Loading...
HomeMy WebLinkAbout090040_POA high freeboard_20230905PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: nns� - '�(, County: B I124ea, Facility Name: �'i �-% NDQ �GtdlIn U[✓ Certified Operator Name: 1111l, A� � )DSI� i��IGDIiJs Operator# 1. Current liquid level(s) in inches as measured from current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/identifier (ID): q Spillway (Yes or No): Level (inches): I I-} 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site -locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality .prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: _ S(131 5 _ I hereby certify that I have reviewed the Information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. (print) (signature) Phone: q)D 1 1161q° Vi11. Date: Cover Page 2121100 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): A & H Hog Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design 14.0 inches 19.0 inches 5.0 inches 102856 ft2 320568 gallons 180 days 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/14/23 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Oft3 62270 ft3 228549 gallons 3.02 Ibs/1000 gal 1658.3 Ibs. PAN PoA (30 Day) 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: A & H Hog Farm line In = 1658.3 lb PAN 2. Structure ID: line In = lb PAN 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = lb PAN line m = Ib PAN line m = lb PAN line In = lb PAN 1658.3 It, PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN .u.nu MAu ^A\IAV1T 00 AOOI mn niim Mrs Tum Rn nAV Ppoin I o.tract # p.field # q.crop r.acres s.remaininglRR-2t. PAN balance (Ibfwre) TOTAL PAN BALANCEFOR FIELD (Ibs.) column r x s u. applicabon window' 3235 1 bermuda 7.00 100.00 700.0 Mar -Se t 3235 2S bermuda 12.00 150.00 1800.0 Mar -Se t *** uestimate on PAN left***** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2500.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1658.3 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 2500.0 lb. PAN y. Overall PAN balance (w - x) = -842 lb. PAN Line y must showas a deficit. If line y does not showas a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. Forpump &haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN baler table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. JARRATIVF- Will pump as soon as conditions allow. PoA (30 Day) 2/21/00