Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6230806_Supplement-EZ Form_20230905
3UPPLEMENT-EZ COVER PAGE FORM5LOADEC I ROJECT INFORMATION 1 Project Name _ Brookwood Subdivision Phase 4 2 P 'ect Area - 55.46 3 Coastal Wetland Area(ao)._ 0 4 Surface Water Area(ac) - 0 _5 Is this project High or Low Density? Low 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) ,t 7 Width of vegetated setbacks provided ifeet} 8 Will the vegetated setback remain vegetated? 9 if BUA is proposed in the setback,does it meet NCAC 02H.100314)1c-dr WA 10 Is streambank stabilization proposed on this project? NO UMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Storm water Wetland f 15 Permeable Pavement 16 I Sand Filter I- _ _ _ 17 Rainwater Harvesting(RWH) _ Y 18 Green Roof_ I 19 iLevelSpreader-Filter Strip(LS-FS) 20 _Disconnected Impervious Su_rface_iDISj 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 !Silva CeN 25 .Silva 266 Filterra I RAMS WADE!? SIGNER CERTIFICATION 27 Name and Title: Jackson D.Maples Project Manager 28 _Organization. LKC Engineering, PLLC 29 Street address: 140 Aqua Shed Ct. _ 30- City.State,Zip: Aberdeen NC,28315 31 Phone number(s): 910-420-1437 32 Email jackson©Ikcengineering.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision that the information provided In the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here ,1p111 I111IIg, Designer %.�l�1 f A i,,t., s T- a SEAL � 7 _ = 056498 = Sign a of Desi CO y-',�C� �GINe���v Date ll Seal DRAINAGE AREAS 1 ,Is this a high density project? No 2 If so,number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes _ 4 If so.number of low density drainage areas 1 Is alllpart of this project subject to previous rule 5 versions? No iORMSIOADt0 INAGE AREA INFORMATION Entire Site LD 1 4 Type of SCM T _ 5 Total drainage area(sq ft) 2,511.233 2,511233 6 Onsite drainage area(sq ft) 2,420,193 2,420,193 7 Offslte drainage area(sq ft) 91,040 91040 8 Total BUA in project(sq ft) 289674 sf 289674 st New BUA on subdivided lots(subject to permitting) 9 (sq ft) _ 181209 sf 181209 sf New BUA not on subdivided lots(subject to 0 permitting)(st) __ 81021 sf 81021 sf 1 Otfsite BUA(sq ft) 27442 sf 27442 sf 2 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) _ -Sidewalk(sq ft) -Roof(sq fl) 181209 sf 181209 sf _ -Roadway(sq fly - 81021 sf 81021 sf -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 3 subdivided lots(sq ft) New infiltrating permeable pavement not on 4 subdivided lots ft)_ Existing BUA that will remain(not subject to 5 permitting)(sq ft) 6 Existing BUA that is already permitted(sq ft) 7 Existing BUA that will be removed(sq ft) 8 Percent BUA 12% 12% 9 Design storm(inches) 6.5 in 6.5 in !0 Design volume of SCM{cu ft) Calculation method for design volume bDI ONAL INFORMATION -14111111101111- -- Please use this space to provide any additional information about the !2 drainage area(s): he site will use conveyance swales for runoff from the roadway and spersed flow for the individual lots. LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS MOM 02H.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flov✓T Yes 3 _Has the use of piping been minimized per.1003(2)(c)? Yes 4 _Side slopes of the vegetated conveyances(H:V) .3 sf 5 _Maximum velocity in the vegetated conveyances during the 10-year storm? 4.35 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s)(%) NIA 8 Bottom width of curb outlet swale(s)(feet) NIA 9 Maximum side slope of curb outlet swale(s)(H:V) N/A 10 Minimum length of curb outlet swale(s)(feet) N/A 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to nile.1003 proposed? No ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project: Swale Drainage DUA Pervious 0 V v Slope ,.,, ,,,,,,, Flow depth Area (so) area (cfa) (X) (fps) (fps) (It) (act (ac) 2 3 4 5 5 7 — - 8 9 10 !1 12 13 14 _15 18 17 18 19 20 21 22 23 24 26 26 27 28 29 30