HomeMy WebLinkAboutNCC222043_MODIFICATION Supporting Doc (LOTS 72-122)_20230906 ROY COOPER
Governor ` ` -
ELIZABETH S.BISER a
Secretory
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
August 30, 2023
LETTER OF APPROVAL
D.R. Horton, Inc.
Attn: Ms. Tracey Davis, Regional Assistant Stormwater Manager
2000 Aerial Center Parkway, Suite 110 A
Morrisville, NC 27560
RE: Project Name: Bayberry Park Phase 3 Acres Approved: 21.11
Project ID: Crave-2021-004
County: Craven
City/Township: New Bern
Address: Bayberry Park Drive
River Basin: Neuse
Date Received by LQS: August 30, 2023
Submitted By: D.R. Horton, Inc.
Plan Type: Revised (Lot Dev. Phase)
Dear Madam,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications.The Modifications Required for Approval are listed on the attached page.This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future,the new responsible party must obtain a new COC.
DE -4
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
��/� Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889
D.P.Imirt al E. +a.mr\ r 252.946.6481
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
Please be advised that a rule to protect and maintain existing buffers along watercourses in
the Neuse River Basin became effective on July 22, 1997. The Neuse River Riparian Area
Protection and Maintenance Rule (15A NCAC 2B.0714) applies to the 50-foot wide zone
directly adjacent to surface waters (intermittent streams, perennial streams, lakes, ponds,
and estuaries) in the Neuse River Basin. For more information about this riparian area rule,
please contact the Division of Water Resources Wetland/401 Unit at 919-807-6300,or DWR
in our regional office at 252-946-6481.
Sincerely,
h/ /7,14/if (i' Cf;\
Samir Dumpor, PE
Regional Engineer
Land Quality Section
cc w/o enc: Tracey Davis, D.R. Horton, Inc. (email)
WaRO Division of Water Resources (email)
PROJECT INFORMATION SHEET
APPROVAL DATE: August 30, 2023
RESPONSIBLE PARTY: D.R. Horton, Inc.
PROJECT NAME: Bayberry Park Phase 3
COUNTY: Craven NO.: Crave-2021-004
OFF-SITE BORROW
AND/OR DISPOSAL SITE: NO.:
START-UP DATE:
CONTRACTOR:
ON-SITE CONTACT:
ON-SITE PHONE NO.:
OFFICE PHONE NO.:
COMPLETE &RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: Bradley West
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
donald.west@deq.nc.gov