HomeMy WebLinkAbout20231216 Ver 1_Site Plan_20230907Lake
(At Full Pond/ Normaf Water Level)
Full Pond/
Normal Water Level
Ow
Shoreline
Please approximately sketch the following information on this plan (provide dimensions for each
item, such as 10 ft x 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSCP 10-2013
Page 3 of 3
14
it gg
3F{ �g{
I
k
k
/ ti car
�y��
4
YY
�
a
{ e
�
3 gV
a.
�Y ���1 �C 'ff �`�.rg�yl•
5 tell
W �i�u
W
5! •-f'��+��a4 !
� �1
i2W
�..\
/
jet IG,
`.'i 8 4, 4•
S z e X
i
38 t.;tf
4
f
_
�s at'as'Sc'E
b
j4+"—.�.'C"J._r _its.: srit'6
s ry
n � � /+uc•------x � r
X SJ
a
h
14
it gg
3F{ �g{
I
k
k
/ ti car
�y��
4
YY
�
a
{ e
�
3 gV
a.
�Y ���1 �C 'ff �`�.rg�yl•
5 tell
W �i�u
W
5! •-f'��+��a4 !
� �1
i2W
�..\
/
jet IG,
`.'i 8 4, 4•
S z e X
i
38 t.;tf
4
f
_
�s at'as'Sc'E
b
j4+"—.�.'C"J._r _its.: srit'6
s ry
n � � /+uc•------x � r
X SJ
a
h
N.,
E;
Ki
CA
4Pr%
■
■
sot
BANK HEIGHT
(ERODEDAREA)
so
a
E
F-
y
%(
I
RFiY' i r p.�
I S,
3:
r �1
Ili �
•
i �
1
—
r
6
1a Y5
-. •r, ^�.0 MP'YWIibiC',agyHnfi4W ^f'�I �" e
-
)1
i
a
�
1
F
1
un
urn `
N