HomeMy WebLinkAbout20201095 Ver 1_DoubleRock_MY0_Credit Release Request_20230901
September 1, 2023
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Brandon Romeo (bromeo@wildlandseng.com, 704.332.7754 x129)
Through: Wildlands Holdings VI, LLC
We formally request a credit release for the Double Rock Mitigation Bank Parcel (2020-1095v1)
for completion of Task 3 per the approved credit release schedule, which is included in the
Attachments with this request. The following documents have been submitted to DWR for Task 3
and are either pending review or have already been approved: As-Built & Baseline Monitoring
Report.
Credits requested for release are detailed below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration
10% 4,173.700 ft2
0.10 x 268,654.000 ft2 =
26,864.40 ft2 (- 22,691.70ft2
from tasks 1, 2, and 7)
Buffer Preservation
10% 278.210 ft2
0.10 x 17,910.2 ft2 =
1,971.020 ft2 (– 1,512.81ft2
from tasks 1, 2, and 7)
Buffer Enhancement
Generated Nitrogen Nutrient
Offset
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
Generated Nitrogen Nutrient
Offset
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
Signature:
Attachments:
1) Approved As-Built Project Credit Table
2) Approved UMBI Credit Release Schedule