HomeMy WebLinkAbout2023-01131_NWP29_CopyU.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action ID. 2023-01131 County: Watauga
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Grandfather Golf & Country Club / Attn: Rebekah Wood
Address: P.O. Box 368
Linville, NC 28646
Telephone Number:828-898-4541
Location description: The site is located at 225 Chestnut Road, in the Grandfather Golf & Country Club development, in
Linville, NC. Coordinates are: 36.108388 -81.842346
Description of projects area and activity: This permit authorizes installation of two driveway culverts to access a residential lot.
Permanent impacts authorized total 40 linear feet of stream channel (0.003 acre) for culverts and 80 linear feet of temporary
stream impacts (0.006 acre) associated with dewatering. In-stream work should be avoided between October 15 and April 15
to avoid potential impacts to downstream trout spawning.
Applicable Law: Section 404 (Clean Water Act, 33 USC 1344)
Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: NWP #29
SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions, above noted special conditions, and your submitted application and attached information dated June 5, 2023 and
revised August 1, 2023. Any violation of the attached conditions or deviation from your submitted plans may subject the
permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide/regional authorization is modified,
suspended or revoked. If, prior to the expiration date identified below, the nationwide/regional permit authorization is reissued and/or
modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the
modified nationwide/regional permit. If the nationwide/regional permit authorization expires or is suspended, revoked, or is modified,
such that the activity would no longer comply with the terms and conditions of the nationwide/regional permit, activities which have
commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide/regionalpermit, will remain
authorized provided the activity is completed within twelve months of the date of the nationwide/regional permit’s expiration,
modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the
authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 828-296-4500) to determine Section 401 requirements.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact Amanda Jones at 828-271-7980, ext. 4225 or amanda.jones@usace.army.mil.
Corps Regulatory Official: ___________________________ Date: August 30, 2023
Amanda Jones
Expiration Date of Verification: March 15, 2026
288888888-----------2727227272727272272721-7980, ext.42
_________________________________
Ammmmmmmmmmmmmananaanaaananaaaada Jones
CESAW-RG-A «Permit_No»
Determination of Jurisdiction:
A. There are waters, including wetlands, on the above described project area that may be subject to Section 404 of the Clean
Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part
331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further
instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an
approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work
in waters of the United States and prior to any work that could alter the hydrology of waters of the United States.
B. There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
C. There are waters, including wetlands, within the above described project area that are subject to the permit requirements of
Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
D. The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued . Action ID: SAW- .
Basis for Determination:
See attached preliminary jurisdictional determination form.
Remarks:
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps’ Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B
and C above).
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Phillip Shannin, Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by Not Applicable.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official: ______________________________________
Amanda Jones
CESAW-RG-A «Permit_No»
Issue Date of JD: August 30, 2023 Expiration Date of JD: N/A Preliminary JD
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey located at:
https://regulatory.ops.usace.army.mil/customer-service-survey/
Copy furnished:
Interface Environmental Consulting, LLC / Attn: Sarah Kilby (via email)
CESAW-RG-A «Permit_No»
Action ID Number: 2023-01131 County: Watauga
Permittee: Grandfather Golf & Country Club / Attn: Rebekah Wood
Project Name: 225 Chestnut Road Driveway / NWP #29
Date Verification Issued: August 28, 2023
Project Manager: Amanda Jones
Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this
certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn.: Amanda Jones
151 Patton Avenue, Room 208
Asheville, North Carolina 28801-5006
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the
Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or
initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in accordance with
the terms and condition of the said permit, and required mitigation was completed in accordance with the permit
conditions.
_______________________________________ ______________________
Signature of Permittee Date
CESAW-RG-A «Permit_No»
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Grandfather Golf & Country Club / Attn:
Rebekah Wood
File Number: SAW-2023-01131 Date: August 30, 2023
Attached is: See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A
PROFFERED PERMIT (Standard Permit or Letter of permission) B
PERMIT DENIAL C
APPROVED JURISDICTIONAL DETERMINATION D
PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx
or Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
x ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
x OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the
permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal
the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the
permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit
having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer
will send you a proffered permit for your reconsideration, as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
x ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
x APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you
may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of
this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer
within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information.
x ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of
this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
x APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by
the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary
JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the
Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the
JD.
CESAW-RG-A «Permit_No»
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record
of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the
administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may
provide additional information to clarify the location of information that is already in the administrative record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
appeal process you may contact:
District Engineer, Wilmington Regulatory Division, Attn.:
Amanda Jones
151 Patton Avenue, Room 208
Asheville, North Carolina 28801-5006
828-271-7980, ext. 4232
If you only have questions regarding the appeal process you may
also contact:
Mr. Phillip Shannin, Administrative Appeal Review Officer
CESAD-PDO
U.S. Army Corps of Engineers, South Atlantic Division
60 Forsyth Street, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
________________________________________
Signature of appellant or agent.
Date: Telephone number:
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn.: Amanda Jones, 69 Darlington Avenue, Wilmington, North Carolina
28403
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM
BACKGROUND INFORMATION
A.REPORT COMPLETION DATE FOR PJD:
B.NAME AND ADDRESS OF PERSON REQUESTING PJD:
C.DISTRICT OFFICE, FILE NAME, AND NUMBER:
D.PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
(USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR
AQUATIC RESOURCES AT DIFFERENT SITES)
State: County/parish/borough: City:
Center coordinates of site (lat/long in degree decimal format):
Lat.:Long.:
Universal Transverse Mercator:
Name of nearest waterbody:
E.REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
Office (Desk) Determination. Date:
Field Determination. Date(s):
TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH “MAY BE”SUBJECT TO REGULATORY
JURISDICTION.
Site
number
Latitude
(decimal
degrees)
Longitude
(decimal
degrees)
Estimated amount
of aquatic resource
in review area
(acreage and linear
feet, if applicable)
Type of aquatic
resource (i.e., wetland
vs. non-wetland
waters)
Geographic authority
to which the aquatic
resource “may be”
subject (i.e., Section
404 or Section 10/404)
08/30/2023
Grandfather Golf & Country Club / Attn: Rebekah
Wood, P.O. Box 368, Linville, NC 28646
CESAW-RG-A / AID: 2023-01131 / 225 Chestnut Road
PJD
July 26, 2023
1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in
the review area, and the requestor of this PJD is hereby advised of his or her option
to request and obtain an approved JD (AJD) for that review area based on an
informed decision after having discussed the various types of JDs and their
characteristics and circumstances when they may be appropriate.
2) In any circumstance where a permit applicant obtains an individual permit, or a
Nationwide General Permit (NWP) or other general permit verification requiring “pre-
construction notification” (PCN), or requests verification for a non-reporting NWP or
other general permit, and the permit applicant has not requested an AJD for the
activity, the permit applicant is hereby made aware that: (1) the permit applicant has
elected to seek a permit authorization based on a PJD, which does not make an
official determination of jurisdictional aquatic resources; (2) the applicant has the
option to request an AJD before accepting the terms and conditions of the permit
authorization, and that basing a permit authorization on an AJD could possibly result
in less compensatory mitigation being required or different special conditions; (3) the
applicant has the right to request an individual permit rather than accepting the terms
and conditions of the NWP or other general permit authorization; (4) the applicant can
accept a permit authorization and thereby agree to comply with all the terms and
conditions of that permit, including whatever mitigation requirements the Corps has
determined to be necessary; (5) undertaking any activity in reliance upon the subject
permit authorization without requesting an AJD constitutes the applicant’s acceptance
of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered
individual permit) or undertaking any activity in reliance on any form of Corps permit
authorization based on a PJD constitutes agreement that all aquatic resources in the
review area affected in any way by that activity will be treated as jurisdictional, and
waives any challenge to such jurisdiction in any administrative or judicial compliance
or enforcement action, or in any administrative appeal or in any Federal court; and (7)
whether the applicant elects to use either an AJD or a PJD, the JD will be processed
as soon as practicable. Further, an AJD, a proffered individual permit (and all terms
and conditions contained therein), or individual permit denial can be administratively
appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it
becomes appropriate to make an official determination whether geographic
jurisdiction exists over aquatic resources in the review area, or to provide an official
delineation of jurisdictional aquatic resources in the review area, the Corps will
provide an AJD to accomplish that result, as soon as is practicable. This PJD finds
that there “may be” waters of the U.S. and/or that there “may be”navigable waters of
the U.S. on the subject review area, and identifies all aquatic features in the review
area that could be affected by the proposed activity, based on the following
information:
SUPPORTING DATA. Data reviewed for PJD (check all that apply)
Checked items should be included in subject file. Appropriately reference sources
below where indicated for all checked items:
Maps, plans, plots or plat submitted by or on behalf of the PJD requestor:
Map: ________________.
Data sheets prepared/submitted by or on behalf of the PJD requestor.
Office concurs with data sheets/delineation report.
Office does not concur with data sheets/delineation report. Rationale: _______.
Data sheets prepared by the Corps: ________.
Corps navigable waters’ study: ____________.
U.S. Geological Survey Hydrologic Atlas: ________.
USGS NHD data.
USGS 8 and 12 digit HUC maps.
U.S. Geological Survey map(s). Cite scale & quad name: _________.
Natural Resources Conservation Service Soil Survey. Citation: __________.
National wetlands inventory map(s). Cite name: ________.
State/local wetland inventory map(s): ____________.
FEMA/FIRM maps: ________________.
100-year Floodplain Elevation is: ____.(National Geodetic Vertical Datum of 1929)
Photographs: Aerial (Name & Date): ______.
or Other (Name & Date): ______.
Previous determination(s). File no. and date of response letter: __________.
Other information (please specify): ______________.
IMPORTANT NOTE: The information recorded on this form has not necessarily
been verified by the Corps and should not be relied upon for later jurisdictional
determinations.
Signature and date of Signature and date of
Regulatory staff member person requesting PJD
completing PJD (REQUIRED, unless obtaining
the signature is impracticable)
1
1 Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond
within the established time frame, the district may presume concurrence and no additional follow up is
necessary prior to finalizing an action.
ureaaaaaaaaaaaannnnnndnnnnnn date of
X
186700004108
FLOW
FLOW
LEGEND
SUBJECT PROPERTY BOUNDARY
10' PROPERTY BOUNDARY BUFFER
STREAM TOP OF BANK
APPROXIMATION
25' TROUT BUFFER
ROADS
2' CONTOURS
10' CONTOURS
EPHEMERAL
CHANNELS/DRAINAGES
WETLAND
Sheet
1/1
CH
E
C
K
E
D
B
Y
:
DR
A
W
N
B
Y
:
DA
T
E
:
SD
K
No
.
DA
T
E
B
Y
RE
V
I
S
I
O
N
S
07
/
1
1
/
2
0
2
3
MC
C