HomeMy WebLinkAboutSite Inspection 9.8.23 Br 84 on SR 1234 Stuckeyspage:1
Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
SW Plan Location:
Site Owner Name:
Latitude:
Project Name:
Project Num:
County:
Location:
TPB NCDOT - Replace Bridge 84 on SR 1234
McDowell(BR-0033)
TPB NCDOT - Replace Bridge 84 on SR 1234 (BR-0033)
NC DOT Division 13
9/8/2023
Routine
Site Inspection (DOT)
20210552 Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-82° 08' 37''+35° 38' 11''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Primary Inspector:Robert K Mitchell
Secondary Inspector(s):
Phone:
Facility Compliance Status:Compliant Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspecion was conducted on September 8, 2023 by Kevin Mitchell with the Asheville Regional Office.
Station -L- 12+00 - 13+00 LT - Recommend extending silt fence (between Y2 and RPC) to prevent sediment
loss.
Ensure project is meeting the NPDES cover requirements and record keeping is up to date.
20210552 Bryan, Roger D
page:2
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:9/8/2023 Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment: