Loading...
HomeMy WebLinkAbout090042_POA high freeboard_20230906PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 09-042 County: Bladen Facility Name: Larson Jones Nursery Certified Operator Name: Larson Jones Operator Number: 16291 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: UN Spillway(Y or N): N Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Larson Jones Phone: 910-290-1049 Facility Owner/Manager (print) Larson Jones Date: 9/5/2023 Facility Owner/Manager (signature) 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Larson Jones Nursery 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ top of dike surface area according to design d. (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 18.0 inches 19.0 inches 1.0 inches 29700 ftZ 18513 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 26023 ft3 h. current herd # 3552 certified herd # 3552 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/25/2023 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 26023 ft3 j-- j ft3 17325 ft3 54041 gallons 1.52 Ibs/1000 gal. 110 Ibs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: LJN line m = 110.1 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN in. lines 1+2+3+4+5+6= 110.1lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW nnWN �,..,. v Iw I ua i o. tract # p. field # rir-Lus I u WHICH PAN q. crop CANNOT BE APPLIED DURING THIS 30 r. acres s. remaining IRR t. TOTAL PAN 2 PAN balance BALANCE FOR (Ib/acre) FIELD (Ibs.) DAY PERIOD. u. application window' LJN LJN LJN LJN LJN LJN LJN LJN A B C D E F G H BP BP BP BP BP BP BP BP 0.92 0.88 0.82 0.85 0.67 0.67 0.67 1.04 45.14 49.58 40.43 44.98 57.50 27.85 207.66 208.88 41.5 43.6 33.2 38.2 38.5 18.7 139.1 217.2 3/1-9/30 3/1-9130 311-9130 3/1-9J30 3/1-9/30 3/1-9/30 3/1-9130 3/1-9/30 v. Total PAN available for all fields (sum of column t) == �7n 1 it, I V . I-M%A 1-11 r J V0A L)Vhf<ALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) _ x. Crop°s remaining PAN balance (line v from section 111) _ y. Overall PAN balance (w - x) = 110.1 lb. PAN 570.1 lb. PAN -459. 67732 lb. PAN Line y must show as a deficit_ If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Called in to DWR on 9/1/23. Will pump as weather and field conditions permit.