Loading...
HomeMy WebLinkAbout090069_POA high freeboard_20230905PLAN'OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 1'' ff_ County: Facility Name: SQ i a�(1 M)l n t [l q(U•YSeVU _ -- - Certified Operator Name: 1rnadocoe operator# 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways: and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structural Structure 2" Structure 3 Structure 4 Structure 5 Structure 6 Lagoon NamelldentMer (ID): Spillway (Yes or No): Level (inches): SD 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. �• Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility. 3. Earliest possible date to begin land application of waste: 8 11 a3 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. -V i2A�11-e owner/Manager Phone: R 1 D - ? 76? -�91 ? Date:? PoA Cover Page 2121100 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier(ID): S uirell Hill Nursery 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 16.0 inches 19.0 inches 3.0 inches 83939 ft2 156966 gallons 180 days g. volume of waste produced according to structural design 18954 ft3 h. current herd # 2448 certified herd # 2448 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 3/17/23 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 18954 ft3 Oft3 13962 ft3 41035 gallons 1.11 Ibs/1000 gal. 219.8 Ibs. PAN PoA (30 Day) 2/21/00 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Squirell Hill Nursery 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line in = 219.8 lb PAN line in = lb PAN line m = lb PAN line in = lb PAN line m = lb PAN line in = lb PAN 219.8 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Iblwre) t.TOTAL PAN BALANCEFOR FIELD (lbs.) column rxs u. application w1ndow' 2769 1 bermuda rass 1.07 100.00 107.0 Mar -Oct 2769 2 bermuda rass 3.77 100.00 377.0 Mar -Oct 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 484.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 219.8 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 484.0 lb. PAN y. Overall PAN balance (w -x) = 264 lb. PAN Line ymust show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. Forpump $ haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balanc table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will pump immediately. Pc Dav)2/21/00