HomeMy WebLinkAbout3027 North Tryon Deveiopment - ReceiptROY COOPER
Governor
ELIZABETH S. BISER
Secretary
MARC RECKTENWALD
Director
Joel Albea
Embrey
1020 NE Loop 410, suite 700
San Antonio, TX 78209
d� SU7F a
pa .
NORTH CAROLINA
Environmental Quality
RECEIPT
August 29, 2023
Project: 3027 NORTH TRYON STREAM RESTORATION UT DERITA BRANCH
County: Mecklenburg
401 permit#: 2022-1197
404 permit#: 2022-01921
DIMS ID#: MR-08275
Amount Paid: $419,978.00
Check Number: 967
The NCDEQ Division of Mitigation Services (DMS) has received a check as indicated above as payment for the
compensatory mitigation requirements of the 401 Water Quality Certification/Section 404 Permit(s) issued for
the above -referenced project. This receipt serves as notification that your compensatory mitigation
requirements assigned to DMS associated with the authorized activity as specified below have been satisfied.
You must also comply with all other conditions of this certification and any other state, federal or local
government permits or authorization associated with this activity including G.S. § 143-214.11.
The DMS, by acceptance of this payment, acknowledges that the Division is responsible for the
compensatory mitigation requirements indicated below associated with the project permit and agrees to
provide the compensatory mitigation as specified in the permit. Mitigation responsibility assigned to the DMS
is nontransferable. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument
dated July 28, 2010.
Mitigation Location
Mitigation Type
Credits
Catawba 03 ESA
Warm Stream
650
Refunds of payments made to NCDMS are only approved under certain conditions. All refund requests must
be submitted in accordance with the Division's refund policy. If you have any questions or need additional
information, please contact Kelly.Williams@deq.nc.gov.
Sincerely,
/&ely �WiImP_�
ILF Program Coordinator
cc: Todd Tugwell, USACE - Raleigh; Samantha Dailey, USACE
Sheri Montalvo, NCDWR
Jonathan Hinkle, agent
Q.,North Carolina Department of Environmental Quality I Divislon of Mitigation Services
�}1Jj 217 West Jones Street 1 1652 Mali Service Center I Ratelgh. North Carolina 27699-1652
/� 919.707.8976
ROY COOPER "' s" ` n
Governor V - O
ELIZABETH S. BISER ,z.�� a2
Secretary�EowwvmE° `
RICHAM E. ROGERS, JR. NORTH CAROLINA
Director Environmental Quality
COMPENSATORY MITIGATION RESPONSIBILITY TRANSFER FORM
May 15, 2023
Permittee: Embrey Partners LLC DWR Project #20221197v2
Project Name: 3027 North Tryon St Development
County: Mecklenburg
The Division has received an acceptance letter from the NC Division of Mitigation Services (DMS) to
satisfy the mitigation requirements set forth in 401 Individual Certification No. WQC005269 issued to
Embrey Partners LLC, dated May 15, 2023 as provided in the table below.
Compensatory Mitigation
River and 8-digit HUC Number
Perennial Stream
650 linear feet (credits)
Catawba / 03050103
Expanded service area
The Permittee must provide a copy of this form to DMS who will then sign the form to verify receipt of
payment and the transfer of the mitigation responsibility. Once DMS has signed this form, it is the
Permittee's responsibility to ensure that a signed copy of this form is submitted to the Division before
conducting any of the authorized impacts.
The Division of Mitigation Services verifies that the mitigation requirements (credits) shown above will
be debited using approved released or advance credits, and for all stream or wetland credits is in
accordance with the signed/approved In -Lieu Fee Instrument dated July 28, 2010. By signing below,
DMS is accepting full responsibility for the identified mitigation. As a reminder to the Mitigation
Provider, no more than 25 percent of the total mitigation required by Division can be met through
preservation, unless requested and approved by the Division Director (15A NCAC 02H. 0506(c)(7)).
Signature Authority Name (print):
Signature:
Kelly Williams- NCDMS
V'EmU��M.
IWA
Date: 29 August 2023
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611
NORTH CAROLINA (J1(�.'�O'�.(�OQO
pepmfinent of En,k,wenW Oual�
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitigation Responsibility Transfer Form
Permittee: Embry Partners, LLC (Attn: Mr. Joel Albea) Action ID: SAW-2022-01921
Project Name: 3027 N Tryon Street Development County: Mecklenburg
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements
Permitted Impacts Requiring Mitigation*: 8-digit HUC and Basin: 03050103, Catawba River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non Riparian
Coastal
650
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03050103 Expanded Service Area
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
650
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name: NCDMS
Name of Sponsor's Authorized Representative: Kelly Williams
A i
29 August 2023
Signature of Sponsor's Authorized Representative Date of Signature
Page 1 of 2 Form Updated 31 January, 2020
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios maybe applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions:
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to:1) the Permittee, 2) the USACE
Project Manager at the address below, and 3) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite
105, Wake Forest, NC 27587 (or by email to kimberly.d.browning@usace.army.mil or todd.tugwell@usace.army. mil).
Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: Samantha Dailey
USACE Field Office: Charlotte Regulatory Field Office
US Army Corps of Engineers
8430 University Executive Park Drive, Suite 615
Charlotte, North Carolina 28262
Email: Samantha.J.Dailey@usace.army.mil
Mav 25. 2023
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil.
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at http://regulatory.usacesurvey.com/ to complete the survey online.