Loading...
HomeMy WebLinkAboutWQ0044702_Sewer Extension Permit Request_20230906M INC. McDAVIDAsSOCUTES, INC. CORPORATE OFFICE Engineers • Planners • Land Surveyors (252) 753-2139 • Fax (252) 753-7220 E-mail: maigmcdavid-inc.com 3714 N. Main Street • P.O. Drawer 49 Farmville, NC 27828 NCDEQ/DWR Water Quality Section-PERCS Unit 512 N. Salisbury Street, Suite 925 Raleigh, NC 27604 Dear Sir or Madam: GOLDSBORO OFFICE Engineers • Planners (919) 736-7630 • Fax (919) 735-7351 E-mail: maigold0mcdavid-inc.com 109 E. Walnut Street • P.O. Box 1776 Goldsboro, NC 27533 August 25, LL U-10VED .�o SE a 6 , n " 3 NCDEQ/DWR/NPDES Subject: Sewer Extension Permit Request Contract No. 1 - Sanitary Sewer 2023 Blackwell Point Road Sewer Extension Bay River Metropolitan Sewerage District We are submitting the following sewer service extension application for Bay River MSD, 2023 Blackwell Point Road Sewer Extension. The purpose of this project is to supply a sewer service to 288 Blackwell Point Road. This project consists of the following: A. Approximately 1,325 LF of 2-inch PVC force main. B. 1 Low Pressure S.T.E.P. System. We are submitting the following in this application, and Cover Letter (Item B): (Item C) McDavid Associates, Inc. check #041436, dated August 25, 2023 in the amount of $480, payable to NC Department of Environmental Quality for the application fee. (Items A&D) Two (2) copies of the completed Alternative Sewer Extension (Form: ASEA-0416) Application. There are no wetlands or surface waters within 50 feet of the sewer system extension, wetland boundaries are shown on each page of the plans (Exhibit 1). 4. (Item F) Flow Tracking/Acceptance Form (Form FTSE 10-18) from Bay River Metropolitan Sewerage District (Exhibit 2). (Item G) Two (2) sets of plans "2023 Blackwell Point Road Sewer Extension, Contract No. 1 Sanitary Sewer," dated June 19, 2023, consisting of 10 pages, (MAI Plan File B-1910 GOLD). D805JWM23 1 3:57 PM BAY-RIVER-MSD-23-SEWER-EXTENSION-PERMIT-REQ-LTR-002.wpd 230825 6. (Item H) Two (2) sets of contract specifications for "2023 Blackwell Point Road Sewer Extension, Contract No. 1 Sanitary Sewer," dated June 19, 2023. One compact disc containing plans and specifications. 8. (Item I) Engineering Calculations. The calculations consist of the following: (1) Kentucky Pipe calculations for Low Pressure S.T.E.P. system (Exhibit 3). (2) Pump Cycle times and pump run times for LPSS Simplex S.T.E.P. System (Exhibit 4). (3) Force main velocities based on pipe type and flow and pump operating probabilities (Exhibit 5). (4) Flotation calculations for the LPSS Simplex S.T.E.P. Septic Tank (Exhibit 6). 9. (Item J) Downstream Sewer Evaluation (Exhibit 7). 10. (Item K) Two (2) color copies of a USGS Topographic Map and street level map showing the project area (Exhibit 8). 11. (Item M) The septic tank/pump well has a storage volume of approximately 398 gallons above the pump on level, which exceeds the average daily flow of 360 gallons per day, therefore it exceeds 24 hours of storage (Exhibit 9). 12. (Item N) A final environmental document is not applicable. Please review the documents and issue permit at your earliest convenience. If you have any questions please contact me. Sincerely, McDavid Associates, Imp. Jo eph W. McI ney, P.E. Farmville Office JWM/ljo Enclosures cc: Eric Harper, BRMSD (w/ Plans, Specifications, Exhibits) William Mahaney, Landowner D805JWM23 2 BAY-RIVER-MSD-23-SEWER-EXTENSION-PERMIT-REQ-LTR-002.wpd RA iL INC. 3:57 PM 230825