HomeMy WebLinkAbout090102_POA high freeboard_20230901V aQ
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: q -
Facility
Certified Operator Name:
County: 9Qden
Operator 4
1. Current liquid level(s) in inches Las measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/identifier (ID): i
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
V Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range. "
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section 111 tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of ActionLa�ld to the Best of my knowledge and abalibL h information is accurate and correct.
'hone:
910-87q- 6200
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Neill Jackson (9-102)
line m = 5.0
lb PAN
2.
Structure ID:
line in =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 5.0lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
000lnn nn MnT 1 1eT Oct no Tn 11NM1r•u DAM CAMMnT RF ADDI IPn niIRIMr THIS sn nAY PFRIOn_
o. tract#
p. field#
q. crop
r. acres
s. remaining IRR-2
PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u.applicationwindow'
903
5368
bermuda
10.50
100.00
1050.0
3/1-9/30
" uestimate on pan
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1050.0 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 5.0 lb. PAN
x. CroWs remaining PAN balance (line v from section 111) = 1050.0 Ib. PAN
y. Overall PAN balance (w - x) = -1045 lb. PAN
NARRATIVE:
Will begin pumping as soon as field conditions permit.
PoA (30 Day) 2/21/00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/ldenti ier (ID):
Neill Jackson 9-102
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during drawdown period
f. temporary storage period according to structural design
17.0 inches
19.0 inches
2.0 inches
55517 fe
69211 gallons
180 days
g. volume of waste produced according to structural design 43255 ft3
h. current herd # 3804 certified herd # 3804
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 5/12/23
m. ((lines e + ky1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
43255 ft3
Oft3
34653 ft3
97125 gallons
0.03 Ibs/1000 gal.
5.0 Ibs. PAN
PoA (30 Day) 2/21100