HomeMy WebLinkAbout090069_POA high freeboard_20230905PLAN'OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 1'' ff_ County:
Facility Name: SQ i a�(1 M)l n t [l q(U•YSeVU _ -- -
Certified Operator Name: 1rnadocoe operator#
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways: and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structural Structure 2" Structure 3 Structure 4 Structure 5 Structure 6
Lagoon NamelldentMer (ID):
Spillway (Yes or No):
Level (inches): SD
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
�• Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility.
3. Earliest possible date to begin land application of waste: 8 11 a3
1 hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
-V i2A�11-e
owner/Manager
Phone: R 1 D - ? 76? -�91 ?
Date:?
PoA Cover Page 2121100
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier(ID):
S uirell Hill Nursery
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
16.0 inches
19.0 inches
3.0 inches
83939 ft2
156966 gallons
180 days
g. volume of waste produced according to structural design 18954 ft3
h. current herd # 2448 certified herd # 2448
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 3/17/23
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
18954 ft3
Oft3
13962 ft3
41035 gallons
1.11 Ibs/1000 gal.
219.8 Ibs. PAN
PoA (30 Day) 2/21/00
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Squirell Hill Nursery
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n.lines 1+2+3+4+5+6=
line in =
219.8 lb PAN
line in =
lb PAN
line m =
lb PAN
line in =
lb PAN
line m =
lb PAN
line in =
lb PAN
219.8 lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract#
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(Iblwre)
t.TOTAL PAN
BALANCEFOR
FIELD (lbs.)
column rxs
u. application w1ndow'
2769
1
bermuda rass
1.07
100.00
107.0
Mar -Oct
2769
2
bermuda rass
3.77
100.00
377.0
Mar -Oct
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 484.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 219.8 lb. PAN
x. Crop's remaining PAN balance (line v from section 111) = 484.0 lb. PAN
y. Overall PAN balance (w -x) = 264 lb. PAN
Line ymust show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. Forpump $ haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balanc
table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
Will pump immediately.
Pc
Dav)2/21/00