Loading...
HomeMy WebLinkAboutSite Inspection 9.8.23 Br 84 on SR 1234 Stuckeyspage:1 Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: SW Plan Location: Site Owner Name: Latitude: Project Name: Project Num: County: Location: TPB NCDOT - Replace Bridge 84 on SR 1234 McDowell(BR-0033) TPB NCDOT - Replace Bridge 84 on SR 1234 (BR-0033) NC DOT Division 13 9/8/2023 Routine Site Inspection (DOT) 20210552 Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 08' 37''+35° 38' 11'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Primary Inspector:Robert K Mitchell Secondary Inspector(s): Phone: Facility Compliance Status:Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspecion was conducted on September 8, 2023 by Kevin Mitchell with the Asheville Regional Office. Station -L- 12+00 - 13+00 LT - Recommend extending silt fence (between Y2 and RPC) to prevent sediment loss. Ensure project is meeting the NPDES cover requirements and record keeping is up to date. 20210552 Bryan, Roger D page:2 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit:9/8/2023 Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: