Loading...
HomeMy WebLinkAbout20210829 Ver 2_ePCN Application_20230828DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 6/30/2023 BIMS # Assigned 20210829 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Michael Meilinger:Michael.Meilinger@ncdenr.gov Information for Initial Review la. Name of project: COURTESY COPY The Vineyards 1a. Who is the Primary Contact?* Anthony W. Sydes 1b. Primary Contact Email: * leahquinn@sydescommunities.com Date Submitted 8/28/2023 Nearest Body of Water New River Basin White Oak Water Classification C;NSW Site Coordinates Latitude: 34.8071 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Onslow, Is this a NCDMS Project Yes No Longitude: -77.4349 Version#* 2 Reviewing Office` Wilmington Regional Office - (910) 796-7215 1c. Primary Contact Phone: * (910)455-6956 Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 401 Water Quality Certification - Express Riparian Buffer Authorization 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: A Sydes Construction, Inc. 2b. Deed book and page no.: IDS 4862, PG 208 2c. Contact Person: Anthony W. Sydes 2d.Address Street Address 100 Carolina Plantations Address Line 2 City State / Province / Region Jacksonville NC Postal / Zip Code Country 28546 United States Yes No Yes No 2e. Telephone Number: (910)455-6956 2g. Email Address:* leahquinn@sydescommunities.com 4. Agent/Consultant (if applicable) 4a. Name: Grace Ewoldt 4b. Business Name: Tidewater Associates, Inc. 4c.Address Street Address 306 New Bridge Street Address Line 2 City Jacksonville Postal / Zip Code 28540 4d. Telephone Number: (910)455-2414 4f. Email Address:* office@tidewaterenc.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) The Vineyards 1c. Nearest municipality / town: Jacksonville 2. Project Identification 2a. Property Identification Number: 060088 2c. Project Address Street Address Gum Branch Road Address Line 2 city Jacksonville Postal / Zip Code 28540 3. Surface Waters 3a. Name of the nearest body of water to proposed project: New River 3b. Water Resources Classification of nearest receiving water: C;NSW 3c. What river basin(s) is your project located in? White Oak 3d. Please provide the 12-digit HUC in which the project is located. 030203020202 4. Project Description and History 2f. Fax Number: State / Province / Region NC Country United States 4e. Fax Number: 2b. Property size: 386.2 State / Province / Region NC Country United States of America 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * Project was previously wooded and used for timberland. Now the site is under development for residential subdivisions. Vicinity around the site includes additional timberland, along with residential and commercial areas. O 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). SAW-2012-01392 4f. List the total estimated acreage of all existing wetlands on the property: 95.3 4g. List the total estimated linear feet of all existing streams on the property: 15100 4h. Explain the purpose of the proposed project: * The purpose is to construct two temporary utility crossings through the wetlands, and to remove the previous permanent impact called out in the last plan approval. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * Overall project is for residential subdivisions consisting of slab on grade construction, with typical grading and road construction equipment, to include all typical services (water, sewer, electrical, etc.) 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2012-01392 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: US Army Colors of Engineers 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR 11/4/22 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts a 2a1 Reason (?) Utility Crossing 2b. Impact type* (?) T 2c. Type of W. Unknown 2d. W. name Unknown 2e. Forested* Yes 2f. Type of Jurisdicition * ?) Both 29• Impact area * 0.030 (acres) F_7](acres) Utility Crossing T Unknown Unknown �s_Joth 0.020 2g. Total Temporary Wetland Impact 0.050 2g. Total Wetland Impact 0.050 2i. Comments: 2g. Total Permanent Wetland Impact 0.000 3. Stream Impacts F I 3a. Reason for impact () 3b.lmpact type" 3c. Type of impact" 3d. S. name" 3e. Stream Type" ?) 3f. Type of Jurisdiction* 3g. S. width 3h. Impact length' S1 __J Utility Crossing Temporary Culvert Unknown ]ffttE]Both Average (feet) 70 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 0 3i. Total stream and ditch impacts: 70 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 70 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Permanent Impacts were removed from the project and instead replace with temporary utility crossings. Overall measures to reduce impacts were still taken. Proposed crossings occur at specific areas to minimize total area impacted. Crossing #1 occurs at an existing road crossing. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Limit disturbance areas to minimal needed for equipment and installation. Work to be done in periods of dry weather. Work to be completed in minimal time necessary. Silt Fence and other erosion control measures are proposed to minimize sedimentation runoff. Additional notes are included on the plans 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The project contains only temporary impacts. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: There are no buffers in the area. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state Stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. City of Jacksonville Comments: Q V G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. Project shown is designed based off of full buildout. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?" Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. A pump station is installed and ties into The City of Jacksonville Sewage Treatment System. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?" Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?" Yes No 5d. Is another Federal agency involved?" Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Critical Habitat Map Viewer from ArcGIS 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA South Atlantic Fishery management Council Essential Fish Habitat Viewer 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC Department of Natural & Cultural Resources GIS 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Map Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Vineyards-prefile.pdf 612.91 KB Wetland Impact Maps - The Vineyards.pdf 548.53KB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Grace Ewoldt Signature Date 8/28/2023