates less than of permitted flow?
❑ ❑ ❑
Are flow rates less than of permitted flow?
❑ ❑ ❑
Are application rates adhered to?
❑ ❑ ❑
Is GW monitoring being conducted, if required (GW-59s submitted)?
❑ ❑ ❑
Are all samples analyzed for all required parameters?
❑ ❑ ❑
Are there any 2L GW quality violations?
❑
❑ ❑
Page 5 of 7
DocuSign Envelope ID: 009E3475-06B1-4EBF-A56F-3E92CBDC288B
Permit: WQ0024756 Owner - Facility: Fmb at the Grove LLC
Inspection Date: 08/24/2023 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Is GW-59A certification form completed for facility?
0
❑ ❑ ❑
Is effluent sampled for same parameters as GW?
0
❑ ❑ ❑
Do effluent concentrations exceed GW standards?
0
❑ ❑ ❑
Are annual soil reports available?
❑
❑ 0 ❑
# Are PAN records required?
❑
0 ❑ ❑
# Did last soil report indicate a need for lime?
❑
❑ 0 ❑
If so, has it been applied?
❑
❑ 0 ❑
Are operational logs present?
0
❑ ❑ ❑
Are lab sheets available for review?
❑
❑ ❑
Do lab sheets support data reported on NDMR?
❑
❑ ❑
Do lab sheets support data reported on GW-59s?
❑
❑ ❑
Are Operational and Maintenance records present?
0
❑ ❑ ❑
Were Operational and Maintenance records complete?
0
❑ ❑ ❑
Has permittee been free of public complaints in last 12 months?
0
❑ ❑ ❑
Is a copy of the SOC readily available?
❑
❑ 0 ❑
No treatment units bypassed since last inspection?
❑
0 ❑ ❑
Comment: Operational and maintenance log book was organized and complete
End Use -Infiltration
Yes No NA NE
# Is the application High Rate or Low Rate?
High
Rate
Are buffers maintained?
0
❑ ❑ ❑
Are any supply wells within the CB?
❑
0 ❑ ❑
Are any supply wells within 250' of the CB?
❑
❑ ❑
Is municipal water available in the area?
0
❑ ❑ ❑
Are GW monitoring wells required?
0
❑ ❑ ❑
Are GW monitoring wells located properly w/ respect to RB and CB?
0
❑ ❑ ❑
Are GW monitoring wells properly constructed, including screened interval?
0
❑ ❑ ❑
Is a usable green area maintained?
❑
❑ 0 ❑
Is the disposal site acceptable?
0
❑ ❑ ❑
Is the distribution equipment acceptable?
0
❑ ❑ ❑
Is the disposal site free of ponding?
0
❑ ❑ ❑
Is the disposal site free of breakout?
0
❑ ❑ ❑
Are the disposal sites free of solids, algae, etc.?
0
❑ ❑ ❑
Do the records show that the fields are properly maintained?
0
❑ ❑ ❑
Are the disposal sites free of vegetation?
❑
0 ❑ ❑
Do any surface water features appear to be adversely impacted by GW discharge?
❑
0 ❑ ❑
No chemicals or rototiller used to eliminate vegetation, solids, algae, etc.?
0
❑ ❑ ❑
Page 6 of 7
DocuSign Envelope ID: 009E3475-06B1-4EBF-A56F-3E92CBDC288B
Permit: WQ0024756 Owner - Facility: Fmb at the Grove LLC
Inspection Date: 08/24/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Comment: Operator can manually control dosing of the fields, but the PLC is in need of
repair/replacement. Vegetation will soon need to be removed from the infiltration field.
Page 7 of 7