HomeMy WebLinkAboutSite Inspection 9.8.23 Sugar Hill Road U-5818Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20181302
NCDOT - SR 1001 Improvements (U-5818)
McDowell
NCDOT - SR 1001 Improvements (U-5818)
NC DOT Division 13
9/8/2023
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Road
maintenance/repair/improveme
ntsRegion:Asheville
Longitude:-82° 02' 08''+35° 38' 47''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted on September 8, 2023 by Kevin Mitchell with the Asheville Regional Office. I spoke with
James Hutchins during the inspection.
Site is compliant with the 401 Water Quality Certification.
Ensure the project meets the NPDES cover requirements.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20181302
9/8/2023
Bryan, Roger D
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2