Loading...
HomeMy WebLinkAboutRE_ _External_ RE_ Maymead Blue Ridge Parkway Culvert MaintenanceCarpenter, Kristi From: Thomas, John T. <jthomas@GFNET.com> Sent: Friday, August 25, 2023 10:54 AM To: Wanucha, Dave; Fuemmeler, Amanda J CIV USARMY CESAW (USA) Cc: Archual, Adam J.; Tipton, Rick A.; kturner@maymead.com; Ken Lisk Subject: RE: [External] RE: Maymead Blue Ridge Parkway Culvert Maintenance CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Great! Thank you, Dave, for your quick response. John Thomas From: Wanucha, Dave <dave.wanucha@deq.nc.gov> Sent: Friday, August 25, 2023 10:29 AM To: Thomas, John T. <jthomas@GFNET.com>; Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil> Cc: Archual, Adam J. <aarchual@GFNET.com>; Tipton, Rick A. <rtipton@GFNET.com>; kturner@maymead.com; Ken Lisk <klisk@maymead.com> Subject: RE: [External] RE: Maymead Blue Ridge Parkway Culvert Maintenance [EXTERNAL EMAIL]: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi John, Yes, we received it. We have placed in on public notice for 30 days and will issue it shortly thereafter on or around September 18t" or 19tn Let me know if you need anything else. Dave W. Dave Wanucha Environmental Specialist 11 Transportation Permitting Branch for NCDOT Divisions 9 and 11 Division of Water Resources, Department of Environmental Quality Office/Cell: (336) 403-5655 Dave.Wanucha@deq.nc.gov 1 From: Thomas, John T. <jthomas@GFNET.com> Sent: Friday, August 25, 2023 10:21 AM To: Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil>; Wanucha, Dave <dave.wanucha@deg.nc.gov> Cc: Archual, Adam J. <aarchual@gfnet.com>; Tipton, Rick A. <rtipton@GFNET.com>; kturner@maymead.com; Ken Lisk <klisk@maymead.com> Subject: [External] RE: Maymead Blue Ridge Parkway Culvert Maintenance CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning Amanda and Dave, With reference to inline emails, I am just checking in to make sure you received the ePCN application for the South Section Maymead / Blue Ridge Parkway Culvert Maintenance project that was submitted on August 16t". I will be in the field next week and not easily available to my email. If you have any questions or comments next week, please phone and/or text me on my cell phone (number listed below). Thanks John Thomas Gannett Fleming Ithomas@gfnet.com 919 389-4391 From: Thomas, John T. Sent: Wednesday, August 16, 2023 2:25 PM To: Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: giohnston@maymead.com; Archual, Adam J. <aarchual@gfnet.com>; Tipton, Rick A. <rtipton@gfnet.com>; kturner@maymead.com Subject: FW: Maymead Blue Ridge Parkway Culvert Maintenance Good afternoon Amanda and Dave, hope things are continuing to go well for you. With reference to the inline email concerning the Blue Ridge Parkway South Section Sec. 404 and Sec. 401 permitting, I submitted the ePCN for the proposed project this morning. I am sending you this email as a "heads -up" that the ePCN has been submitted and to reach to you asking that you contact me if you have any questions or comments. The proposed work falls within the limits of what was requested for the North Section that was permitted last year. The South Section is 20 miles long with 14 culvert sites. The work involves repair of head walls, removal of sediment & debris, and two of the culverts are being lined. The culverts are not being upgraded or extended. The work will be done in the "dry" with temporary "pump around" dewatering. Thankyou! John Thomas Gannett Fleming ithomas@�fnet.com 919 389-4391 From: Thomas, John T. Sent: Monday, July 10, 2023 8:21 AM To: Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: 'Greg Johnston' <Giohnston@maymead.com>; Archual, Adam J. <aarchual@gfnet.com>; Tipton, Rick A. <rtipton@gfnet.com>; kturner@maymead.com Subject: Maymead Blue Ridge Parkway Culvert Maintenance Good morning Amanda and Dave, hope things are going well for you and you and your family are enjoying your summer. This is just a quick update to let you know with reference to last years permit actions for the Maymead Company's Blue Ridge Parkway Pavement and Drainage Maintenance project (i.e., north section ) that we are completing field inspections for the south section of the project this month. Our plan is to submit an ePCN request for temporary jurisdictional impacts associated with the proposed culvert maintenance work in August, 2023. Please let me know if you have any have any questions or concerns associated with this project. Thank you, John Thomas Gannett Fleming ithomas@�fnet.com 919 389-4391 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.