HomeMy WebLinkAbout090057_POA high freeboard_20230905LAN OF ACTION (OOA) FOR HIGH FREEBOARD AT ANIMAL FACUTIES
Facility Number ? 7 Gotantyi'f'y�i
Facility
Certified Operator Name:
Operator #
Current liquid levels) in inches as measured from 'the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure-2 Structure 3 Structure 4 Structure 5 Structure a
Lagoon Name/identifier (ID):
Spillway (Yes or No):
Level (inches):
2. Check all applicable Items
1,Jquid level is within the designed structural freeboard elevations of one or more structures, Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges,
V' Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day .
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste Is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality Prior to transfer of waste
to a site not covered in the facility's ceftified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
t hereby certify.that i have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my Knowledge and ability, the information Is accurate and correct.
Phone: `�ll�! 'U `i•� ?'
Facility OwnerlManager (print)
Date:
Facility owner/INlanager (signature)
PoA Cover Page 2121100
If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Gay Hill
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m =
38.7 lb PAN
line m =
lb PAN
line m =
lb, PAN
line m =
lb PAN
line m =
line m =
lb PAN
Ib PAN
n. lines 1 +2+3+4+5+6= 38.7 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERinn nn MAT 11ST FIFI nS TA WNICH PAN CANNAT RP APPI IFn nIIRINr-0 TMLS 3n nAv DFRIAn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(Iblacre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibm)
column r x s
u. application window'
1819
1A
bermuda ress
2.40
100.00
240.0
3/1-9/30
1819
16
bermuda rass
2.60
100.00
260.0
311-9130
*** uestimates
on remainina
PAN balance**
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 500.0 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 38.7 lb. PAN
x. Crop's remaining PAN balance (line v from section 111) = 500.0 lb. PAN
y. Overall PAN balance (w -x) = -461 lb. PAN
begin pumping as soon as field conditions permit.
PoA (30 Day) 2/21 /00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelidentifier(ID):
Cla Hill
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
16.0 inches
19.0 inches
3.0 inches
24700 fe
46189 gallons
180 days
g. volume of waste produced according to structural design 19048 ft3
h. current herd # 2600 certified herd # 2600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/27/23
m. ((lines e + kU1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
19048 ft3
0 ft3
14408 ft3
41708 gallons
0.44 Ibs/1000 gal.
38.7 Ibs. PAN
PoA (30 Day) 2/21/00