Loading...
HomeMy WebLinkAbout20201095 Ver 1_DoubleRock_MY0_Credit Release Request_20230901 September 1, 2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Brandon Romeo (bromeo@wildlandseng.com, 704.332.7754 x129) Through: Wildlands Holdings VI, LLC We formally request a credit release for the Double Rock Mitigation Bank Parcel (2020-1095v1) for completion of Task 3 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task 3 and are either pending review or have already been approved: As-Built & Baseline Monitoring Report. Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 10% 4,173.700 ft2 0.10 x 268,654.000 ft2 = 26,864.40 ft2 (- 22,691.70ft2 from tasks 1, 2, and 7) Buffer Preservation 10% 278.210 ft2 0.10 x 17,910.2 ft2 = 1,971.020 ft2 (– 1,512.81ft2 from tasks 1, 2, and 7) Buffer Enhancement Generated Nitrogen Nutrient Offset Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Nitrogen Nutrient Offset Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: 1) Approved As-Built Project Credit Table 2) Approved UMBI Credit Release Schedule