Loading...
HomeMy WebLinkAbout820101_Routine Inspection_20230905Type of Visit: , ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: 3 Arrival Time: eparture Time: l) ounty:C /5 � Region: Farm Namea Owner Email: Owner Name: L LL Phone: Mailing Address: Physical Address: Facility Contact: /L.riY:?,LcS Title: Phone: Onsite Representative: l� Integrator: Certified Operator: Certification Number: & )� y Back-up Operator: Location of Farm: Latitude: Certification Number: Longitude: )C�e6 49k8 #4%%BA fiO4 bt xhSpp#4d# bk lot*#. *'**aP'4%%*a4%p aabkbnaR+r.>4w tt+ur a:rt3 bw mm #nal P44<t#6#M'&iK 4d@&%4%'.$ 4:b3$8S4 -p 4' f045 bR%%b§4#aa a%4RM:a:44�aaa A4 ae#, (n+i+&#'§ a#aaa va 44 94940a AM4+r%% x et5r�n# 'l'. FIFI itC 9'£ad4$.aa:AF eBna+#mPt.ky&64 Di4e j % `k�lat,»-'9 9#' �'a A "p xv�#nb xai #5A'#8& x+ y9 W4amk it&#+¢at+ff BYt n,u x.xe:r %44bRk itY%# W4x �aaaa�+exa�%m ��nma"��k��� ry �WF #a4A##a444 C14,WFW4AA pa'a m a % # a4pa 4 prba#s!0#peax#.aa#post e '@pees a parer#mesas ba%+ a vx em4a a % a ata. +aa 4a as S. 4% a p a(paa'ar. o*rewa4r%enm #r'Pxa # a %yyn*at e oulrw�a%�nxi"a.rr��ao�{{' %r gm.d#4reA9 �8ib #bk a x% &e ar arx Yr#Akb th"a ,p44 % st'.. t ' #a%xasa4+r#uar y-���cy p'#aa , ,%4 % aA###43+4f #$a#�axge¥%+dk�4a f 4'% aEa # 44 4i% #%%#AFAP4abi.4�b4ae 0p'WdS��64$BR'$a#b�arv'.e��n4 #i Wean to Finish Layer Dai Cow �# f Wean to Feeder Non Layer„ Dai Calf Feeder to Finish 1(00 1 e �re IMNIroN + a Farrow to Wean # 4 as 4 %% i U@ is Dai Heifer D Cow 1 Farrow to Feeder i, fiti�� fi.a(�� �t� ¢ NOW r Non-Dai Farrow to Finish �' La ersa 04 Beef Stocker Gilts Non -Layer 9`a Beef Feeder kar Boars Pullets °gg1rx Beef Brood Cow Ab`$IK $a A144 A4&+ate%% e A 1 Y%%S@# 4 t 49##R A446448#'d x�r>>a awa§a%A4s%4�%aas„a asp#a#ae %ta&be&#A* Turke s a%(4�aµAa+kxKwmn:ay#%4 as N8#&9#%.mmea &#9*Vio#a4. a§..,8x4 AA9A8na Wro4=&dk y4aaatk4b b%q ka4k kk9 pb#Y&' &V MY#.t'4k aye&oe #a4tl# A*a Aa aApp 44,400 + $4#bddb A$m 444 ffiS'k %%vk>$a Aa xaa gXa-0ba Baas 5e4 9##4b'4 A%aa a S ancxmsv.�am ank Au aaa aahaaa Afi e#do Turkey Poults o3eX }}«s t#a mf x..44ia rasa iffi#a�FtW axffia#&#A;y y& rep 34 +P. , 'M' %� ,str xa%.,; 4 s,K n.sn4a # arnxea.A >4r w •.. =9#A'&##+wkrs ua g Other ffiA4 5*%are#'#6mb %aut"�Coat gb@#'*40 ' : # Ix%1 4 *u" °taa**14a#p.SsSxg 3' %a••n4••.pmaa4Aao-euse p34 Y.A +amp sax #.. > .^ -. .. .... f fi# ..# Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ZrNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes E�IQo ❑ NA ❑ NE ❑ Yes &No ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes <En -No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: L a Spillway?: / Designed Freeboard (in): G 4F Zp Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Q'No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ..❑'No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? „Er'7es ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes .E5110 ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ No ❑ NA ❑ NE 'Eayes maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes . no ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Ef'&o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): Ooa4-eeC GJf/�li/i GL$ :56-6 13. Soil Type(s): 6V Grd""�i R� --c 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E-Ro ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 2No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �❑TNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes ONo ❑ NA ❑ NE ❑ Yes L3—Tgo ❑ NA ❑ NE ❑ Yes ®"No ❑ Yes ,ENo [:]Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes E]-No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ,FrNo 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 0N0 ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE [:]Weather Code ❑ Sludge Survey ❑NA ❑NE ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ETNo 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes Io the appropriate box(es) below. ❑ Failure to complete annual sludge survey Failure to develop a POA for sludge levels ❑ NA ❑ NE ❑ NA ❑ NE ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance:����� 26. Did the facility fail to provide documentation of an actively certified operator in charge? [—]Yes L�'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes L2-No ❑ NA ❑ NE ❑ Yes J2'No ❑ NA ❑ NE ❑ Yes JQiVNo ❑ NA ❑ NE [—]Yes LNo ❑ NA ❑ NE ❑ Yes _❑'l o ❑ NA ❑ NE ❑ Yes ❑'No ❑ NA ❑ NE ❑ Yes ❑15;o, ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE Pv cyan -lzr) Reviewer/Inspector Name: Reviewer/Inspector Signature: Phone: r Date: Page 3 of 3 511212020 FACILITY#: vl)-✓01 FARM NAME: Ave-- / LAGOON DUE EVERY 5 YEARS EXPERIATION DATE CURRENT NUMBER OF OIC CARD YES OR NO PERMIT pne) NUMBER OF ANIMALS WASTE UTILIZATION PLAN (WUP) (#20) SOILTYPES CROP TYPES ODOR CONTROL CHECK LIST YES OR NO Irrigation Plan Maps YES OR NO WASTE REPORT (#21) -GOOD FOR 60DAYS BEFORE OR AFTER DATE .Y"/;-? NITROGEN LEVEL, � `' 3 DATE NITROGEN LEVEL DATE S L/�'� NITROGEN LEVEL �G t%o22 a 0 22 ?/o - EVERY 3 YEARS: - P-1 (NO MORE THEN 400) - PH (Note l(4 or Ies ) - Cu/ZN (NO MORE THEN 8000) (IF PEANUTS NO MORE THEN 300) SOIL REPORT p21) DATE 1-,/2C/x/ Not over PAN CROP TYPES FLOW RATES_ Not over PAN CROP TYPES FLOW Not over PAN CROP TYPES IRR2 (#21) NITROGEN (N) NITROGEN (N) FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION Inzal EACH REEL SHOULD BE CALIBR TE9 EVERY OTHER YEAR DATE OF CALIBRATION /;X-G Y7� FLOW RATES RAIN FALL l+) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED PDA NEEDED. _3 ]9PDGEIxs�axsl -DUE EVE YYEAR:DAT l 0:SY% P: % RATIO OF SLUDGE 9� v O: —P. % RATIO OF SLUDGE Y `J O: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE OTHER FORMS (n22 AND 421) RAIN BREAKER FORM CROP YEILDS MORTALITY_ *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED BINS LAGOON GARBAGE Bermuda grass: Opens March 1st -Ends September 30th Small Grain Over seed: Opens October 1st -Ends March 31st Corn: Opens February 15* - Ends June 30t Cotton: Opens March 15t - Ends August 1st Rye: Opens September 1st -Ends March 31st Oats: Opens September 1st- Ends April 15t Wheat: Opens September 1st -Ends April 30t Soybeans: Opens April 1st -Ends September 15t . Fescue: Opens August 1st- Ends July 31st Sorghum Hay: Opens March 15t - Ends August 31 st