Loading...
HomeMy WebLinkAbout20231215 Ver 1_Site Plan_20230907Shoreline Layout Diagram Lake Shoreline Stabilization Application Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. On the following pages are examples to follow and space to sketch the proposed plan. Proposed (Plan View) Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level Shoreline Lake (At Full Pond/ Normal Water Level) Existing Dock 30ftx7ft 3 ftx 150ft Below full pond/ N W L Full Pond/ Normal Water Level Moline 17.I IT, Ri pra p Above full pond/ N W r 2ft. x150 ft. additional clearing * if necessary E' AMPLE Plan View Proposed (Side View) La ke (At Full Pond/ Normal Water Level) 2 ft. additional clearing 3 ft. uelow full pond water level 4 ft. above full pond water level *if necessary Existing bank 10ft. bank height 11,�"0401 V- . . �, wk- `� Shoreline Layout Diagram Lake Shoreline Stabilization Application Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. On the following pages are examples to follow and space to sketch the proposed plan. Proposed (Plan View) Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level Shoreline Lake (At Full Pond/ Normal Water Level) Existing Dock 30ftx7ft 3 ftx 150ft Below full pond/ N W L Full Pond/ Normal Water Level Moline 17.I IT, Ri pra p Above full pond/ N W r 2ft. x150 ft. additional clearing * if necessary E' AMPLE Plan View Proposed (Side View) La ke (At Full Pond/ Normal Water Level) 2 ft. additional clearing 3 ft. uelow full pond water level 4 ft. above full pond water level *if necessary Existing bank 10ft. bank height 11,�"0401 V- . . �, wk- `�