Loading...
HomeMy WebLinkAboutRE_ SAW-2019-00195Baker, Caroline D From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Friday, June 9, 2023 3:41 PM To: Wesley Smith Cc: Thomas, Zachary T Subject: [External] RE: SAW-2019-00195 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thanks for the update, Wesley. Yes, the Corps is amenable to your extension request to Friday, 6/16/2023. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Wesley Smith <wesley.smith@lennar.com> Sent: Friday, June 9, 2023 3:37 PM To: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Cc: Zachary T Thomas <zachary.thomas@ncdenr.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: SAW-2019-00195 Hi David, I apologize. The engineer got as builts ready early this week but did not include the needed information (linear feet of impact). After more delays from the engineer there was some confusion with the numbers. They are telling me they should have everything presentable by early next week. I am formally asking for another extension to next Friday (06-16- 2023), just in case any other complications pop up. Again I apologize for the delay. Thank you, Wesley Smith, CPESC Division Environmental Manager —Raleigh Lennar Carolinas, LLC 1100 Perimeter Park Dr. Suite 112 Morrisville, NC 27560 Mobile: (919) 608-7567 wesley.smith@lennar.com www.lennar.com From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Sent: Monday, June 5, 2023 9:41 AM To: Wesley Smith <wesley.smith@lennar.com> Cc: Zachary T Thomas <zachary.thomas@ncdenr.gov> Subject: RE: SAW-2019-00195 Hi Wesley and thanks for the email. Yes, the Corps is amenable to your time extension request. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bailey2(a)-usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://urldefense.com/v3/ https://regulatory.ops.usace.army.mil/customer-service- survey/;!!No0KQ4w!odmiK2C9UVbp9U7p1BazRIG7sfaZD9vS689BrzunsrfgEV1dyLJ6MLo- 5K1 OWAnCTLipEppxZuquzUiiNS347fi-mNOaCUo6xc4$ Thank you for taking the time to visit this site and complete the survey. -----Original Message ----- From: Wesley Smith <wesley.smith(c-)_lennar.com> Sent: Friday, June 2, 2023 3:24 PM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2(a)-usace.army.mil> Cc: Zachary T Thomas <zachary.thomas(u-)_ncdenr.gov> Subject: [Non-DoD Source] SAW-2019-00195 Hi David, I would like to formally request an extension on the non compliance issue for the Ridgemoor community until next Friday (06-09-2023). Our engineer needs more time to get the as builts ready. Please let me know if this is acceptable or if you have any questions. Thank you, Wesley Smith, CPESC Division Environmental Manager - Raleigh Lennar Carolinas, LLC 1100 Perimeter Park Drive Suite 112 Morrisville, NC 27560 Mobile: (919) 608-7567 wesley.smith(a-)-lennar.com Blockedhttp://www.lennar.com