HomeMy WebLinkAbout20180063 Ver 1_French_Broad_05_RES_Carolina_Bison_MY4_Monitoring_Report_20230906ID#* 20180063 Version* 1
Select Reviewer:
Maria Polizzi
Initial Review Completed Date 09/06/2023
Mitigation Project Submittal - 9/6/2023
Is this a Prospectus, Technical Proposal or a New Site?* Yes No
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name: * Email Address:
Daniel Dixon ddixon@res.us
Project Information
ID#: * 20180063 Version:* 1
Existing ID# Existing Version
Project Type: DMS Mitigation Bank
Project Name: Carolina Bison Mitigation Site
County: Buncombe
Document Information
Mitigation Document Type:*
Mitigation Monitoring Report
File Upload: French Broad 05 RES Carolina Bison MY4 Mo... 17.97MB
Please upload only one PDF of the complete file that needs to be submitted...
Signature
Print Name:* Daniel Dixon
Signature: *
3600 Glenwood Avenue. Suite ioo
res
Raleigh, NC 2'7612
Corporate Headquarters
6575 West Loop South, Suite 300
Bellaire, TX 77401
Main: 713.520.5400
September 5, 2023
Mr. Steve Kichefski
U.S. Army Corps of Engineers
Regulatory Division
151 Patton Ave. Room 208
Asheville, NC 28801-5006
RE: Carolina Bison Year 4 Monitoring Report (SAW-2016-02357)
Dear Mr. Kichefski,
Please find attached the Carolina Bison Year 4 Monitoring Report.
No monitoring of vegetation plots or cross sections occurred in the current monitoring year
however the site was visually monitored three times this year. In Monitoring Year 3, all nine
vegetation plots met the 320 stems per acre success criteria. The average planted stems per acre
across the plots was 710 and the average planted stem height was 4.3 feet. Eleven bankfull events
were recorded on the stage recorders with all three gages documenting at least one out of bank
event. This year marks the fourth year in which, there have been at least one bankfull event in four
separate years of monitoring. Visual assessment of the site shows no vegetation or stream
problems. The channel is transporting sediment as designed after in stream vegetation treatments
and will continue to be monitored for aggradation and degradation. Comments from the
Monitoring Year Three Credit Release Letter are located and italicized below with answers detailed
in bold.
RES is requesting a 5% stream credit release (229.050 SMUs and 4.700 WQ SMUs) for the
completion of the Year 4 Monitoring Report and an additional 10% stream credit release (458.100
SMUs and 9.400 WQ SMUs) for the bankfull event performance standard being met. Please see
enclosed the credit release timeline and an updated credit ledger.
Thank you,
Daniel Dixon I Ecologist
res. us
The report noted continued sediment deposition within UT1 that has resulted in the need
for continual treatment of vegetation within this reach. As we are now moving into Monitoring
Year 4, we believe this should be the final year for any vegetation treatment. If channel formation
within this reach continues to be a persistent problem following this year, it may be necessary to
address this reach through the submittal of an adaptive management approach that could include
potential credit adjustments due to loss of channel jurisdiction. Please be sure to include a detailed
description of this area and representative photographs in the MY4 report.
RES believes this area to be returning to designed channel dimensions after the in -stream
vegetative treatments of August 2022. Pictures are included in Appendix B. RES will
submit an adaptive management plan if the cross -sectional dimensions do not show a
return closer to design standards in MY5.
2. We appreciate your continued efforts to maintain the easement and ensure that future
encroachments are avoided.
Thank you. RES will continue to maintain transparency in easement issues if they arise.
3. We are pleased to see that the monitoring of water quality parameters and
macroin vertebrates has demonstrated an uplift in function on the site, particularly with regard to
the improved bioclassification of the upstream location. Please include the dates that sampling
was conducted on Table 73 that shows the water quality monitoring parameters to aid in the
interpretation of this data.
Dates have been included in the seasonal columns to show when samples were taken.
Project Name:
Sponsor Name:
USACE Action ID:
NCDWQ Action ID:
Wilmington District Mitigation Bank Credit Release Schedule
Carolina Bison Stream Mitigation Project
EBX
SAW-2016-02357
County:
8-Digit HUC:
Year Project Instituted
Date Prepared:
Total Potential Credits
Non -Forested
Stream Credits
Forested Wetland Credits
Wetland Credits
Credit Classification
Warm
Cool
Cold
Riparian
Riparian
Non -Riparian
Coastal
Water
Water
Water
Riverine
Non-Riverine
Potential Credits from Mitigation Plan
4,675
Potential Credits from As -Built Survey
4,675
Buncombe
6010105
2019
9/5/2023
4675.000
Current and Future Credit Releases
Stream Credits
Forested Wetland Credits
Non -Forested Wetland
Credits
Projected
Actual Release
Credit Release Milestone
Scheduled
Releases
Warm
Water
Base
SMUs
WQ
SMUs
Scheduled
Releases
Riparian
Riverine
Riparian
Non-Riverine
Non -Riparian
Scheduled
Releases
Coastal
Release Date
Date
1 (Bank/Site Establishment)"
15%
687.150
15%
15%
10/21/2019
2 (Year O/As-Built)'
15%
687.150
15%
15%
8/15/2020
9/29/2020
3 (Year 1 Monitoring)
10%
458.100
37.600
10%
10%
3/15/2021
3/31/2021
4 (Year 2 Monitoring)
10%
458.100
9.400
10%
15%
3/15/2021
3/31/2022
5 (Year 3 Monitoring)
10%
458.100
9.400
15%
20%
3/31/2023
12/28/2022
6 (Year 4 Monitoring)
5%
229.050
4.700
5%
10%
12/1/2023
7 (Year 5 Monitoring)
10%
458.100
9.400
15%
15%
8 (Year 6 Monitoring)
5%
229.050
4.700
5%
NA
NA
9 (Year 7 Monitoring)
10%
458.100
9.400
10%
NA
NA
Stream Bankfull Standard
10%
458.1
9.4
NA
NA
NA
NA
NA
NA
12/1/2023
Total Credits Release to Date
1
12805.0001
Contingencies (if any): None
Signature of Wilmington District Official Approving Credit Release
1- The first credit release milestone is based on the potential credits stated in the approved mitigation plan.
2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria:
1) Execution of the MBI or UMBI by the Sponsor and the USACE;
2) Approval of the final Mitigation Plan;
3) Mitigation bank site must be secured;
4) Delivery of the financial assurances described in the Mitigation Plan;
5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE;
6) 404 permit verification for construction of the site, if required.
3 - The second credit release is based on the credit totals from the as -built survey, and may differ slightly from the credit totals stated in the mitigation plan.
4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met.
Date
Transaction Credits Released Credits Debited
Number To Bank From Bank
CAROLINA BISON STREAM CREDIT LEDGER (HUC 06010105)
Tuesday. August 8. 2023
Current Credits
Credit Balance Reserved Purchaser
Permit Number Date HUC
687.15
Credits Released: Task 1 10/21/19
687.15
Credits Released: Task 2 9/30/20
495.70
Credits Released: Task 3 3/31/21
467.50
Credits Released: Task 3/31/22
467.50
Credits Released: Task 5 12/28/22
Total 2.805.00 0.00 1 2.805.00 1 0.0
CAROLINA BISON
STREAM MITIGATION SITE
B UNCOMBE CO UNTY, NOR TH CAR OLINA
SAW-2016-02357
RES French Broad 05 Umbrella Mitigation Bank
YEAR 4 MONITORING REPORT
Provided by:
fires
Bank Sponsor: Environmental Banc and Exchange, LLC,
An entity of Resource Environmental Solutions
3600 Glenwood Ave, Suite 100
Raleigh, NC 27612
864-567-7761
September 2023
Table of Contents
1.0 Project Summary..................................................................................................................................... 2
1.1 Project Location and Description.............................................................................................. 2
1.2 Project Goals and Objectives.................................................................................................... 2
1.3 Project Success Criteria............................................................................................................. 3
Stream Success Criteria................................................................................................................... 3
Vegetation Success Criteria............................................................................................................. 4
WaterQuality................................................................................................................................... 4
1.4 Project Components.................................................................................................................. 4
1.5 Stream Design/Approach.......................................................................................................... 5
1.6 Construction and As -Built Conditions...................................................................................... 6
1.7 Year 3 Monitoring Performance(MY4).................................................................................... 7
Vegetation........................................................................................................................................ 7
StreamGeomorphology................................................................................................................... 8
StreamHydrology............................................................................................................................ 8
WaterQuality................................................................................................................................... 8
2.0 Methods.................................................................................................................................................. 9
3.0 References............................................................................................................................................. 10
Appendix A: Background Tables
Table 1: Project Mitigation Components
Table 2: Project Activity and Reporting History
Table 3: Project Contacts Table
Table 4: Project Background Information Table
Figure 1: Site Location Map
Appendix B: Visual Assessment Data
Figure 2: Current Conditions Plan View
Vegetation Plot Photos
Monitoring Device Photos
Crossing and Swale Photos
Site Assessment Photos
Appendix C: Vegetation Plot Data
Table 5: Planted Species Summary
Table 6: Vegetation Plot Mitigation Success Summary
Table 7a. Stem Count Total and Planted by Plot Species
Table 7b. Random Vegetation Monitoring Plot Data
Appendix D: Stream Measurement and Geomorphology Data
MY3 Cross -Section Overlay Plots
Table 8. Baseline Stream Data Summary
Table 9. Cross Section Morphology Data Table
Appendix E: Hydrology Data
Table 10.2023 Rainfall Summary
Table 11. Documentation of Geomorphically Significant Flow Events
Appendix F: Water Ouality Data
Table 12. Annual Data Collection (MY4)
Table 13. Physical Water Quality Data Summary
Table 14. Nutrient/Bacteria Water Quality Data Summary
Table 15. Biological Water Quality Data Summary
Carolina Bison 1 Year 4 Monitoring Report
Stream Mitigation Site September 2023
1.0 Proiect Summary
1.1 Project Location and Description
The Carolina Bison Mitigation Site ("the Project"), a project within the RES French Broad 05 Umbrella
Mitigation Bank, is located in Buncombe County, North Carolina approximately two miles northeast of
Leicester. Water quality stressors currently affecting the Project include livestock production and lack of
riparian buffer. The Project presents 4,768 linear feet (LF) of stream restoration and enhancement,
generating 4,675 Cool Stream Mitigation Units (SMU) along Parker Branch and two unnamed tributaries,
supporting goals of the French Broad River Basin Restoration Priorities (RBRP).
The Project is in the French Broad River Basin within Cataloging Unit 06010105, targeted local watershed
(TLW) Newfound Creek Watershed (14-digit HUC 06010105090020). The proposed mitigation site will
restore and protect a catchment within the Newfound watershed, which discharges directly into the French
Broad River.
The Project's total easement area is 10.92 acres within the overall drainage area of 457 acres. The Project
is currently used as a bison farm, where American Bison are raised for meat production alongside watusi,
camels, elk, and white-tailed deer. Grazing livestock have had access to all stream reaches within the
Project. The lack of riparian buffer vegetation, deep-rooted vegetation, and unstable channel characteristics
have contributed to the degradation of stream banks throughout the Project area.
The stream design approach for the Project combined the analog method of natural channel design with
analytical methods to evaluate stream flows and hydraulic performance of the channel and floodplain. The
analog method involved the use of a reference reach, or "template" stream, adjacent to, nearby, or
previously in the same location as the design reach. The template parameters of the analog reach were
replicated to create the features of the design reach. The analog approach is useful when watershed and
boundary conditions are similar between the design and analog reaches (Skidmore et al., 2001). Hydraulic
geometry was developed using analytical methods to identify the design discharge.
The Project will be monitored on a regular basis throughout the seven-year post -construction monitoring
period, or until performance standards are met. Upon approval for closeout by the Interagency Review
Team (IRT), the site will be transferred to Unique Places to Save (UP2S). This party shall serve as
conservation easement holder and long-term steward for the property and will conduct periodic inspection
of the site to ensure that restrictions required in the conservation easement are upheld. Endowment funds
required to uphold easement and deed restrictions will be finalized prior to site transfer to the responsible
party.
1.2 Project Goals and Objectives
Through the comprehensive analysis of the Project's maximum functional uplift using a Function Based
Framework, specific, attainable goals will be realized by the Carolina Bison Mitigation Site. These goals
clearly address the degraded water quality and nutrient input from farming that were identified as major
watershed stressors in the 2009 French Broad RBRP.
The project goals are:
• Reduce sediment inputs into streams;
• Reduce nutrient and fecal coliform inputs into streams;
• Improve aquatic and terrestrial habitat;
• Improve floodplain connectivity;
Carolina Bison 2 Year 4 Monitoring Report
Stream Mitigation Site September 2023
• Restore and enhance appropriate riparian plant communities;
• Assess water quality benefits of stream restoration and contribute to the IRTs developing water
quality dataset.
The project goals were addressed through the following project objectives:
• Designed and reconstructed stream channels that convey bankfull flows while maintaining stable
dimension, profile, and planform based on modeling, watershed conditions, and reference reach
conditions;
• Permanently excluded livestock from stream channels and their associated buffers;
• Added in -stream structures and bank stabilization measures to protect restored and enhanced
streams
• Installed habitat features such as brush toes, constructed riffles, woody materials, and pools of
varying depths to restored and enhanced streams;
• Reduced bank height ratios and increased entrenchment ratios to reference reach conditions;
• Increased forested riparian buffers to at least thirty feet on both sides of the channel along the
Project reaches with a hardwood riparian plant community;
• Treated exotic invasive species;
• Established a permanent conservation easement on the site;
• Performed water quality measurements/sampling and reported results.
Limitations to achieving these watershed goals arise by remaining constrained to our project boundaries.
While we restored habitat and streams to stable and effective conditions that achieve our goals within the
project parcels, we are unable to influence the effect of poor riparian buffers and livestock impact in other
areas within the watershed.
1.3 Project Success Criteria
The Site follows the USACE 2003 Stream Mitigation Guidelines and the "Wilmington District Stream and
Wetland Compensatory Mitigation Update" dated October 24, 2016. Cross section and vegetation plot data
will be collected in Years 0, 1, 2, 3, 5, and 7. Stream hydrology data and visual monitoring will be reported
annually. Physical and chemical water quality parameters will be reported annually, while biological
parameters will be reported in Years 0, 3, 5, and 7.
Stream Success Criteria
Four bankfull flow events must be documented within the seven-year monitoring period. The bankfull
events must occur in separate years. Otherwise, the stream monitoring will continue until four bankfull
events have been documented in separate years.
There should be little change in as -built cross -sections. If changes do take place, they should be evaluated
to determine if they represent a movement toward a less stable condition (for example down -cutting or
erosion), or are minor changes that represent an increase in stability (for example settling, vegetative
changes, deposition along the banks, or decrease in width/depth ratio). Bank height ratio shall not exceed
1.2, and the entrenchment ratio shall be no less than 1.4 within restored riffle cross sections. Channel
stability should be demonstrated through a minimum of four bankfull events documented in the seven-year
monitoring period.
Digital images will be used to subjectively evaluate channel aggradation or degradation, bank erosion,
success of riparian vegetation, and effectiveness of erosion control measures. Longitudinal images should
not indicate the absence of developing bars within the channel or an excessive increase in channel depth.
Carolina Bison 3 Year 4 Monitoring Report
Stream Mitigation Site September 2023
Lateral images should not indicate excessive erosion or continuing degradation of the banks over time. A
series of images over time should indicate successional maturation of riparian vegetation.
Vegetation Success Criteria
Specific and measurable success criteria for plant density within the riparian buffers on the site will follow
IRT Guidance. Vegetation monitoring plots will be a minimum of 0.02 acres in size and cover a minimum
of two percent of the planted area. Vegetation monitoring will occur annually between July 15 and leaf
drop and will include a combination of fixed and random plots. The interim measures of vegetative success
for the site will be the survival of at least 320 planted three-year old trees per acre at the end of Year 3,
260 five-year old trees with an average height of six feet at the end of Year 5, and the final vegetative
success criteria will be 210 trees per acre with an average height of eight feet at the end of Year 7.
Volunteer trees will be counted, identified to species, and included in the yearly monitoring reports, but
will not be counted towards the success criteria of total planted stems.
Water Quality
Water quality and macroinvertebrate indicators will be monitored to document and measure any changes
to physical, chemical, and biological metrics within the project area. These metrics are sensitive to changes
in the project watershed (e.g. land use change and pollutant inputs) and more localized modifications, such
as in -stream habitat improvements and riparian buffer restoration. However, because results might not
demonstrate a measurable improvement over pre -construction conditions, or measurable improvements
may occur slowly, the success of the project will not be tied to these metrics.
Physical water quality sampling was conducted prior to construction and will be for the duration of the
monitoring period using a sampling probe, and will include measurements of acidity (pH), temperature,
dissolved oxygen (DO), and conductivity (EC). Specifically, these measurements will be taken four times
per monitoring year. Additionally, once per year, fecal coliform, total nitrate/nitrite, Total Kjeldahl
Nitrogen (TKN), total phosphorus, and total ammonia samples will be collected. All these data will be
reported annually.
Macroinvertebrate sampling was conducted prior to construction and will be once per year during
monitoring Years 3, 5, and 7. A reference location was also sampled for comparison purposes, located on
a relatively stable reach in an undisturbed setting, located as close to the mitigation site as possible, and
within the same watershed. Results presented will include a list of taxa collected at each site for each
sampling event, as well as an enumeration of the Ephemeroptera, Plecoptera, and Trichoptera (EPT) taxa
and a Biotic Index (see the NCDWR Standard Operating Procedures for Collection and Analysis of Benthic
Macroinvertebrates). Each report will include a summary of the current results and all past monitoring
events in tabular format.
1.4 Project Components
The Project area is comprised of perennial streams, Parker Branch and two unnamed tributaries on a
working American Bison farm and is comprised of nine fenced easement sections, separated by easement
breaks. Descriptions of easement breaks are discussed below. There are six stream reaches, including Parker
Branch (PB1-A, PB1-B, PB1-C, and PB2) and two unnamed tributaries (UT1 and UT2), divided by
treatment type and/or changes in flow. The stream mitigation components are summarized below.
Mitigation credits presented below are based upon the Approved Mitigation Plan. To account for areas of
more or less than minimum 30-foot buffer widths, credits were adjusted using the USACE Wilmington
District Stream Buffer Credit Calculator.
Carolina Bison 4 Year 4 Monitoring Report
Stream Mitigation Site September 2023
Although there are no specific success criteria metrics for water quality and macroinvertebrate monitoring,
both will be monitored and reported as specified in the 2016 Wilmington District Stream and Wetland
Compensatory Mitigation Update in order to generate an additional two percent credit. A proposed variation
on the protocols in the 2016 Wilmington District Stream and Wetland Compensatory Mitigation Update
was provided to the IRT and agreed upon and was outlined in Section 1.3 above. This credit will be
generated on all restoration reaches (PB1, PB2, and UT1) and will not be generated on reach UT2.
Due to landowner and utility requirements, there are eight easement breaks within the project. One break
is for an existing utility easement; fencing will be installed across the utility easement in order to provide
contiguous livestock exclusion to the stream. The other seven are locations for current or future agricultural
crossings. These easement breaks will allow landowners to continue current land -use and access throughout
the property as needed.
Mitigation Plan Credits
Reach
Mitigation Type
Proposed Stationing
Existing
Length
(LF)
Proposed
Length
(LF)
Mitigation
Ratio
SMUs
Restoration
0+11 to 0+90
69
79
1.0:1
79
PB1-A
Restoration
1+34 to 6+54
514
520
1.0:1
520
Restoration
6+84 to 11+05
421
421
1.0:1
421
PB1-B
Restoration
11+68 to 14+23
254
255
1.0:1
255
Restoration
14+23 to 20+30
552
607
1.0:1
607
PB1-C
Restoration
20+70 to 23+55
342
285
1.0:1
285
Restoration
23+55 to 27+34
439
379
1.0:1
379
PB2
Restoration
27+74 to 33+02
498
528
1.0:1
528
Restoration
1+35 to 4+15
262
280
1.0:1
280
Restoration
4+45 to 13+14
809
869
1.0:1
869
UT1
Restoration
13+44 to 16+42
287
298
1.0:1
298
Restoration
16+83 to 18+83
157
200
1.0:1
200
UT2
Enhancement II
0+89 to 1+36
47
47
2.5:1
19
Totals
4,651
4,768
4,740
Non -Standard Buffer Width Adjustment
-159'
Water Quality Monitoring Adjustment
94t
Total Adjusted SMUs
4,675
* Credit adjustment for Non-standard Buffer Width calculation using the Wilmington District Stream Buffer Credit
Calculator issued by the USACE in January 2018. See section 6.6 of the Carolina Bison Final Mitigation Plan for
further information.
t Additional two percent credit on reaches conducting water quality and macroinvertebrate monitoring protocols
specified in the 2016 Wilmington District Stream and Wetland Compensatory Mitigation Update. See section 6.7 of
the Carolina Bison Final Mitigation Plan for further information.
1. S Stream Design/Approach
Stream restoration efforts at the Carolina Bison Site were accomplished through analyses of geomorphic
conditions and watershed characteristics. The design approach applied a combination of analytical and
reference reach -based design methods that meet objectives commensurate with both ecological and
geomorphic improvements. Treatment activities ranged from minor bank grading and planting to re-
establishing stable planform and hydraulic geometry. For full restoration reaches, natural design concepts
Carolina Bison 5 Year 4 Monitoring Report
Stream Mitigation Site September 2023
were applied and verified through rigorous engineering analyses and modeling. The objective of this
approach was to design and construct a channel with stable geomorphology that provides habitat
improvements and ties into the existing landscape. Specifically, treatments included Priority 1 Restoration,
Priority 2 Restoration, and Enhancement Level II.
The Carolina Bison Mitigation Site has been broken into the following reaches:
Reach PB1-A/B/C — These three reaches begin on the north end of the project, flowing south to join UT1
and create PB2, downstream of their confluence. PB1-A results in 1,020 linear feet of Restoration. This
reach was incised and did not have connectivity to the floodplain. Slopes were constructed between 1 % to
1.3% with offline restoration and tied back into the bedrock outcroppings within the pre-existing channel.
PB1-B is 255 linear feet and was also incised and over widened pre -construction. Design and construction
constraints within this reach included the large livestock pen on the left bank and a path that was to be
retained on the right. Within reach PB1-B, design and construction included adding appropriate meander,
raising the bed, and cutting in a floodplain bench while maintaining the 1 % grade. PB 1-C, like PB 1-A, had
less constraints for design and similar restoration activities were performed. PC1-C is 892 linear feet,
joining UT1, and flows east as PB2.
Reach PB2 - This reach begins downstream of the confluence of UT1, flowing east, eventually off the
project site. PB2 is 907 linear feet of Restoration. Prior to construction, this reach had very low bed and
bank stability due to direct livestock access and lack of riparian understory. The larger drainage area of
Reach PB2 had resulted in a wider channel. There is a path on both sides of Parker Branch, but they are just
outside the project easement.
Reach UTl - This tributary begins just west of the project limits from a groundwater seep. Reach UT1
flows east to Parker Branch and totals 1,647 linear feet of Restoration. Sparse woodland and actively
managed pastures were located adjacent to the reach, and livestock had access to this reach. The channel
was designed and constructed to be around 2.25% grade. Additionally, there is a steep slope to the south of
the reach.
Reach UT2 — This reach begins in the middle of the project, flowing northeast into UT1. This reach totals
47 linear feet of Enhancement II. Prior to Project construction, UT2 had little to no livestock access but was
still oversized and incised. Actively managed pasture was located adjacent to the reach. Enhancement
activities included stable reconnection to UT1 and buffer re-establishment, and a rock sill grade control
structure was installed at the tie-in with UTL
1.6 Construction and As -Built Conditions
Stream construction and planting was completed in March 2020 despite abnormally high rainfall that caused
delays. The Carolina Bison Mitigation Site was built to design plans and guidelines barring a few
deviations, including several crossing types changes, the substitution of riprap swales for diffused flow
structures, and the addition of stone toe bank protection. Also, notably, due to weather delays and setbacks,
the fencing was not completed during construction; however, all livestock have been removed from the
project area and do not have access to the Project streams or easement area. Notable changes at the Project
are discussed below.
Carolina Bison 6 Year 4 Monitoring Report
Stream Mitigation Site September 2023
Easement Breaks and Crossings — Proposed vs. As -Built
Reach
Stationing
Proposed Mitigation Plan
As -Built Condition
PB1-A
0+90 to 1+34
Utility Easement
Utility Easement
PB 1-A
6+54 to 6+84
24 LF of Double 54" RCP
Riffle Grade Control installed
PB1-A
11+05 to 11+68
48 LF of 54" and 48" RCP
48 LF of Double 48" RCP
PB1-C
20+30 to 20+70
24 LF of Double 54" RCP
No crossing installed
PB2
27+34 to 27+74
Future bridge location
Future bridge location
UT1
4+15 to 4+45
Remove 30" RCP
Removed 30" RCP
UT1
13+15 to13+45
24 LF of Double 36" RCP
Ford installed
UT1
16+42 to 16+83
24 LF of Double 54" RCP
Riffle Grade Control installed
Note: Entire easement boundary will be fenced.
The Diffuse Flow Structures proposed on reaches PB1-A and UT1 were substituted for Riprap Swales to
address erosional forces in these areas. In addition, several other small riprap swales were installed
throughout the Project upon discovery of rills and erosional areas resulting from concentrated runoff during
construction.
All areas mentioned above are identified on the as -built survey, which is included along with a redline
version of the as -built survey, in the As -Built Report. Project credits are based on design centerline, but as -
built stream lengths are shown on Appendix A, Table 1.
Also, there were several bare root planting changes compared to the mitigation plan due to bare root
availability. Pawpaw (Asimina triloba) and musclewood (Carpinus carolinia) were removed, while willow
oak (Quercus phellos), black walnut (Juglans nigra), southern crabapple (Malus angustifolia), eastern
redbud (Cercis canadensis), sugarberry (Celtis laevigata), silky dogwood (Cornus amomum), American
plum (Prunus Americana), and hazel alder (Alnus serrulata) were added. See Appendix C, Table 5 for the
complete as -built planted species list.
1.7 Year 4 Monitoring Performance (MY4)
The Carolina Bison Year 4 Monitoring (MY4) activities were performed in March and August 2023. All
MY4 Monitoring data is present below and in the appendices. The Site is on track to meeting vegetation
and stream interim success criteria.
Vegetation
Vegetation data was not required for MY4. Vegetation data from MY3 can be found in Appendix C,
associated photos are in Appendix B, and plot locations are in Appendix B. MY3 monitoring data indicated
that all plots are exceeding the interim success criteria of 320 planted stems per acre. Planted stem densities
ranged from 324 to 1,133 planted stems per acre with a mean of 735 across the six permanent plots, while
planted stem densities ranged from 526 to 769 planted stems per acre with a mean of 661 across the three
random plots. An average of 710 planted stems per acre were recorded across both permanent and random
plots. A total of 13 species were documented within the plots. Volunteer species were noted in six of the
plots, with an average of 103 volunteer stems per acre. The average stem height across all vegetation plots
was 4.3 feet.
Carolina Bison 7 Year 4 Monitoring Report
Stream Mitigation Site September 2023
Visual assessment of vegetation outside of the monitoring plots indicates that the herbaceous vegetation is
becoming well established throughout the project. Additionally, in MY4, RES continued removing black
walnut and crabapple stems if found on the site. Since these species make up such a small percentage of
species composition RES does not anticipate needing replanting in areas of removal. Easement
encroachment has occurred on UT 1 near the confluence of UT2. RES has notified the landowner through
phone messages of easement requirements and is sending a letter documenting the encroachment and RES's
response to the encroachment. Easement signs and horse tape have been added in this area in addition to
the communications RES has issued to the landowner. RES will replant this 0.05-acre area with container
trees to encourage vegetative succession. Species composition will be based on the approved planting
species list with consideration on species diversity requirements.
Stream Geomorphology
Geomorphology data was not required for MY4. Monitoring results from MY3 are included in Appendix
D. Summary tables and cross section plots from MY3 are in Appendix D and normal monitoring activities
will resume in 2024 (MY5). Overall, the baseline cross sections and profile on the restoration reach
relatively match the design.
Visual assessment of the stream channel was performed to document signs of instability, such as eroding
banks, structural instability, or excessive sedimentation. The channel is transporting sediment as designed
and will continue to be monitored for aggradation and degradation. The rip rap swale on the left bank of
PB1-A, that was failing in MY1, has been fixed. The swale is heavily vegetated and continuing to maintain
its structure and is performing properly. A structure between cross sections 18 and 19 was noticed to be
piping during the March 2023 site walk, however, does not appear to be affecting stability. RES will
evaluate this winter whether some light maintenance activity could block the piping and re-route the water
to return to the intended design flow path. Cross sections 13 and 14 appeared to be filling in due to in -
stream vegetation leading to increased deposition. As can be seen in photographs in Appendix B, the
channel is still very present and although it may be shallower than the original design it is functioning and
has reached stability at its current cross section. In -stream vegetation was treated in August 2022, these
cross sections will be surveyed again in MY5 and will determine whether any additional actions need to
occur.
Stream Hydrology
In May 2020, one stage recorder was installed per restoration reach; PB1-C, P132, and UT1, for a total of
three stage recorders. There were seven total bankfull events recorded in MY4, one on PB 1-C, two on PB2,
and four on UT1. The gage on PB2 was not downloaded in August as intended, due to a malfunction with
the downloading shuttle, the stage recorder is still functioning and missing data will be included in next
year's monitoring report. This year marks the fourth year in which, there have been at least one bankfull
event in four separate years of monitoring. The stage recorder locations can be found on Figure 2, photos
are in Appendix B, and associated data is in Appendix E.
Water Quality
Physical water quality data (pH, temperature, DO, and conductivity) were collected during MY4 in the
winter (December 06, 2022), spring (March 28, 2023), and summer (August 15, 2023) on the restored
tributaries at the five sampling locations represented on Figure 2. Additional physical water quality data
for the Fall quarter will be collected before the end of 2023. Nutrient and bacteria samples were collected
on August 15`h, 2023. All data collected for the year as well as summaries of current results and all past
water quality monitoring events are presented in tabular format in Appendix F. Furthermore, RES expects
Carolina Bison 8 Year 4 Monitoring Report
Stream Mitigation Site September 2023
to collect a full suite of data in the coming monitoring years in accordance with the plan outlined in Section
1.3, above.
Physical water quality data results indicate that water quality is trending towards healthier and more
beneficial levels across the site as matures post construction. No correlations can be inferred based on data
that vary from sampling locations taken on the same date.
Nutrient and Bacteria data has been collected annually since monitoring year two, no samples were taken
at As -Built and during monitoring year one due to the affect construction would have. Across the site, Total
Nitrogen has decreased at all sampling stations since monitoring started, however levels have fluctuated in
MY4 across all parameters. We believe the increase is due to samples being collected in August 2023. Total
Kjeldahal Nitrogen, NO2 plus NO3, and Total Phosphorus have still decreased overall from pre
construction (2019) to MY4 (2022). Fecal Coliform levels have varied across the site through the
monitoring years. As the riparian zones continue to mature, we hope to see declines in nutrient and coliform
levels. Nutrient and Bacteria sampling will be collected annually for the remainder of the monitoring period.
Overall, the data clearly indicates improvements between sites located lower in the watershed versus those
sites near the headwater sections and chemical water quality conditions across the site have improved post
construction.
Benthic macroinvertebrates have been collected from three locations as part of the Carolina Bison
restoration project; preconstruction in 2019 and the first survey following construction in 2022. The stream
features are small and a modification of the full scale collection protocol was used at all locations. Data
from each location noted improvements in the benthic fauna following construction and wetland creation.
Most significantly the data from the upstream location (PB 1 a) improved from a Poor bioclassification to a
Good/Fair bioclassification resulting in ecological uplift. EPT taxa richness and abundance, as well as the
number of intolerant taxa all increased at each location. No seasonal correction has been applied since
collection timing has remained consistent across the monitoring period. Benthic macroinvertebrates are due
to be collected again in MY5.
2.0 Methods
Stream geomorphology monitoring is being conducted using a Topcon GTS-312 Total Station. Three-
dimensional coordinates associated with cross-section data were collected in the field (NAD83 State Plane
feet FIPS 3200). Morphological data were collected at 20 cross -sections. Survey data were imported into
CAD, ArcGIS®, and Microsoft Excel® for data processing and analysis.
Hydrology is being monitored using stage recorders, which utilize automatic pressure transducers, and were
installed within the channels. The pressure transducers record frequency, duration, and stage of bankfull
events and are programmed to record readings at an hourly interval. A surveyed elevation was recorded at
the bed and top of bank at the stage recorder elevation, allowing for accurate bankfull events to be recorded.
Vegetation success is being monitored at six permanent monitoring plots and three random plots for a total
of nine plots. Locations of random plots will vary from year to year and will be shown in Figure 2, and
species and height will be recorded for all woody stems. Vegetation plot monitoring follows the CVS-EEP
Level 2 Protocol for Recording Vegetation, version 4.2 (Lee et al. 2008) and includes analysis of species
composition and density of planted species. Data are processed using the CVS data entry tool. In the field,
the four corners of each plot were permanently marked with PVC at the origin and metal conduit at the
other corners. Photos of each plot are to be taken from the origin each monitoring year.
For physical water quality monitoring, acidity (pH), temperature, dissolved oxygen, and conductivity is
being measured using an ExStik DO 600 dissolved oxygen meter and an ExStik EC 500
Carolina Bison 9 Year 4 Monitoring Report
Stream Mitigation Site September 2023
Conductivity/TDS/Salinity/Temperature meter in accordance with the devices manufacturer's
instructions/protocols.
For chemical water quality, fecal coliform, total nitrate/nitrite, Total Kjeldahl Nitrogen (TKN), total
phosphorus, and total ammonia is being collected by Penrose Environmental and delivered to the Pace
Laboratory in Asheville for analysis.
For macroinvertebrate monitoring, Penrose Environmental is collecting and analyzing samples. The
macroinvertebrate sampling is being conducted in accordance with the NCDWR Qual 4 macroinvertebrate
sampling protocol, which is described in the most current version of the Standard Operating Procedures
for Collection and Analysis of Benthic Macroinvertebrates, February 2016 (Version 5.0). Sampling is being
conducted during the same time of year to minimize seasonal differences in the data from year-to-year.
Additionally, sampling will be conducted at the same time as water quality monitoring (pre -construction
and years 3,5,7), and within the index period referenced in the North Carolina Division of Water Resources
(NCDWR) document entitled Small Streams Biocriteria Development, dated May 29, 2009.
Macroinvertebrate samples are identified to the lowest practical taxonomic level (usually Genus) by a
qualified. Results presented include a list of taxa collected at each site for each sampling event, as well as
an enumeration of the Ephemeroptera, Plecoptera, and Trichoptera (EPT) taxa and a Biotic Index (see the
NCDWR Standard Operating Procedures for Collection and Analysis of Benthic Macroinvertebrates). Each
report includes a summary of the current results and all past monitoring events in tabular format.
3.0 References
Harman, W., R. Starr, M. Carter, K. Tweedy, M. Clemmons, K. Suggs, C. Miller. 2012. A Function -
Based Framework for Stream Assessment and Restoration Projects. US Environmental Protection
Agency, Office of Wetlands, Oceans, and Watersheds, Washington, DC EPA 843-K-12-006.
Lee Michael T., Peet Robert K., Roberts Steven D., and Wentworth Thomas R. 2008. CVS-EEP Protocol
for Recording Vegetation Level. Version 4.2
North Carolina Division of Water Resources. February 2016. Standard Operating Procedures for the
Collection and Analysis of Benthic Maroinvertebrates. North Carolina Department of
Environmental Quality.
Peet, R.K., Wentworth, T.S., and White, P.S. (1998), A flexible, multipurpose method for recording
vegetation composition and structure. Castanea 63:262-274
Penrose Environmental. April 2019 (Revised April 2020) Benthic Insect Summary. Carolina Bison
Project.
Resource Environmental Solutions. 2019. Carolina Bison Stream Mitigation Site Final Mitigation Plan.
Rosgen, D. 1996. Applied River Morphology, 2nd edition, Wildland Hydrology, Pagosa Springs, CO.
US Army Corps of Engineers (USACE). 2003. April 2003 NC Stream Mitigation Guidelines.
USACE. 2016. Wilmington District Stream and Wetland Compensatory Mitigation Update.
Carolina Bison 10 Year 4 Monitoring Report
Stream Mitigation Site September 2023
Appendix A
Site Location
Background Tables
Table 1. Carolina Bison - Mitigation Assets and Components
Existing
Mitigation
Footage
Plan
Mitigation
As -Built
or
Footage or
Mitigation
Restoration
Priority
Mitigation
Plan
Footage or
Project Segment
Acreage
Acreage
Category
Level
Level
Ratio (X:1)
Credits
Acreage
Comments
3 year 9 months
-01
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
3 year 8 months
69
79
Cool
R
1
1.00000
79.000
79
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
4
514
520
Cool
R
1
1.00000
520.000
520
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
P61-A
421
421
Cool
R
1
1.00000
421.000
421
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
P131-13
254
255
Cool
R
1
1.00000
255.000
255
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
P61-C
552
607
Cool
R
1
1.00000
607.000
607
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
P131-C
342
285
Cool
R
1
1.00000
285.000
285
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
P62
439
379
Cool
R
1
1.00000
379.000
379
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
P132
498
528
Cool
R
1
1.00000
528.000
528
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
UT1
262
280
Cool
R
1
1.00000
280.000
280
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
UT1
809
869
Cool
R
1
1.00000
869.000
869
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
UT1
287
298
Cool
R
1
1.00000
298.000
298
Conservation Easement
Full Channel Restoration, Planted Buffer, Exclusion of Livestock, Permanent
UT1
1571
200
Cool
R
1
1.00000
200.000
200
Conservation Easement
Exclusion of Livestock, Permanent Conservation Easement, Supplemental
UT2
47
47
Cool
Ell
NA
2.50000
18.800
47
Plantin
Project Credits
Restoration Level
Stream
Riparian Wetland Non -Rip
Riverine Non-Riv Wetland
Coastal
Marsh
Warm
Cool
Cold
Restoration
4721.000
Re-establishment
Rehabilitation
Enhancement I
Enhancement II
18.800
Creation
Preservation
Total
4739.800
Credit Loss in Buffer
-490
Credit Gain in Buffer
331
Credit Gain for Water Quality Monitoring
94
Total Adjusted SMUs
1 4674.800
Table 2. Project Activity and Reporting History
Carolina Bison Mitigation Site
Elapsed Time Since grading complete: 3 year 9 months
Elapsed Time Since planting complete: 3 year 8 months
Number of reporting Years : 4
Activity or Deliverable
Data Collection
Complete
Completion or
Delivery
Restoration Plan
NA
Mar-19
Final Design — Construction Plans
NA
Aug-19
Stream Construction
NA
Feb-20
Site Planting
NA
Mar-20
As -built (Year 0 Monitoring — baseline)
May-20
Jun-20
Year 1 Monitoring
Oct-20
Dec-20
Supplemental Planting
NA
Feb-21
Swale Repair
NA
Feb-21
Year 2 Monitoring
XS: Jul-21
VP: Oct-21
Nov-21
Invasive Vegetation Treatment
NA
Aug-22
Year 3 Monitoring
XS: Jun-22
VP: Sep-22
Oct-22
Easement Repair
NA
Sep-23
Year 4 Monitoring
XS: NA
VP: NA
Sep-23
Year 5 Monitoring
Year 6 Monitoring
Year 7 Monitoring
= The number of reports or data points produced excluding the baseline
Table 3. Project Contacts Table
Carolina Bison Mitigation Site
Designer
RES / 3600 Glenwood Avenue, Suite 100, Raleigh, North
Carolina 27612.
Primary project design POC
Frasier Mullen
Construction Contractor
Wright Contracting, LLC / 453 Silk Hope Liberty Rd, Siler City,
NC 27344
Construction contractor POC
Joe Wright
Survey Contractor
Kee Mapping & Surveying / 88 Central Ave., Asheville, NC
28801
Survey contractor POC
Nick Haase
Planting Contractor
H&J Forestry
Planting contractor POC
Matt Hitch
Monitoring Performers
RES / 401 Charles Av, Charlotte, North Carolina 28205
Stream Monitoring POC
Daniel Dixon (864) 567-7761
Vegetation Monitoring POC
Daniel Dixon (864) 567-7761
Table 4. Project Background Information
Project Name
Carolina Bison
County
Buncombe
Project Area (acres)
10.92
Project Coordinates (latitude and longitude)
Latitude: 35.671107 N Longitude:-82.669235 W
Planted Acreage (Acres of Woody Stems Planted)
10.23
Project Watershed Summary Information
Physiographic Province
Mountains
River Basin
French Broad
USGS Hydrologic Unit 8-digit
6010105
USGS Hydrologic Unit 14-digit
06010105090020
DWR Sub -basin
04-03-02
Project Drainage Area (Acres and Square Miles)
457 ac (0.714 mil)
Project Drainage Area Percentage of Impervious Area
1 %
CGIA Land Use Classification
Agriculture (58.3%), Residential (22.4%), Forest (18.2%), Impervious (1.1 %)
Reach Summary Information
Parameters
PB7-A
PB1-13
PB1-C
PB2
UT1
UT2
Length of reach (linear feet) (designed)
1020
255
892
907
1647
47
Valley confinement (Confined, moderately confined, unconfined)
Unconfined
Unconfined
Unconfined
Moderately
Confined
Unconfined
Unconfined
Drainage area (Acres)
237
263
276
457
127
66
Perennial, Intermittent, Ephemeral
P
P
P
P
P
P
NCDWR Water Quality Classification
C
C
C
C
C
C
Stream Classification (existing)
C5
E5
E5
B5c
E5/6b
F5/6b
Stream Classification (proposed)
C4
C4
B4c
E4
E4
--
Evolutionary trend (Simon) (existing)
IV
IV
IV
III
III
III
FEMA classification
None
None
None
None
None
None
Regulatory Considerations
Parameters
Applicable?
Resolved?
Supporting
Docs?
Water of the United States - Section 404
Yes
Yes
SAW-2016-
02357
Water of the United States - Section 401
Yes
Yes
DWR # 18-
0063
Endangered Species Act
Yes
Yes
USFWS
(8/2/2018
Letter)
Historic Preservation Act
Yes
Yes
SHPO
(2/28/18
Letter
Coastal Zone Management Act (CZMA or CAMA)
No
N/A
N/A
FEMA Floodplain Compliance
No
N/A
N/A
Essential Fisheries Habitat
No
N/A
N/A
Gl-Held Way
o`
x
�a
a
P 4
AA Q
Z
3
f
Prn
nanf
Qennantt
_ �0
o
n
�a1e C°�e Rd
>r
D
C Gillespie Way
6P ^ Rado\\t\ O�
c
ep
P
6
o
0
}hwest Est
eis eallev N1aY
A ? Is,F G,,,,
7
n � �
' � a
ti, G ae
�
plexa°der Rd
Ri d9P
Pn
<n
z
n
0
a �T
Cranae
to Ke°la°d Rd
c
5
Pr�H r�sam
a
T
i
m
b
�,o
m
\3
C°
°P,
6
O
'o
r'
x
�raQF �
4
r O
r,7 � q Pebble Trl �;
a
y
a
se
6
P'�ch Ct ea b
Y
Q,
eee d O� P^ m P
ch Cre o e y /�
Hollar y
eaten pio a aCe pc
Q'
Legend a
Q
Conservation Easement
r
ti
N
Date: 3/31/2020
Figure 1 - Site Location Map
w e Drawn by: MDD res
5 Carolina Bison Mitigation Site
Checked by: BPB
0 500 1,000
Buncombe County, North Carolina 1 inch = 1,000 feet
Feet
Appendix B
Visual Assessment Data
Carolina Bison MY3 Vegetation Monitoring Plot Photos (09/13/2022)
Vegetation Plot 1
Vegetation Plot 3
Vegetation Plot 5
Vegetation Plot 2
Vegetation Plot 4
�21
I..Pw
Vegetation Plot 6
Random Vegetation Plot 1
Random Vegetation Plot 3
Random Vegetation Plot 2
5
_ _
i x
r
FIL
I�5
1lab—
,*l ti� ��9 •/ � err_ 1'ti�
Stage Recorder (PB2) — 03/28/2023
Carolina Bison MY4 Crossing and Swale Photos (03/28/2023)
Culvert Crossing Upstream (PB1)
Culvert Crossing Downstream (PB1)
II''YYt• yL 'y '�qr
1. '1: * _ + � �`�-�- •� � r
x rM1 ;
L. X., A
4� �- I •.l Ta-- � ;• � �r k• f �
Carolina Bison MY4 Site Assessment Photos (03/28/2023)
UT Near XS 13/14
UT Near XS 13/14
Appendix C
Vegetation Plot Data
MY3 (2022)
Appendix C. Vegetation Assessment Data
Table 5. Planted Species Summary
Common Name
Scientific Name
Total Stems Planted
Northern Red Oak
Quercus rubra
1,600
Willow Oak
Quercus phellos
1,500
Green Ash
Fraxinuss pennsylvanica
1,400
River Birch
Betula ni ra
1,400
Sycamore
Platanus occidentalis
1,400
Black Walnut
Juglans nigra
1,000
Swamp Chestnut Oak
Quercus michauxii
1,000
Yellow Poplar
Liriodendron tulipifera
1,000
Southern Crapapple
Malus an usti olia
1,000
Eastern Redbud
Cercis canadensis
1,000
Elderberry
Sambucus ni ra
500
Sugarberry
Celtis laevigata
350
Siky Dogwood
Cornus ammomum
300
American Plum
Prunus americana
300
Hazel Alder
Alnus serrulata
200
Total
13,950
Planted Area
10.2
As -built Planted Stems/Acre
1,368
Table 6. Vegetation Plot Mitigation Success Summary
Plot #
Planted
Stems/Acre
Volunteer
Stems/Acre
Total
Stems/Acre
Success
Criteria
Met?
Average
Planted
Stem Height
(ft)
1
931
405
1335
Yes
6.2
2
809
162
971
Yes
4.0
3
324
81
405
Yes
3.5
4
1133
121
1255
Yes
3.6
5
647
81
728
Yes
4.5
6
567
81
647
Yes
3.1
R1
688
0
688
Yes
3.6
R2
1 526
0
526
Yes
6.4
R3
769
0
769
Yes
4.0
Project Avg
710
103
814
Yes
4.3
Appendix C. Vegetation Assessment Data
Table 7a. Stem Count Total and Planted by Plot Species
Current Plot Data (MY3 2022)
Scientific Name
Common Name
Species Type
04082020-01-0001
04082020-01-0002
04082020-01-0003
04082020-01-0004
04082020-01-0005
04082020-01-0006
R1
R2
R3
T
PnoLS
P-all
T
Pnol-S
P-all
T
Pnol-S
P-all
T
PnoLS
P-all
T
PnoLS
P-all
T
PnoLS
P-all
T
Pnol-S
P-all
T
Pnol-S
P-all
T
Alnus serrulata
hazel alder
Shrub
Betula nigra
river birch
Tree
M
3
3
3
1
1
1
3
3
3
1
1
1
2
2
2
4
4
4
2
2
2
Celtis laevigata
sugarberry
Tree
1
1
1
2
2
2
Cercis canadensis
eastern redbud
Tree
Cornus amomum
silky dogwood
Shrub
1
1
2
Diospyros virginiana
common persimmon
Tree
51
5
5
1
1
1
1
1
1
6
6
6
Fraxinus pennsylvanica
green ash
Tree
5
5
5
4
4
4
1
1
1
4
4
4
5
5
5
2
2
2
5
5
5
Juglans nigra
black walnut
Tree
1
1
1
Liriodendron tulipifera
tuliptree
Tree
Malus angustifolia
southern crabapple
Tree
1
1
1
Morus rubra
red mulberry
Tree
11
1
1
11
1
1
Plata nus occidentalis
American sycamore
Tree
5
5
15
1
1
4
3
3
4
4
4
6
5
5
7
2
6
6
6
7
7
7
Prunus americana
American plum
Tree
Quercus lyrata
Overcup oak
1
1
1
Quercus michauxii
swamp chestnut oak
Tree
6
6
6
1
1
1
9
9
10
5
5
5
10
10
10
Quercus phellos
willow oak
Tree
6
6
6
9
9
10
1
1
1
1
11
1
21
2
2
31
3
3
3
3
3
Quercus rubra
northern red oak
Tree
2
2
2
4
4
4
1
1
1
Stem count
size (ares)
size (ACRES)
Species count
Stems per ACRE
23
23
33
20
20
24
8
8
10
28
28
31
16
16
18
14
14
16
17
17
17
13
13
13
19
19
19
1
1
1
1
1
1
1
1
1
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
5
5
5
5
5
5
6
6
6
9
9
9
7
7
7
2
2
3
5
5
5
3
3
3
6
6
6
931
931
1335
809
8091
971
3241
3241
4051
11331
11331
12551
6471
647
728
5671
5671
647
6881
6881
6881
5261
5261
5261
7691
7691
769
Annual Means
Scientific Name
Common Name
Species Type
MY3 (2022)
MY2 (2021)
MY1(2020)
MYO (2020)
Pnol-S
P-all
T
PnoLS
P-all
T
Pnol-S
P-all
T
Pnol-S
P-all
T
Alnus serrulata
hazel alder
Shrub
1
1
1
2
2
2
Betula nigra
river birch
Tree
16
16
16
7
7
7
8
8
8
17
17
17
Celtis laevigata
sugarberry
Tree
3
3
3
4
4
4
5
5
5
17
17
17
Cercis canadensis
eastern redbud
Tree
1
1
1
1
1
1
7
7
7
Cornus amomum
silky dogwood
Shrub
1
1
2
1
1
1
1
1
1
2
2
2
Diospyros virginiana
common persimmon
Tree
13
13
13
4
4
4
Fraxinus pennsylvanica
green ash
Tree
26
26
26
14
14
14
14
14
14
16
16
16
Juglans nigra
black walnut
Tree
1
1
1
3
3
5
7
7
7
16
16
16
Liriodendron tulipifera
tuliptree
Tree
2
2
2
4
4
4
15
15
15
Malus angustifolia
southern crabapple
Tree
1
1
1
1
1
11
1
1
1
2
2
2
Morus rubra
red mulberry
Tree
2
2
2
11
1
1
1
1
1
Plata nus occidentalis
American sycamore
Tree
31
31
51
17
17
68
17
17
17
10
10
10
Prunus americana
American plum
Tree
1
1
1
3
3
3
Quercus lyrata
Overcup oak
1
1
1
Quercus michauxii
swamp chestnut oak
Tree
31
31
32
33
33
33
36
36
361
24
24
24
Quercus phellos
low oak
Tree
25
25
26
22
22
22
26
26
26
32
32
32
Quercus rubra
[northernred oak
ITree
7
7
7
8
8
8
12
12
12
17
171
17
Stem count
size (ares)
size (ACRES)
Species countl
Stems per ACRE
158
158
181
118
118
171
135
135
135
180
180
180
9
6
6
6
0.22
0.15
0.15
0.15
131
131
13
141
141
141
15
15
15
141
141
14
1 7101
7101
8141
7961
7961
11531
9111
9111
911
12141
12141
1214
Appendix C. Vegetation Assessment Data
Table 7b. Random Vegetation Monitoring Plot Data
Random Plot 1
#
Species
Height cm
1
Betula ni ra
160
2
Betula ni ra
155
3
Platanus occidentalis
90
4
Quercus phellos
110
5
Platanus occidentalis
80
6
Platanus occidentalis
60
7
Fraxinus pennsylvanica
90
8
Quercus l rata
55
9
Platanus occidentalis
140
10
Fraxinus pennsylvanica
170
11
Fraxinus pennsylvanica
170
12
Platanus occidentalis
140
13
Fraxinus pennsylvanica
85
14
Fraxinus pennsylvanica
70
15
Quercus phellos
65
16
Quercus phellos
130
17
Betula ni ra
80
Stems/Acre
688
Average Height cm
109
Average Height ft
3.6
Plot Size m
25 x 4
Random Plot 2
#
Species
Height cm
1
Platanus occidentalis
260
2
Platanus occidentalis
200
3
Platanus occidentalis
270
4
Platanus occidentalis
280
5
Betula ni ra
175
6
Betula ni ra
175
7
Platanus occidentalis
170
8
Betula ni ra
170
9
Platanus occidentalis
140
10
Betula ni ra
180
11
Fraxinus pennsylvanica
240
12
Fraxinus pennsylvanica
200
13
Platanus occidentalis
80
Stems/Acre
526
Average Height cm
195
Average Height ft
6.4
Plot Size m
25 x 4
Random Plot 3
#
Species
Height cm
1
Betula ni ra
160
2
Diospyros vir iniana
70
3
Diospyros vir iniana
85
4
Betula ni ra
100
5
Fraxinus pennsylvanica
140
6
Fraxinus pennsylvanica
180
7
Diospyros vir iniana
120
8
Celtis laevi ata
70
9
Fraxinus pennsylvanica
250
10
Diospyros vir iniana
120
11
Fraxinus pennsylvanica
140
12
Diospyros vir iniana
110
13
Fraxinus pennsylvanica
200
14
Celtis laevi ata
60
15
Quercus phellos
70
16
Quercus phellos
110
17
Quercus phellos
120
18
Diospyros vir iniana
100
19
Morus rubra
110
Stems/Acre
769
Average Height cm
122
Average Height ft
4.0
Plot Size m
25 x 4
Appendix D
Stream Measurement and
Geomorphology Data
MY3 (2022)
Upstream
•_�p� e i T
r
Downstream
Carolina Bison - Reach PB1-A - Cross Section 1 - Pool - (Restoration)
2056
2055
2054
c
° 2053
•2 L•S
S •J i
•J i•2
t•S
i
i
•S •
i•i
i•
°
LLJ
2052
i
•J i •
• i•2
L•S •
• S
2051
2050
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 — MY1-2020 MY2-2021 MY3-2022 — — — Approx. Bankfull • • • • Low Bank Height
3X Vertical Exaggeration
Cross Section 1 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2051.91
2052.2
2052.1
2052.2
Bankfull Width (ft)'
5.5
5.9
5.3
4.8
Floodprone Width (ft)'
-
I -
-
-
Bankfull Max Depth (ft)2
1.5
1.6
1.9
1.9
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
5.4
5.4
6.6
5.8
Bankfull Entrenchment Ratio'
-
-
-
-
Bankfull Bank Height Ratio'
-
-
-
Upstream
Downstream
Carolina Bison - Reach PB1-A - Cross Section 2 - Riffle - (Restoration)
2056
2055
2054
° 2053
w
2052
• J V
i •�• •1 �• J `•
v• i
�• J
r• J
• i
J v•
t• i
1�•
L• J
V• J 1•
2051
2050
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 - MY1-2020 MY2-2021
MY3-2022 - - - Approx. Bankfull Flo prone Area
• Low Bank Hel ht
3X Vertical Exa eration
Cross Section 2 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2052.01
2052.1
2052.2
2052.3
Bankfull Width (ft)'
7.5
10.2
8.9
8.6
Floodprone Width (ft)'
>49.9
>47.5
>49.2
>49.9
Bankfull Max Depth (ft)2
1.3
1 1.2
1.4
1.5
Low Bank Elevation (ft)
2052.01
2052.1
2052.3
2052.3
Bankfull Cross Sectional Area (ft2)2
5.9
5.9
6.5
6.2
Bankfull Entrenchment Ratio'
>6.7
>4.9
>5.5
>5.8
Bankfull Bank Height Ratio'
1.0
1.0
1.0
1.0
Upstream
Downstream
Carolina Bison - Reach PB1-A - Cross Section 3 - Pool - (Restoration)
2048
2047
2046
c
°
POW
w
2045
..
..
..
..
.......
..
..
..
..
2044
2043
2042
0 3 6 9 12 15 18
21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 MY1-2020
MY2-2021 MY3-2022 — — -Approx. Bankfull • • • • Low Bank Height
3X Vertical Exaggeration
Cross Section 3 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2044.72
2044.7
2045.0
2044.5
Bankfull Width (ft)'
7.1
6.6
5.7
5.6
Floodprone Width (ft)'
-
-
-
-
Bankfull Max Depth (ft)2
2.5
2.5
2.8
2.6
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
9.0
9.0
10.7
11.2
Bankfull Entrenchment Ratio'
-
-
-
-
Bankfull Bank Height Ratio'
-
-
i - i
i
i
Upstream
Downstream
Carolina Bison - Reach PB1-A - Cross Section 4 - Riffle - (Restoration)
2048
2047
2046
c
°
.5
>
w
2045
2044
2043
2042
0 3 6 9 12 15 18
21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019
MY3-2022
• Low Bank Height
MY1-2020
- - - Approx. Bankfull
MY2-2021
Floodprone Area
3X Vertical Exa eration
Cross Section 4 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA1
2044.35
2044.3
2044.4
2044.4
Bankfull Width (ft)l
7.4
7.3
6.7
5.0
Floodprone Width (ft)'
>36.4
>36.7
>37.0
>37.6
Bankfull Max Depth (ft)2
0.9
0.8
1.2
1.1
Low Bank Elevation (ft)
2044.35
2044.6
2044.7
2044.4
Bankfull Cross Sectional Area (ftz)z
3.7
3.7
5.7
3.8
Bankfull Entrenchment Ratio'
>4.9
>6.9
>5.5
>7.6
Bankfull Bank Height Ratio'
1.0
1.2
1.3
1 1.0
2038
2037
2036
c
° 2035
Z6
°
w 2034
2033
T yJ.M�4
Downstream
Carolina Bison - Reach PB1-B - Cross Section 5 - Riffle - (Restoration)
F •- -h - - I..- rl.- -.l. -.0 7\ i+ r ..# - . -
2032
0 3 6 9 12 15 18 21
24 27 30 33 36 39 42 45 48
Distance (ft)
3X Vertical Exaggeration I
Cross Section 5 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2034.47
2034.6
2034.5
2034.7
Bankfull Width (ft)'
9.4
10.2
9.2
10.2
Floodprone Width (ft)'
>42.4
>42.9
>42.8
>43.8
Bankfull Max Depth (ft)2
1.8
1.9
2.1
2.1
Low Bank Elevation (ft)
2034.47
2034.5
2034.6
2034.7
Bankfull Cross Sectional Area (ft2)2
9.4
9.4
10.6
9.6
Bankfull Entrenchment Ratio'
>4.5
>4.9
>4.7
>4.3
Bankfull Bank Height Ratio'
1.0
1.0
1.1
1.0
Upstream
Downstream
Carolina Bridge - Reach PB1-B - Cross Section 6 - Pool - (Restoration)
2038
2037
2036
c
°
w
2035
2034
. ..
:.—.:.—
.: —
..
:.— ..
.—. —
....
—
.. —
.
—.:
. :.—
.
..
..
2033
oil
-
2032
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 MY1-2020 MY2-2021 — MY3-2022 — — — Approx. Bankfull • • • • Low Bank Height
3X Vertical Exaggeration
Cross Section 6 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2034.46
2034.5
2034.5
2034.7
Bankfull Width (ft)'
8.2
9.2
9.1
9.6
Floodprone Width (ft)'
-
-
-
-
Bankfull Max Depth (ft)2
1.6
1.6
1.8
1.5
Low Bank Elevation (ft)
-
-
-
Bankfull Cross Sectional Area (ft2)2
8.0
8.0
8.5
7.1
Bankfull Entrenchment Ratio'
-
-
-
-
Bankfull Bank Height Ratio'
Upstream
Downstream
Carolina Bison - Reach PB1-C - Cross Section 7 - Riffle - (Restoration)
2035
2034
2033
c
°
2032
°
w 2031
2030
2029
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019
MY3-2022
• Low Bank Hei ht
MY1-2020
- - - Approx. Bankfull
MY2-2Area021
Flo prone
3X Vertical Exaggeration
Cross Section 7 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2030.98
2031.1
2031.2
2031.1
Bankfull Width (ft)'
8.2
8.6
8.8
8.0
Floodprone Width (ft)'
>34.6
>35.8
>35.8
>37.7
Bankfull Max Depth (ft)2
1.0
1.1
1.2
1.3
Low Bank Elevation (ft)
2030.98
2031.2
2031.3
2031.1
Bankfull Cross Sectional Area (ft2)2
5.5
5.5
5.9
5.3
Bankfull Entrenchment Ratio'
>4.2
>5.8
>4.1
>4.7
Bankfull Bank Height Ratio'
1.0
1.0
1.0
1.0
Upstream
Downstream
Carolina Bison - Reach PB1-C - Cross Section 8 - Pool - (Restoration)
2034
2033
2032
c
°
:. 2031
m
a�
w
2030
. ..
.. ..
.. ..
.. ..
.. ..
.. ..
..
. ..
. ..
............
. . ....
.. ..
..
2029
2028
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 MY1-2020 MY2-2021 MY3-2022 — — — Approx. Bankfull • • • • Low Bank Height
3X Vertical Exaqqa=
Cross Section 8 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2030.82
2031.0
2031.1
2031.0
Bankfull Width (ft)'
7.5
8.2
10.4
7.1
Floodprone Width (ft)'
-
-
-
Bankfull Max Depth (ft)2
2.3
2.4
2.4
2.4
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
10.0
10.0
9.3
9.2
Bankfull Entrenchment Ratio'
-
-
-
Bankfull Bank Height Ratio'
-
-
A
n WX 4 Y
d % F
4 f�
Upstream
Downstream
2065
Carolina Bison - Reach UT1 - Cross Section 9 - Riffle - (Restoration)
2064
2063
S
°
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
:.
m
2062
. .
.. ..
.. ..
.. ..
.. ..
.. ..
..
. ..
. ..
..
.
...
..
..
a�
w
2061
2060
2059
0 3 6 9 12 15 18
21
24 27
30 33 36 39 42 45 48
Distance (ft)
MYO-2019
MY1-2020
MY2-2021
MY3-2022
- - - Approx. Bankfull
Floodprone Area
3X Vertical Exa eration
Cross Section 9 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2061.77
2061.8
2061.9
2062.2
Bankfull Width (ft)'
5.6
5.4
6.0
5.0
Floodprone Width (ft)'
>36.7
>34.6
>32.2
>42.6
Bankfull Max Depth (ft)2
1.9
1.8
1.7
1.8
Low Bank Elevation (ft)
2061.77
2061.9
2031.8
2061.9
Bankfull Cross Sectional Area (ft2)2
5.5
5.5
5.0
4.2
Bankfull Entrenchment Ratio'
>6.6
>9.3
>5.4
1 >8.5
Bankfull Bank Height Ratio'
1.0
1.0
1.0
0.9
Upstream
Downstream
Carolina Bison - Reach UT1 - Cross Section 10 - Pool - (Restoration)
2066
2065
2064
c
° 2063
a�
w
2062
2061
2060
— — — —
.............................
— —
— —
— —
— —
— —
—
.....
— —
— —
.....
— — .
—
..
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 — — MY1-2020 MY2-2021 MY3-2022 — — — Approx. Bankfull • • • • Low Bank Height
3X Vertical Exaggeration
Cross Section 10 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2061.61
2061.7
2061.8
2061.9
Bankfull Width (ft)'
4.9
5.5
6.4
5.7
Floodprone Width (ft)'
-
-
-
Bankfull Max Depth (ft)2
1.0
0.9
0.8
0.8
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
3.0
3.0
2.5
2.1
Bankfull Entrenchment Ratio'
-
-
-
-
Bankfull Bank Height Ratio'
-
Upstream
Downstream
2054
Carolina Bison - Reach UT1 - Cross Section 11 - Riffle - (Restoration)
2053
2052
° 2051
M
>
°
w
2050
2048
0 3 6 9 12 15 18
21 24 27
Distance (ft)
30 33 36 39 42 45 48
MYO-2019
MY3-2022
• Low Bank Height
MY1-2020
- - - Approx. Bankfull
MY2-2021
Floodprone Area
3x vertical Exa eration
Cross Section 11 (Riffle)
MYO
MY1
MY2
MY3 I
MY5
MY7
MY,
Bankfull Elevation (ft) - Based on AB-XSA'
2049.23
2049.3
2049.3
2049.3
Bankfull Width (ft)'
6.2
8.8
7.6
7.1
Floodprone Width (ft)'
32.3
31.5
30.9
33.1
Bankfull Max Depth (ft)2
1.1
1.0
1.0
1.2
Low Bank Elevation (ft)
2049.23
2049.3
2049.2
2049.3
Bankfull Cross Sectional Area (ft2)2
4.4
4.4
4.0
4.2
Bankfull Entrenchment Ratio'
5.2
5.7
4.0
4.7
Bankfull Bank Height Ratio'
1.0
0.9
0.9
1.0
Upstream
Downstream
Carolina Bison - Reach UT1 - Cross Section 12 - Pool - (Restoration)
2053
2052
2051
c
°
2050
a�
w
2049
2048
2047
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 MY1-2020 MY2-2021 MY3-2022 — — — Approx. Bankfull • • • • Low Bank Height
3X Vertical Exa eration
Cross Section 12 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2048.85
2048.9
2048.9
2049.0
Bankfull Width (ft)'
6.3
6.9
6.9
7.3
Floodprone Width (ft)'
-
-
-
-
Bankfull Max Depth (ft)2
1.7
1.8
1.9
2.0
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
5.6
5.6
5.5
5.3
Bankfull Entrenchment Ratio'
-
-
Bankfull Bank Height Ratio'
-
Upstream
tv .�_ k - - ...r {
A as Y
Downstream
Carolina Bison- Reach UT1 - Cross Section 13 - Riffle - (Restoration)
2029
2028
2027
c
°
>
a�
w
2026
2025
.
..
...
..
.. .
..
..
..
..
2024
2023
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019
MY3-2022
L w Bank Hei ht
MY1-2020
- - - Approx. Bankfull
MY2-2021
Floodprone Area
3X Vertical Exaggeration
Cross Section 13 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MY,
Bankfull Elevation (ft) - Based on AB-XSA'
2025.13
2025.2
2025.47
2025.9
Bankfull Width (ft)'
6.8
7.4
8.2
10.0
Floodprone Width (ft)'
31.0
36.4
42.2
49.5
Bankfull Max Depth (ft)2
0.7
0.7
0.9
0.5
Low Bank Elevation (ft)
2025.13
2025.2
2025.6
2025.8
Bankfull Cross Sectional Area (ft2)2
3.2
3.2
4.9
1.9
Bankfull Entrenchment Ratio'
4.6
6.8
5.1
5.0
Bankfull Bank Height Ratio'
1.0
1.0
1.2
1 0.8
Upstream
Downstream
2029
Carolina Bison- Reach UT1 - Cross Section 14 - Pool - (Restoration)
2028
2027
°
>
w
2026
2025
..
2024
2023
0 3 6 9 12 15 18
21
24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 MY1-2020
MY2-2021
MY3-2022 — — — Approx. Bankfull • • • • Low Bank Height
3X Vertical Exaaaeratigj
Cross Section 14 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2025.24
2025.4
2025.635
2026.0
Bankfull Width (ft)'
7.7
8.8
12.4
11.6
Floodprone Width (ft)'
-
-
-
-
Bankfull Max Depth (ft)2
1.3
1.4
1.0
0.6
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
5.6
5.6
4.6
2.5
Bankfull Entrenchment Ratio'
- I
-
-
-
Bankfull Bank Height Ratio'
-
-
Upstream
Downstream
Carolina Bison- Reach PB2 - Cross Section 15 - Riffle - (Restoration)
2026
2025
2024
c
° 2023
w 2022
----
---
----
-
- -
--
-
- --
-
2021
2020
0 3 6 9 12 15 18
21
24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019
MY3-2022
• Low Bank Height
MY1-2020
- - - Approx. Bankfull
MY2-2021
Floodprone Area
3X Vertical Exaggeration
Cross Section 15 (Riffle)
MYO
MY1
MY2
MY3 I
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2021.87
2022.0
2022.1
2022.1
Bankfull Width (ft)'
10.0
10.4
10.1
11.3
Floodprone Width (ft)'
>49.7
>49.9
>50.1
>49.8
Bankfull Max Depth (ft)2
1.0
1.0
1.0
1.0
Low Bank Elevation (ft)
2021.87
2022.1
2022.073
2022.0
Bankfull Cross Sectional Area (ft2)2
6.9
6.9
6.5
5.9
Bankfull Entrenchment Ratio'
>5.0
>4.8
>5.0
>4.4
Bankfull Bank Height Ratio'
1.0
1.1
1.0
0.9
'. M
Upstream
Downstream
Carolina Bison - Reach PB2 - Cross Section 16 - Pool - (Restoration)
2025
2024
2023
C
° 2022
— —
— —
— .
—
— —
— —
—
—
— —
— —00
w
2021
2020
2019
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 MY1-2020 MY2-2021 MY3-2022 — — — Approx. Bankfull - - - - Low Bank Height
3X Vertical L= erat
Cross Section 16 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2021.94
2022.1
2022.25
2022.3
Bankfull Width (ft)'
9.6
10.3
9.8
11.1
Floodprone Width (ft)'
-
-
-
-
Bankfull Max Depth (ft)2
2.1
2.2
2.1
2.3
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
12.5
12.5
10.4
11.2
Bankfull Entrenchment Ratio'
-
I -
-
Bankfull Bank Height Ratio'
-
-
-
Upstream
Downstream
Carolina Bison- Reach PB2 - Cross Section 17 - Riffle - (Restoration)
2023
2022
2021
c
° 2020
16
°
LLJ
2019
•��
ter•
•��•��•
�•
�•�
•ter
�•
10
•��•
r•�.-.
�•
�•��•�
•�
2018
2017
0 3 6 9 12 15 18
21
24 27
30 33 36 39 42 45 48
Distance (ft)
MYO-2019
MY1-2020
MY2-2021
MY3-2022
- - - Approx. Bankfull
Flo prone Area
• Low Bank Height
3X Vertical Exaggeration
Cross Section 17 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2019.08
2019.2
2019.3
2019.3
Bankfull Width (ft)'
11.6
12.3
12.4
11.5
Floodprone Width (ft)'
>49.4
>48.9
>49.7
>49.5
Bankfull Max Depth (ft)2
1.0
1.0
1.0
1.2
Low Bank Elevation (ft)
2019.08
2019.1
2019.2
2019.2
Bankfull Cross Sectional Area (ft2)2
8.7
8.7
7.7
8.4
Bankfull Entrenchment Ratio'
>4.3
>4.1
>4.0
>4.3
Bankfull Bank Height Ratio'
1.0
0.9
0.9
1.0
tE �,
.
a
Upstream
Downstream
Carolina Bison- Reach P132 - Cross Section 18 - Pool - (Restoration)
2022
2021
2020
c
° 2019
...
————
.......
————
—
...........
—
———
...
———
..........................
——
..
>
°
w
2018
2017
2016
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 MY1-2020 MY2-2021 — MY3-2022 — — — Approx. Bankfull • • • • Low Bank Height
3X Vertical Exaggeration
Cross Section 18 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2018.77
2018.9
2018.9
2019.1
Bankfull Width (ft)'
7.9
8.2
8.9
10.2
Floodprone Width (ft)'
-
-
-
-
Bankfull Max Depth (ft)2
2.2
2.3
2.7
2.4
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
11.0
11.0
14.1
10.7
Bankfull Entrenchment Ratio'
-
Bankfull Bank Height Ratio'
-
Upstream
Downstream
Carolina Bison- Reach PB2 - Cross Section 19 - Pool - (Restoration)
2016
2015
OWL
2014
^
w
c
° 2013
- -
...
- -
......................
- -
- -
- -
- -
- -
- - -
........
- -
.....
.........
-
- - -
-
..
>
°
w
2012
2011
2010
0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48
Distance (ft)
MYO-2019 MY1-2020 MY2-2021 MY3-2022 — — — Approx. Bankfull • • • • Low Bank Height
3X Vertical Exaggeration
Cross Section 19 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2013.67
2014.0
2014.1
2013.7
Bankfull Width (ft)'
9.3
10.7
9.5
7.6
Floodprone Width (ft)'
-
-
-
-
Bankfull Max Depth (ft)2
2.9
3.0
2.7
2.9
Low Bank Elevation (ft)
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
14.7
14.7
11.6
13.3
Bankfull Entrenchment Ratio'
-
-
-
-
Bankfull Bank Height Ratio'
-
-
Upstream
Downstream
2017
Carolina Bison- Reach PB2 - Cross Section 20 - Riffle - (Restoration)
2016
2015
c
° 2014
M
...
.................L...
...
.....
...........
..
aTi
- -
- -
- -
- -
- -
- -
-"-L-
-
-
-
- -
-
- -
-
- - -
-
w
2013
2012
2011
0 3 6 9 12 15 18
21
24 27
30 33 36 39 42 45 48
Distance (ft)
MYO-2019
MY1-2020
MY2-2021
-MY3-2022
- -
- Approx. Bankfull
Floodprone Area
• Low Bank Height
3X Vertical Exa eration
Cross Section 20 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on AB-XSA'
2013.40
2013.6
2013.525
2013.5
Bankfull Width (ft)'
10.6
11.6
12.5
10.9
Floodprone Width (ft)t
>46.5
>45.9
>46.1
>47.5
Bankfull Max Depth (ft)2
1.6
1.5
1.5
1.7
Low Bank Elevation (ft)
2013.40
2013.6
2013.5
2013.6
Bankfull Cross Sectional Area (ft2)2
11.0
11.0
10.3
11.9
Bankfull Entrenchment Ratio'
>4.4
>4.3
>3.7
>4.4
Bankfull Bank Height Ratio'
1.0
1.0
1.0
1.0
Table 8. Baseline Stream Data Summary
Carolina Bison Mitigation Site - Reach PB1-A
Parameter
Gauge
Regional Curve
Pre -Existing Condition
Reference Reach(es) Data
Design
Monitoring Baseline
Dimension and Substrate - Riffle Only
LL
UL
Eq.
Min
Mean
Med
Max
SD
n
Min
Mean
Med
Max
SD
n
Min
Med
Max
Min
Mean
Med
Max
SD5
n
Bankfull Width (ft)
---
---
---
---
---
8.9
---
---
---
7.0
---
---
17.5
---
---
---
7.5
---
7.4
7.5
7.5
7.5
0.1
2
Floodprone Width (ft)
---
---
13.0
---
---
---
25.0
---
---
>30
---
---
---
30.0
---
36.4
43.2
43.2
49.9
9.5
2
Bankfull Mean Depth (ft)
---
---
---
---
---
0.8
---
---
---
1.0
---
---
1.6
---
---
---
1.0
---
---
---
---
---
---
---
'Bankfull Max Depth ft
---
---
1.5
---
---
---
1.2
---
---
2.5
---
---
---
1.3
---
0.9
1.1
1.1
1.3
0.3
2
Bankfull Cross Sectional Area(ft)
---
---
6.9
---
---
7.0
---
---
27.7
---
---
---
6.8
---
3.7
4.8
1 4.8
5.9
1 1.6
2
Width/Depth Ratio
11.6
---
---
7.0
11.1
---
7.3
---
---
---
---
---
Entrenchment Ratio
---
---
1.5
---
---
---
3.6
---
4.3
---
---
4.0
---
4.9
5.8
5.8
6.7
1.3
2
'Bank Height Ratio
2.4
---
---
1.8
---
---
1.0
---
1 1.0
---
1.0
1.0
1.0
1.0
0.0
2
Profile
Riffle Length (ft)
---
---
---
---
---
---
6
---
---
26
---
---
6
---
17
4.8
13.1
8.8
54.8
11.1
29
Riffle Slope (ft/ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
0.0008
0.0241
0.0211
0.0682
0.0146
29
Pool Length (ft)
---
---
---
---
---
---
3
---
---
16
---
---
3
---
6
1.4
11.7
12.5
27.3
6.4
27
Pool Max depth (ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
--
---
Pool Spacing (ft)
---
---
---
---
---
---
8
---
---
68
---
---
8
---
31
24.9
37.0
37.2
62.3
8.8
26
Pattern
Channel Beltwidth (ft)
---
---
---
---
---
---
20
---
---
85
---
---
20
---
30
---
---
---
---
---
Radius of Curvature ft
---
---
---
---
---
---
7
---
---
54
---
---
7
---
15
---
---
---
---
---
Rc:Bankfull width (ft/ft)
---
---
---
---
---
---
0.9
---
---
3.7
---
---
0.9
---
2.2
---
---
---
---
---
---
Meander Wavelength (ft)
---
---
---
---
---
---
33
---
---
105
---
---
33
---
49
---
---
---
---
---
---
Meander Width Ratio
---
---
---
--
---
---
4.7
---
7.2
---
---
4.7
7
---
---
---
---
---
---
Transport parameters
Reach Shear Stress (competency) Ible
---
---
---
Max part size (mm) mobilized at bankfull
Stream Power (transport capacity) W/mZ
---
---
Additional Reach Parameters
Rosgen Classification
C5
E4 / E4b
C4
C4
Bankfull Velocity (fps)
---
---
--
Bankfull Discharge (cfs)
---
---
--
Valley length (ft)
993
118 / 202
993
---
Channel Thalweg length (ft)
1079
148 / 230
1022
---
Sinuosity (ft)
1.09
1.25 / 1.14
1.03
---
Water Surface Slope (Channel) (ft/ft)
---
--
Channel slope (ft/ft)
0.0127
0.0210 / 0.0120
0.013
---
3 Bankfull Flood lain Area acres
---
---
---
---
4% of Reach with Eroding Banks
---
---
Channel Stability or Habitat Metric
---
I ---
Biological or Other
---
Shaded cells indicate that these will typically not be filled in.
1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2= For projects with a proximal USGS gauge in -line with the project reach (added bankfull verification - rare).
3. Utilizing XS measurement data produce an estimate of the bankroll floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope.
4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Ofvalue/needed only if the n exceeds 3
Table 8. Baseline Stream Data Summary
Carolina Bison Mitigation Site - Reach PB1-B
Parameter
Gauge
Regional Curve
Pre -Existing Condition
Reference Reach(es) Data
Design
Monitoring Baseline
Dimension and Substrate - Riffle Only
LL
UL
Eq.
Min
Mean
Med
Max
SD
n
Min
Mean
Med
Max
SD
n
Min
Med
Max
Min
Mean
Med
Max
SD
n
Bankfull Width (ft)
---
---
---
---
---
9.0
---
---
---
7.0
---
---
17.5
---
---
---
7.5
---
---
---
9.4
---
---
1
Floodprone Width (ft)
---
---
15.0
---
---
---
25.0
---
---
>30
---
---
---
30.0
---
---
---
42.4
---
---
1
Bankfull Mean Depth (ft)
---
---
---
---
---
1.0
---
---
---
1.0
---
---
1.6
---
---
---
1.0
---
---
---
---
---
---
---
'Bankfull Max Depth ft
---
---
1.2
---
---
---
1.2
---
---
2.5
---
---
---
1.3
---
---
---
1.8
---
---
1
Bankfull Cross Sectional Area(ft)
---
---
9.3
---
---
7.0
---
---
27.7
---
I ---
I ---
1 6.8
---
---
---
9.4
---
I ---
1
Width/Depth Ratio
8.6
---
---
7.0
---
---
11.1
---
---
7.3
---
---
---
---
---
I ---
---
Entrenchment Ratio
1.7
---
---
3.6
---
---
4.3
---
---
4.0
---
---
---
4.5
---
---
1
'Bank Height Ratio
4.8
---
---
1.8
---
---
1.0
---
1.0
---
---
---
1.0
---
---
1
Profile
Riffle Length (ft)
---
---
---
---
---
---
6
---
---
26
---
---
6
---
17
6.1
9.2
7.9
14.7
3.3
6
Riffle Slope (ft/ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
---
0.0156
0.0389
0.0381
0.0740
0.0211
6
Pool Length (ft)
---
---
---
---
---
---
3
---
---
16
---
---
3
---
6
1.5
13.1
10.7
30.9
10.6
6
Pool Max depth (ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
--
---
Pool Spacing (ft)
---
---
---
---
---
---
8
---
---
68
---
---
8
---
31
20.5
50.0
60.9
66.8
19.5
5
Pattern
Channel Beltwidth (ft)
---
---
---
---
---
---
20
---
---
85
---
---
20
---
30
---
---
---
---
---
---
Radius of Curvature ft
---
---
---
---
---
---
7
---
---
54
---
---
7
---
15
---
---
---
---
---
---
Rc:Bankfull width (ft/ft)
---
---
---
---
---
---
0.9
---
---
3.7
---
---
0.9
---
2.2
---
---
---
---
---
---
Meander Wavelength (ft)
---
---
---
---
---
---
33
---
---
105
---
---
33
---
49
---
---
---
---
---
---
Meander Width Ratio
---
---
---
---
---
---
4.7
---
---
7.2
---
---
4.7
---
7
---
---
---
---
---
---
Transport parameters
Reach Shear Stress (competency) Ible
---
---
Max part size (mm) mobilized at bankfull
--
Stream Power (transport capacity) W/mZ
---
---
Additional Reach Parameters
Rosgen Classification
E5
E4 / E4b
C4
C4
Bankfull Velocity (fps)
---
---
---
--
Bankfull Discharge (cfs)
---
---
--
Valley length (ft)
328
118 / 202
993
---
Channel Thalweg length (ft)
348
148 / 230
1022
---
Sinuosity (ft)
1.06
1.25 / 1.14
1.03
---
Water Surface Slope (Channel) (ft/ft)
---
--
Channel slope (ft/ft)
0.0139
0.0210 / 0.0120
0.013
---
3 Bankfull Flood lain Area acres
---
---
---
---
4% of Reach with Eroding Banks
---
---
Channel Stability or Habitat Metric
---
I ---
Biological or Other
---
I ---
Shaded cells indicate that these will typically not be filled in.
1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2= For projects with a proximal USGS gauge in -line with the project reach (added bankfull verification - rare).
3. Utilizing XS measurement data produce an estimate of the bankroll floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope.
4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Ofvalue/needed only if the n exceeds 3
Table 8. Baseline Stream Data Summary
Carolina Bison Mitigation Site - Reach PB1-C
Parameter
Gauge
Regional Curve
Pre -Existing Condition
Reference Reach(es) Data
Design
Monitoring Baseline
Dimension and Substrate - Riffle Only
LL
UL
Eq.
Min
Mean
Med
Max
SD
n
Min
Mean
Med
Max
SD
n
Min
Med
Max
Min
Mean
Med
Max
SD5
n
Bankfull Width (ft)
---
---
---
---
---
9.6
---
---
---
7.0
---
---
17.5
---
---
---
7.5
---
---
---
8.2
---
---
1
Floodprone Width (ft)
---
---
15.0
---
---
---
25.0
---
---
>30
---
---
---
30.0
---
---
---
34.6
---
---
1
Bankfull Mean Depth (ft)
---
---
---
---
---
1.2
---
---
---
1.0
---
---
1.6
---
---
---
1.0
---
---
---
---
---
---
---
'Bankfull Max Depth ft
---
---
1.7
---
---
---
1.2
---
---
2.5
---
---
---
1.3
---
---
---
1.0
---
---
1
Bankfull Cross Sectional Area(ft)
---
---
11.1
---
---
7.0
---
---
27.7
---
---
---
7.7
---
---
---
5.5
---
1
Width/Depth Ratio
8.3
7.0
---
---
11.1
---
---
7.3
---
---
---
---
---
Entrenchment Ratio
1.6
3.6
---
4.3
1.3
4.2
1
'Bank Height Ratio
3.0
---
---
1.8
1.0
1.0
1.0
---
1
Profile
Riffle Length (ft)
---
---
---
---
---
---
6
---
---
26
---
---
6
---
18
2.5
12.9
10.8
37.2
7.4
23
Riffle Slope (ft/ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
0.0003
0.0341
0.0257
0.0931
0.0253
23
Pool Length (ft)
---
---
---
---
---
---
3
---
---
16
---
---
3
---
12
5.2
13.8
12.5
36.3
7.5
24
Pool Max depth (ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
--
---
Pool Spacing (ft)
---
---
---
---
---
---
8
---
---
68
---
---
8
---
33
19.3
38.8
34.4
68.7
13.7
23
Pattern
Channel Beltwidth (ft)
---
---
---
---
---
---
20
---
---
85
---
---
21
---
32
---
---
---
---
---
Radius of Curvature ft
---
---
---
---
---
---
7
---
---
54
---
---
7
---
16
---
---
---
---
---
Rc:Bankfull width (ft/ft)
---
---
---
---
---
---
0.9
---
---
3.7
---
---
0.9
---
2.1
---
---
---
---
---
---
Meander Wavelength (ft)
---
---
---
---
---
---
33
---
---
105
---
---
35
---
53
---
---
---
---
---
---
Meander Width Ratio
---
---
---
--
---
---
4.7
---
7.2
---
---
4.4
---
6.5
--
---
---
---
---
---
Transport parameters
Reach Shear Stress (competency) Ible
---
---
---
Max part size (mm) mobilized at bankfull
Stream Power (transport capacity) W/mZ
---
---
Additional Reach Parameters
Rosgen Classification
E5
E4 / E4b
B4c
B4c
Bankfull Velocity (fps)
---
---
---
--
Bankfull Discharge (cfs)
---
---
--
Valley length (ft)
821
118 / 202
821
---
Channel Thalweg length (ft)
934
148 / 230
921
---
Sinuosity (ft)
1.14
1.25 / 1.14
1.12
---
Water Surface Slope (Channel) (ft/ft)
---
--
Channel slope (ft/ft)
0.0094
0.0210 / 0.0120
0.01
---
3 Bankfull Flood lain Area acres
---
---
---
---
4% of Reach with Eroding Banks
---
---
Channel Stability or Habitat Metric
---
I ---
Biological or Other
---
---
Shaded cells indicate that these will typically not be filled in.
1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2= For projects with a proximal USGS gauge in -line with the project reach (added bankfull verification - rare).
3. Utilizing XS measurement data produce an estimate of the bankroll floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope.
4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Ofvalue/needed only if the n exceeds 3
Table 8. Baseline Stream Data Summary
Carolina Bison Mitigation Site - Reach PB2
Parameter
Gauge
Regional Curve
Pre -Existing Condition
Reference Reach(es) Data
Design
Monitoring Baseline
Dimension and Substrate - Riffle Only
LL
UL
Eq.
Min
Mean
Med
Max
SD
n
Min
Mean
Med
Max
SD
n
Min
Med
Max
Min
Mean
Med
Max
SD5
n
Bankfull Width (ft)
---
---
---
---
---
8.6
---
---
---
7.0
---
---
17.5
---
---
---
10.6
---
10.0
10.7
10.6
11.6
0.8
3
Floodprone Width (ft)
---
---
17.0
---
---
---
25.0
---
---
>30
---
---
---
40.0
---
46.5
48.5
49.4
49.7
1.8
3
Bankfull Mean Depth (ft)
---
---
---
---
---
1.1
---
---
---
1.0
---
---
1.6
---
---
---
1.1
---
I ---
---
---
---
---
---
'Bankfull Max Depth ft
---
---
1.6
---
---
---
1.2
---
---
2.5
---
---
---
1.5
---
1.0
1.2
1.0
1.6
0.3
3
Bankfull Cross Sectional Area(ft)
---
---
9.4
---
---
7.0
---
---
27.7
---
---
---
11.5
---
6.9
8.9
1 8.7
11.0
1 2.1
3
Width/Depth Ratio
7.9
---
---
7.0
11.1
---
---
---
9.8
---
---
---
---
---
Entrenchment Ratio
---
---
2.0
---
---
---
3.6
---
4.3
---
3.8
---
4.3
4.6
4.4
5.0
0.4
3
'Bank Height Ratio
3.4
---
---
1.8
---
---
1.0
1 1.0
---
1.0
1.0
1.0
1.0
0.0
3
Profile
Riffle Length (ft)
---
---
---
---
---
---
6
---
---
26
---
---
4
---
19
5.3
15.8
11.3
46.2
10.7
19
Riffle Slope (ft/ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
---
0.0025
0.0325
0.0311
0.0826
0.0192
19
Pool Length (ft)
---
---
---
---
---
---
3
---
---
16
---
---
3
---
12
2.9
14.4
14.9
24.0
5.5
20
Pool Max depth (ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
--
---
Pool Spacing (ft)
---
---
---
---
---
---
8
---
---
68
---
---
19
---
50
25.4
45.7
45.0
89.0
17.8
19
Pattern
Channel Beltwidth (ft)
---
---
---
---
---
---
20
---
---
85
---
---
26
---
62
---
---
---
---
---
---
Radius of Curvature ft
---
---
---
---
---
---
7
---
---
54
---
---
10
---
39
---
---
---
---
---
---
Rc:Bankfull width (ft/ft)
---
---
---
---
---
---
0.9
---
---
3.7
---
---
1
---
5
---
---
---
---
---
---
Meander Wavelength (ft)
---
---
---
---
---
---
33
---
---
105
---
---
49
---
77
---
---
---
---
---
---
Meander Width Ratio
---
---
---
---
---
4.7
---
7.2
---
---
6
10
---
---
--
---
---
Transport parameters
Reach Shear Stress (competency) Ible
---
---
Max part size (mm) mobilized at bankfull
--
Stream Power (transport capacity) W/mZ
---
---
Additional Reach Parameters
Rosgen Classification
838
E4 / E4b
E4
E4
Bankfull Velocity (fps)
---
---
---
--
Bankfull Discharge (cfs)
---
---
--
Valley length (ft)
838
118 / 202
838
---
Channel Thalweg length (ft)
979
148 / 230
959
---
Sinuosity (ft)
1.17
1.25 / 1.14
1.14
---
Water Surface Slope (Channel) (ft/ft)
---
--
Channel slope (ft/ft)
0.0118
0.0210 / 0.0120
0.0100
---
3 Bankfull Flood lain Area acres
---
---
---
---
4% of Reach with Eroding Banks
---
---
Channel Stability or Habitat Metric
---
Biological or Other
---
I ---
Shaded cells indicate that these will typically not be filled in.
1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2= For projects with a proximal USGS gauge in -line with the project reach (added bankfull verification - rare).
3. Utilizing XS measurement data produce an estimate of the bankroll floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope.
4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Ofvalue/needed only if the n exceeds 3
Table 8. Baseline Stream Data Summary
Carolina Bison Mitigation Site - Reach UT1
Parameter
Gauge
Regional Curve
Pre -Existing Condition
Reference Reach(es) Data
Design
Monitoring Baseline
Dimension and Substrate - Riffle Only
LL
UL
Eq.
Min
Mean
Med
Max
SD
n
Min
Mean
Med
Max
SD
n
Min
Med
Max
Min
Mean
Med
Max
SD5
n
Bankfull Width (ft)
---
---
---
---
---
4.6
---
---
---
7.0
---
---
17.5
---
---
---
4.6
---
5.6
6.2
6.2
6.8
0.6
3
Floodprone Width (ft)
---
---
7.0
---
---
---
25.0
---
---
>30
---
---
---
30.0
---
31.0
33.3
32.3
36.7
3.0
3
Bankfull Mean Depth (ft)
---
---
---
---
---
0.8
---
---
---
1.0
---
---
1.6
---
---
---
0.6
---
---
---
---
---
---
---
'Bankfull Max Depth ft
---
---
0.9
---
---
---
1.2
---
---
2.5
---
---
---
0.7
---
0.7
1.2
1.1
1.9
0.6
3
Bankfull Cross Sectional Area(ft)
---
---
3.5
---
---
7.0
---
---
27.7
---
---
---
2.7
---
3.2
4.4
1 4.4
5.5
1 1.2
3
Width/Depth Ratio
6.0
---
---
7.0
11.1
---
8.0
---
---
---
--
---
---
Entrenchment Ratio
1.5
---
---
3.6
---
4.3
---
6.5
---
4.6
5.2
6.6
1.0
3
'Bank Hei ht Ratio
6.7
---
---
1.8
---
---
1.0
1.0
---
1.0
E5.5J
1.0
1.0
1 0.0
3
Profile
Riffle Length (ft)
---
---
---
---
---
---
6
---
---
26
---
---
4
---
11
2.3
7.9
6.1
35.6
6.1
73
Riffle Slope (ft/ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
0.0021
0.0393
0.0335
0.1209
0.0293
73
Pool Length (ft)
---
---
---
---
---
---
3
---
---
16
---
---
2
---
7
1.2
7.2
6.3
14.4
3.3
65
Pool Max depth (ft)
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
--
---
Pool Spacing (ft)
---
---
---
---
---
---
8
---
---
68
---
---
5
---
21
8.4
25.8
21.1
124.1
16.9
64
Pattern
Channel Beltwidth (ft)
---
---
---
---
---
---
20
---
---
85
---
---
13
---
20
---
---
---
---
---
---
Radius of Curvature ft
---
---
---
---
---
---
7
---
---
54
---
---
4
---
10
---
---
---
---
---
---
Rc:Bankfull width (ft/ft)
---
---
---
---
---
---
0.9
---
---
3.7
---
---
1
---
3
---
---
---
---
---
---
Meander Wavelength (ft)
---
---
---
---
---
---
33
---
---
105
---
---
22
---
32
---
---
---
---
---
---
Meander Width Ratio
---
---
---
---
---
4.7
---
---
7.2
---
---
7
---
11
---
---
Transport parameters
Reach Shear Stress (competency) Ible
---
---
---
Max part size (mm) mobilized at bankfull
Stream Power (transport capacity) W/mZ
---
---
Additional Reach Parameters
Rosgen Classification
E5/6b
E4 / E4b
E4
E4
Bankfull Velocity (fps)
---
---
--
Bankfull Discharge (cfs)
---
---
--
Valley length (ft)
1535
118 / 202
1535
---
Channel Thalweg length (ft)
1627
148 / 230
1748
---
Sinuosity (ft)
1.06
1.25 / 1.14
1.14
---
Water Surface Slope (Channel) (ft/ft)
---
--
Channel slope (ft/ft)
0.0238
0.0210 / 0.0120
0.022
---
3 Bankfull Flood lain Area acres
---
---
---
---
4% of Reach with Eroding Banks
---
---
Channel Stability or Habitat Metric
---
I ---
Biological or Other
---
Shaded cells indicate that these will typically not be filled in.
1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2= For projects with a proximal USGS gauge in -line with the project reach (added bankfull verification - rare).
3. Utilizing XS measurement data produce an estimate of the bankroll floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope.
4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Ofvalue/needed only if the n exceeds 3
Table 9. - Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters - Cross Sections)
Project Name/Number:
Carolina Bison
Cross Section 1 (Pool)
Cross Section 2 (Riffle)
I Cross Section 3 (Pool)
Cross Section 4 (Riffle)
Cross Section 5 (Riffle)
Base
MY]
MY2
MY3
MY5
MY7
MY+
Base
MY1
MY2
MY3
MY5
MY7
77.1
Base
MY1
MY2
MY3
MY5
MY7
MY+
Base
MY1
MY2
MY3
MY5
MY7
MY+
Base
MY1
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) -Based on ABASA
2051.91
2052.17
2052.1
2052.2
2052.01
2052.1
2052.2
2052.3
44.72
2044.6
2045.0
2044.5
2044.35
2044.3
2044.4
2044.4
2034.47
2034.6
2034.5
2034.7
Bankfull Width ft'
5.5
5.9
5.3
4.8
7.5
10.2
8.9
8.6
6.6
5.7
5.6
7.4
7.3
6.7
5.0
9.4
10.2
9.2
10.2
Flood tune Width ft
-
-
-
-
-
-
-
>49.9
>47.5
>49.2
>49.9
-
-
-
-
-
-
-
>36.4
>36.7
>37.0
>37.6
>42.4
>42.9
>42.8
>43.8
Bankfull Max Depth ft z
1.5
1.6
1.9
1 1.9
1
1
1.3
1 1.2
1.4
1.5
1
2.5
2.5
2.8
1 2.6
0.9
1 0.8
1.2
1.2
1
1.8
1.9
1 2.1
2.1
Low Bank Elevation (ft)
-
-
-
-
2052.0
2052.1
2052.3
2052.3
-
-
-
-
2044.35
2044.6
2044.7
2044.5
2034.47
2034.5
2034.6
2034.7
Bankfull Cross Sectional Area ft2 2
5.4
5.4
6.6
5.8
5.9
5.9
6.5
6.2
9.0
9.0
10.7
11.2
3.7
3.7
5.7
4.7
9.4
9.4
10.6
9.6
Bankfull Entrenchment Ratio'
-
-
-
-
>6.7
>4.9
>5.5
>5.8
-
-
-
-
>4.9
>6.9
>5.5
>7.6
>4.5
>4.9
>4.7
>4.3
Bankfull Bank Height Ratio'
1.0
1.0
1.0
1.0
1.0
1.2
1.3
1.2
1.0
1.0
1.1
1.0
Cross Section 6 (Pool)
Cross Section 7 (Riffle)
Cross Section 8 (Pool)
Cross Section 9 (Riffle)
Cross Section 10 (Pool)
Base
MYl
MY2
MY3
MY5
MY7
MY+
Base
MYl
MY2
MY3
MY5
MY7
MY+
Base
MYl
MY2
MY3
MY5
MY7
MY+
Base
MY1
MY2
MY3
MY5
MY7
MY+
Base
MYl
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on ABASA
2034.46
2034.53
2034.5
2034.7
2030.97
2031.07
2031.2
2031.1
2030.82
2030.9
2031.1
2031.0
2061.77
2061.8
2061.9
2062.2
2061.61
2061.7
2061.8
2061.9
Bankfull Width (ft)'
8.2
9.2
9.1
9.6
8.2
8.6
8.8
8.0
7.5
8.2
10.4
7.1
5.6
5.4
6.0
5.0
4.9
5.5
6.4
5.7
Flood rove Width ft '
-
-
-
-
-
-
>34.6
>35.8
>35.8
>37.7
-
-
-
-
>36.7
>34.6
>32.2
>42.6
-
-
-
-
Bankfull Max Depth ft z
1.6
1.6
1.8
1.5
1.0
1.1
1.2
1.3
2.3
2.4
2.4
2.4
1.9
1.8
1.7
1.8
1.0
0.9
0.8
0.8
Low Bank Elevation (ft)
-
-
-
-
2030.98
2031.2
2031.3
2031.1
-
-
-
-
2061.77
2061.86
2031.8
2061.9
-
-
-
-
Bankfull Cross Sectional Area (ft2)2
8.0
1 8.0
8.5
7.1
5.5
5.5
5.9
5.3
10.0
10.0
9.3
9.2
5.5
5.5
5.0
4.2
3.0
3.0
2.5
2.1
Bankfull Entrenchment Ratio'
-
-
-
-
>4.2
>5.8
>4.1
>4.7
-
-
-
-
>6.6
>9.3
>5.4
>8.5
-
-
-
-
Bankfull Bank Height Ratio'
1.0
1.0
1.0
1.0
1.0
1.0
1.0
0.9
Cross Section
MYl MY2
11 (Riffle)
MY3 MY5 MY7
MY+
Base
ross Section 12 (Pool)
MY1 MY2 MY3 MY5 MY7 MY+
Base
Cross Section 13 (Riffle)
MYl MY2 MY3 MY5 MY7
ross Section 14 (Pool)
MY1 MY2 MY3 MY5 MY7 MY+
Base
Cross Section 15 (Riffle)
MYl MY2 MY3 MY5 MY7
MY+
123204S.34
MY+
Base
Bankfull Elevation (ft) - Based on ABASA
2049.
2049.3
2049.3
2048.85
2048.8
2048.9
2049.0
2025.1
2025.2
2025.47
2025.9
2025.24
2025.36
2025.64
2026.0
2021.87
2021.98
2022.1
2022.1
Bankfull Width ft'
6.2
8.8
7.6
7.1
6.3
6.9
6.9
7.3
6.8
7.4
8.2
10.0
7.7
8.8
12.4
11.6
10.0
10.4
10.1
11.3
Floodprone Width ft '
32.3
31.5
30.9
33.1
-
-
-
-
31.0
36.4
42.2
49.5
-
-
-
-
>49.7
>49.9
>50.1
>49.8
Bankfull Max Depth ft z
1.1
1.0
1.0
1.2
1.7
1.8
1.9
2.0
0.7
0.7
0.9
0.5
1.3
1.4
1.0
0.6
1.0
1.0
1.0
1.0
Low Bank Elevation (ft)
2049.23
2049.267
2049.2
2049.3
-
-
-
-
2025.13
2025.2
2025.6
2025.8
-
-
-
-
2021.87
2022.1
2022.07
2022.0
Bankfull Cross Sectional Area ftz 2
4.4
4.4
4.0
4.2
5.6
5.6
5.5
5.3
3.2
3.2
4.9
1.9
5.6
5.6
4.6
2.5
6.9
6.9
6.5
5.9
Bankfull Entrenchment Ratio'
S.2
5.7
4.0
4.7
-
-
-
-
4.6
6.8
5.1
5.0
-
-
-
>5.0
>4.8
>5.0
>4.4
Bankfull Bank Height Ratio'
1.0
0.9
0.9
1.0
1.0
1.0
1.2
0.8
-
1.0
1.1
1.0
0.9
Cross Section 16 (Pool)
Cross Section 17
Riffle
Cross Section 18 (Pool)
Cross Section 19 (Pool)
Base MY1 MY2 MY3 MY5 MY7 MY+
Cross Section 20 (Riffle)
Base MYl MY2 MY3 MY5 MY7 MY+
Base
MY1
MY2
MY3
MY5
MY7
MY+
Base
MYl
MY2
MY3
MY5
MY7
MY+
Base
MYl
MY2
MY3
MY5
MY7
MY+
Bankfull Elevation (ft) - Based on ABASA
2021.94
2022.1
2022.25
2022.3
2019.08
2019.2
2019.3
2019.3
2018.77
2018.88
2018.9
2019.1
2013.67
2014.0
2014.1
2013.7
2013.4
2013.6
2013.53
2013.5
Bankfull Width ft'
9.6
10.3
9.8
11.1
11.6
12.3
12.4
11.5
7.9
8.2
8.9
10.2
9.3
10.7
9.5
7.6
10.6
11.6
12.5
10.9
Floodprone Width ft
>49.4
>48.9
>49.7
>49.5
>46.5
>45.9
>46.1
>47.5
Bankfull Max Depth JL
2.1
2.2
2.1
2.3
1
1
1.0
1 1.0
1.0
1 1.2
1
1 2.2
2.3
1 2.7
2.4
2.9
3.0
1 2.7
2.9
1.6
1 1.5
1.5
1.7
Low Bank Elevation (ft)
-
-
-
-
2019.08
2019.1
2019.2
2019.2
-
-
-
-
-
-
-
-
2013.4
2013.6
2013.5
2013.E
Bankfull Cross Sectional Area ft2
12.5
1 12.5
10.4
11.2
8.7
8.7
7.7
8.4
11.0
11.0
14.1
10.7
14.7
14.7
11.6
13.3
11.0
11.0
10.3
11.9
Bankfull Entrenchment Ratio'
>4.3
>4.1
>4.0
>4.3
-
-
-
-
-
-
-
-
>4.4
>4.3
>3.7
>4.4
Bankfull Bank Height Ratio'
1.0
0.9
0.9
1.0
1.0
1.0
1.0
1.0
1 - Uses the as -built cross sectional area as the basis for adjusting each subsequent years bankfull elevation
2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation
Appendix E
Hydrology Data
Table 10. 2023 Rainfall Summary
Month
Mik
Average
Normal Limits
Project Location
Precipitation*
30 Percent
70 Percent
September (2022)
3.39
2.18
4.08
3.28
October (2022)
2.37
1.30
2.89
1.39
November (2022)
2.73
1.70
3.29
2.31
December (2022)
3.26
2.23
3.89
2.63
January
3.27
2.38
3.85
3.98
February
2.95
2.21
3.46
3.70
March
3.73
2.86
4.33
4.20
April
3.60
2.71
4.20
4.06
May
3.92
3.00
4.55
4.78
June
4.19
3.26
4.84
2.59
July
4.29
3.22
5.01
4.15
August
3.72
2.40
4.47
5.00
Total Annual **
41.42
29.45
48.86
42.06
Above Normal
Limits
Below Normal
Limits
WETS Station: Asheville, NC. Approximately 10 miles from the site.
*Project Location Precipitation is a location -weighted average of surrounding gauged data retrieved by the
USACE Antecedent Precipitation Tool. Gauges used include Marshall.
**Total Annual represents the average total precipitation, annually, as calculated by the 30-year period.
Table 11. Documentation of Geomorphically Significant Flow Events
Year
Bankfull Events
Maximum Bankfull Height (ft)
Estimated Date of Highest Event
PBl-C Stage Recorder
MY1 2020
1
0.77
7/31/2020
MY2 2021
5
1.96
8/17/2021
MY3 2022
7
1.82
5/27/2022
MY4 2023
1
0.60
3/3/2023
PB2 Stage
Recorder
MY1 2020
3
1.16
7/31/2020
MY2 2021
2
1.50
8/17/2021
MY3 2022
3
1.06
5/27/2022
MY4 2023
2
0.52
3/3/2023
UT1 Stage
Recorder
MY1 2020
1
0.55
7/31/2020
MY2 2021
5
1.15
8/17/2021
MY3 2022
9
0.78
5/27/2022
MY4 2023
4
0.60
3/3/2023
4
K
2
1
2023 Carolina Bison PB1-C Stage Recorder Graph
o`tiry o`tiry o`ti�
Daily Precip (in) SR PB1-C Top of Bank
�o
o�
Date
�ryo h�ry" o�ry� ^�ryry
M.
5
4
3
c
2
1
n
a)
ca
Cn
5
4
3
FA
1
CI]
2023 Carolina Bison PB2 Stage Recorder Graph
�y
d`
;�CYNN
o�e
ag
eat°t
d°
Gaffe
I
ti
Daily Precip (in) —
^^`ryoryM o`�oryM
Date
SR PB2 Top of Bank
o`�ory�
^\ryory�
^`�oryM
\ryoryM
6
4
3
1
I
r-
r-
a)
c�
Cn
3
2
1
0
-1
ryf ,ryti otiti
Co�o Oo
� Daily Precip (in)
2023 Carolina Bison UT1 Stage Recorder Graph
SR UT1
Top of Bank
Date
`rye ev
14 If
I
�
5
4
3
c
PAI
1
Appendix F
Water Quality Data
Reach 13131-A
Season
Winter
Spring
Summer
Fall
Sampling Date
6-Dec-22
28-Mar-23
15-Aug-23
-
Physical
Temperature (°F)
47.5
54.5
68.9
-
Dissolved Oxygen (mg/L)
8.95
1.03
3.79
-
pH
7.96
7.57
6.9
-
Conductivity (VS/cm)
124
106.5
90.3
-
Nutrient/Bacteria
Fecal Coliform (CFU/100 ml)
2100
Total Nitrogen (mg/L)
1.1
Total Kjeldahal Nitrogen (mg/L)
ND
Nitrogen NO2 plus NO3 (mg/L)
0.84
Total Phosphorus(mg/L)
0.05
Biological
Total Taxa Richness
EPTTaxa Richness
EPT Abundance
Biotic Index
Seasonal Correction
# Taxa <_ 2.5 (intolerant taxa)
Bioclassification
Reach PB2
Season
Winter
Spring
Summer
Fall
Sampling Date
6-Dec-22
28-Mar-23
15-Aug-23
-
Physical
Temperature (°F)
45.2
56.3
73.5
-
Dissolved Oxygen (mg/L)
8.76
1.54
2.54
-
pH
7.66
7.61
7.16
-
Conductivity(µS/cm)
96.9
152.3
153.1
-
Nutrient/Bacteria
Fecal Coliform (CFU/100 ml)
1200
Total Nitrogen (mg/L)
1.2
Total Kjeldahal Nitrogen (mg/L)
ND
Nitrogen NO2 plus NO3 (mg/L)
0.75
Total Phosphorus (mg/L)
0.061
Biological
Total Taxa Richness
EPTTaxa Richness
EPT Abundance
Biotic Index
Seasonal Correction
# Taxa <_ 2.5 (intolerant taxa)
Bioclassification
Reach PB1-C
Season
I Winter
I Spring
I Summer
Fall
Sampling Date
I 6-Dec-22
28-Mar-23
15-Aug-23
-
Physical
Temperature (°F)
48.4
1 55.4
1 69.8
-
Dissolved Oxygen (mg/L)
3.29
1 0.13
2.59
-
pH
7.5
7.56
7.26
-
Conductivity (VS/cm)
116.4
113.8
121.3
-
Nutrient/Bacteria
Fecal Coliform (CFU/100 ml)
1300
Total Nitrogen (mg/L)
1.6
Total Kjeldahal Nitrogen (mg/L)
0.54
Nitrogen NO2 plus NO3 (mg/L)
1
Total Phosphorus (mg/L)
0.072
Biological
Total Taxa Richness
EPTTaxa Richness
EPT Abundance
Biotic Index
Seasonal Correction
p Taxa <_ 2.5 (intolerant taxa)
Bioclassification
Table 13. Physical Water Quality Summary
Carolina Bison Mitigation Site
Winter(12/06/2022)
Spring(03/28/2023)
Summer(08/15/2023)
Fall
Monitoring Year
Temp.
°F
DO
m L
pH
EC
cm
Temp.
°F
DO
m L
pH
EC
Ws/cm
Temp.
°F
DO
m L
pH
EC
S cm
Temp.
°F
DO
m L
pH
EC
(VS/cm)
Pre -construction (2019)
MY1 (2020)
68
2.5
7.41
107.4
MY2 (2021)
54.3
-
7.58
203
-
-
-
-
76.64
3.73
6.66
250
-
-
-
-
MY3 (2022)
44.96
7.85
7.43
129.3
65.3
1.79
6.75
114.3
73.3
3.7
6.77
230
60.3
6.68
6.79
124.1
r
MY4 (2023)
57.56
8.67
7.65
90.5
59
3.1
1 7.52
82.2
69.8
1.78
7.02
88.9
v
MY5 (2024)
MY6 (2025)
MY7 (2026)
Pre -construction (2019)
-
-
-
6.91
7.46
121.2
-
-
-
-
-
-
-
-
MY1(2020)
66.7
3.8
7.85
147.4
o
MY2 (2021)
56.1
7.79
156.4
-
-
-
75.2
3.31
6.97
240
-
-
-
F-
MY3 (2022)
66.4
8.11
7.2
109.4
74.3
3.45
6.83
199
59
6.37
6.94
244
L
MY4 (2023)
51.4
6.35
7.66
123.8
54.32
8.28
7.35
95.2
73.76
2.43
6.88
114.6
m
MYS (2024)
MY6 (2025)
MY7 (2026)
Pre -construction (2019)
MY1 (2020)
65.1
10.1
7.84
903
MY2 (2021)
57.7
8.08
168.2
-
-
-
74.66
5.1
7.2
251
-
-
-
a
MY3 (2022)
45.88
8.44
819
64.4
1.95
7.39
122.1
73.12
5.21
7
277
58.6
7.47
7.1
136.1
ma
MY4 (2023)
47.5
8.95
7.96
124
54.5
1.03
7.57
106.5
68.9
3.79
6.9
90.3
MYS (2024)
MY6 (2025)
MY7 (2026)
Pre -construction (2019)
-
-
-
7.86
7.49
122.8
-
MY1 (2020)
67.1
2
7.93
139.8
MY2 (2021)
58.4
7.85
203
-
-
-
73.04
3.91
7.18
794
-
-
-
-
MY3 (2022)
62.6
1.73
7.12
140.6
72.85
3.91
7.2
319
61
7.32
7.35
254
ma
MY4 (2023)
48.4
3.29
7.5
116.4
55.4
0.13
7.56
113.8
69.8
2.59
7.26
121.3
MYS (2024)
MY6 (2025)
MY7 (2026)
Pre -construction (2019)
-
7.46
7.71
123.5
-
-
-
-
-
-
-
MY1 (2020)
67.3
5.7
7.98
908
MY2 (2021)
57.3
-
8.19
148
-
-
77
3.81
6.95
783
-
-
-
-
m
MY3 (2022)
44.78
9.12
7.56
111.1
61.9
1.51
7.3
136.5
75.66
3.9
6.88
285
60.3
7.25
7.2
646
a
MY4 (2023)
45.2
8.76
7.66
1 96.9
56.3
1.54
7.61
152.3
73.5
2.54
7.16
153.1
MY5 (2024)
MY6 (2025)
MY7 (2026)
Table 14. Nutrient/Bacteria Water Quality Summary
Carolina Bison Mitigation Site
Spring
Monitoring Year
Fecal Coliform
(CFU/100 ml)
Total Nitrogen
(mg/L)
Total Kjeldahal
Nitrogen (mg/L)
Nitrogen NO2 plus
NO3 (mg/L)
Total Phosphorus
(mg/L)
Pre -construction (2019)
MY1 (2020)
-
-
?
MY2 (2021)
20
ND
ND
0.35
ND
MY3 (2022)
991
0.58
0.11
ND
0.24
L
MY4 (08/15/2023)
410
0.99
0.65
0.34
0.083
V
v
MY5 (2024)
MY6 (2025)
MY7 (2026)
Pre -construction (2019)
82
0.94
ND
0.52
ND
MYl (2020)
-
-
-
G
MY2 (2021)
-
-
-
MY3 (2022)
340
0.46
ND
0.23
ND
L
MY4 (08/15/2023)
1400
0.6
ND
0.3
ND
V
v
MY5 (2024)
MY6 (2025)
MY7 (2026)
Pre -construction (2019)
MY1 (2020)
-
-
-
MY2 (2021)
6800
1.2
ND
1.1
ND
a
MY3 (2022)
1800
ND
0.93
ND
a
MY4 (08/15/2023)
2100
1.1
ND
0.84
0.05
MY5 (2024)
MY6 (2025)
MY7 (2026)
Pre -construction (2019)
9900
2.8
1.2
1.7
0.24
MY1 (2020)
-
-
-
-
MY2 (2021)
-
-
-
-
y
MY3 (2022)
764
1.2
ND
1.2
ND
a
MY4 (08/15/2023)
1300
1.6
0.54
1
0.072
MY5 (2024)
MY6 (2025)
MY7 (2026)
Pre -construction (2019)
7700
2.8
1.4
1.4
0.22
MY1 (2020)
-
-
-
-
-
MY2 (2021)
140
6.0
ND
5.0
1.1
m
MY3 (2022)
540
1
ND
0.83
ND
a
MY4 (08/15/2023)
1200
1.2
ND
0.75
0.061
MY5 (2024)
MY6 (2025)
MY7 (2026)
Table 15. Biological Water Quality Summary
Carolina Bison Mitigation Site
Spring
Seasonal
# Taxa <_ 2.5
Monitoring Year
Total Taxa Richness
EPT Taxa Richness
EPT Abundance
Biotic Index
Bioclassification
Correction
(intolerant taxa)
'^
0
Pre -construction (2019)
17
5
8
5.13
1
Fair
r
MY3 (2022)
27
7
22
5.58
5
Good/Fair
MY5 (2024)
m
MY7 (2026)
Pre -construction (2019)
11
3
5
6.94
1
Poor
MY3 (2022)
33
17
75
5.55
6
Good/Fair
m
a
MY5 (2024)
MY7 (2026)
Pre -construction (2019)
19
5
16
5.63
3
Fair
m
MY3 (2022)
31
10
59
5.37
4
Good/Fair
a
MY5 (2024)
MY7 (2026)