Loading...
HomeMy WebLinkAbout820242_POA for high freeboard_20230901PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - County: Facility Name:p �a a t-rm ��LT FIY.e P©i eds Certified Operator Name: J 18 Operator-.# 99 5 Z 41 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 "ockleber / F1v,, Lagoon Name/identifier (0):tD eef+elo\ �� � II 1 . too t y�A5 Spillway (Yes or No): �— AO I Level (inches): 08 — ►_ I_- 2. Check all applicable items Structure 4 Structure 5 Structure 6 Liquid level is within the -designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. -Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation if animais are to be -moved to aTiother permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility possible date to b -" P begin land application of waste: �'� C Y1�I�'X r'J ,. 3. Earliest �3 t her hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. 1R, ITA (print) (signature) Phone: 9 L (�- a8 5 66 2-7- Date: B - -3 �- ?-% ?- 3 PoA Cover Page 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldentifier (1©): 2. Current liquid volume in 25 yr.I24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 ciallons 12 e l j inches Ninches ?-- inches ZLk C� ft2 -� 2..1 'Q0 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 160 days g. volume of waste }produced according to structural design l 04e ft3 h. actual waste produced = � c xrrent herd # x luxe g 15 l fe certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 33 days = line f 4. Total PAN to be land applied during draw down period ft3 1 ft3 gallons 1. current waste analysis dated lbI1000 gal. m. (lines e + k) x tine I = 12 ib PAN 1000 ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE J. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL. FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelidentifier (113): � yjm�err 2. Current liquid volume in 25 yr.I24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.I24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 alg Ions 12 fe Is inches 1� inches inches Iq 9 60 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design _1 .04e ft3 h_ actual waste produced = current herd # x line g = l C) ft3 certified herd # L volume of gash water according to structural -design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days lire f 4. Total PAN to be land applied during draw down period 1. current waste analysis dated m. dines e + k) x line I 1000 ft3 14 000 .t3 3 1.1 7 gallons L68 lbJ1000 gal. 0an to Subm� � a NOSR 8(2mp(a S ' i nc)e + W4-)ex ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE d. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.I24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN .PERIOD 1. TOTAL RAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelidentifier (113): 5 ye ?o-i6A s 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) d. top of dike surface area according to design -(area at below structural freeboard elevation) e. line c x line d x 7.48 gallons 12 fe 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design i-1 inches I1 inches �- inches days g. volume of waste produced according to structural design i9108 ft3 Qurrent h_ actual waste produced = herd # x line g = t 1. � 5 � ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw dawn period 1. current waste analysis dated m. Hines e + k) x line 1 = 1000 Note;. 1�ton suom.l a llvc�5 a ft3 ft3 - 7G to gallons 1, Z ?_ l b11000 gal. _ a lb PAN - ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE d. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21I00 I - structure ID: line = -L rn 1b PAN 2. structure ID:Nc I6emlC 11, l line m = lb PAN 3- strut-tunelD:F1Ve line rn = lb PAN 4- structure ID; line m = lb PAN 5.. structure ID: line m = lb PAN 6. structure ID: line M = lb PAN n. linesi +2+3+4+5+6 283 PAN —1b Ill- TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PPRInn DAYDRAW DOWN o. tract# p- field # '3 q. crop an�, 0—=Art'Uf--5 r. acres OURING s. remaining IRR-2 PAN balance (lb/acre) --i3 THIS 30 DAY t. TOTAL PAN BALANCE FOR FIELD {ibs-) column r x s LLH0,2-- PEpj0D u. application windows 42) 0 2- 2,b 2C 2- 1'4 9 2141 r N 429,b 'State curre nt croo endina amlinaiinn ri:afm nr* n--T during 30 day drawn clown period , -- - --- - -j- 111111!d Ui*t%;;1 cur dvallaule receiving crops- v. Total PAN available for all fields (sum of column t) = 2298L-'3 Ib.PA,?.j 5 IV. FAGILITY!PoA OVERALL PAN BALANCE PoA (30 Day) x2vou w. Total PAN to be land applied dine n from section ll) = 2 -3 lb. PAN x. Crop's remaining PAN balance (line v from section lll) 2 ;96+ lb. PAN y. Overall PAN balance (w - x) - Z , .� u 1 lb. PAN Line y must show as a deficit. If line y does not show as a deficits list course of action here including pump and hauls depopulation, herd reductions etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to'the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility{ provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA J30 Day) 2121100