HomeMy WebLinkAbout820096_POA high freeboard_20230901PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-96 County: Sampson Facility Name: Mike Matthis Farm Certified Operator Name: Mike Matthis Operator Number: 20862 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 N 13 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates for depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/1 /23 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Mike Matthis Phone: 9109909610 cility Owner/ onager (print) Date: ��.1p Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon #1 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n.lines 1+2+3+4+5+6= line m = 860.9 lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN F061IMT61123N III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIOD_ DD NOT 1_IST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 3n DAY PERIOD. o. tract# p. field# q. Crop r. acres s. remairing IRR-21. PAN balance (Ib/acre) TOTAL PAN BALANCEFOR FIELD (Ibs.) column rxs u. application window' 6242 p2 Bermuda 2.40 235.00 564.0 march-october 6242 pl Bermuda 2.11 215.21 454.1 march-0ctober 6242 p6 Bermuda 3.24 219.71 711.9 march-0ctober 6242 p9 Bermuda 1.05 186.42 195.7 march-october 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1925.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 860.9 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 1925.7 lb. PAN y. Overall PAN balance (w -x) = 4065 lb. PAN y must showas a deficit. If line y does not show as a deficit, list course of action here including pump and haul, )pulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new mation. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2121100 [able and recalculate the overall PAN balance. It animal waste Is to be hawed to another permitted tacill[y, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 13.0 inches 19.0 inches 6.0 inches 95400 ftz 356796 gallons 180 days g. volume of waste produced according to structural design 122939 ft3 h. current herd # 3050 certified herd # 3720 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/10/23 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 100797 ft3 Oft3 55650 ft3 195037 gallons 1.56 Ibs/1000 gal. [-I'll] W717oM19101 PoA (30 Day) 2/21/00