HomeMy WebLinkAboutSAW-2023-01365 nwp 18 _pjdv2U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2023-01365 County: Stan ly U.S.G.S. Quad: NC -Stanfield GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Helms Development Prortis LLC Steve Helms Address: 9669 Fred Road Stanfield, NC 28163 Telephone Number: 704-634-6623 E-mail: hehnsbuild(&aol.com Size (acres) 23 Nearest Town Stanfield Nearest Waterway Rock Hole Creek River Basin Upper Pee Dec USGS HUC 03040105 Coordinates Latitude: 35.21387 Longitude:-80.45840 Location description: Project is located northeast of the intersection of Polk Ford Road and Renee Ford Road in Stanfield, Stanly County, North Carolina. PIN: 556301453992 Description of projects area and activity: This verification authorizes: 1) Permanent impact of 50 Linear Feet to intermittent tributary 1 for a culvert. 2) Permanent impact of 30 Linear Feet to intermittent tributary 1 for a Riprap dissipator Pad 3) Permanent impact of 62 Linear Feet to Perennial tributary 1 for a culvert. 4) Permanent impact of 30 Linear Fee to Perennial tributary 1 for a riprap dissipator pad. Applicable Law(s): © Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 18: Minor Discharges SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 6/1/2023, and the enclosed plans Lake Glen Subdivision dated 5/19/2023. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Krystynka B Stygar at 919-801-8990or richard.t!.harmonOusace.army.mil. Corps Regulatory Official: /1664� 5ti,/,�a� Date: 07/11/2023 Expiration Date of Verification: 3/14/2026 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: Wetlands and Waters, Inc Perry Isner Address: 328 East Broad Street Suite D Statesville, NC 28677 Telephone Number: 704-773-4239 E-mail: perryisner(&wetlands-waters.com Action ID Number: SAW-2023-01365 County: Stanly Permittee: Helms Development Prprtis LLC, Steve Helms Project Name: Lake Glenn S/D Date Verification Issued: 07/11/2023 Project Manager: Krystynka B Stygar Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Krystynka B Stygar Charlotte Regulatory Office U.S Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 or richard.g.harmon@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date A. Determination of Jurisdiction: 1. ® There are waters on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 3. ❑ There are waters within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 4. A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. 5. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued DATE. Action ID: FILE NUMBER. B. Basis For Determination: See the preliminary jurisdictional determination form dated 7/14/2023. C. Remarks: See approximate aquatic resource map labeled, "Lake Glen" D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Philip Shannin, Appeal Review Officer 60 Forsyth Street SW, Room M9 Atlanta, Georgia 30303-8801 Phone: (404) 562-5136 AND philip.a. shanninkusace.army.mil In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Corps Regulatory Official: Krvstvnka BMv2ar Date of JD: 7/14/2023 Expiration Date of JD: Not auulicable The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at https://regWatoiy.ops.usace.amy.mil/customer-service-siinLey/. Copy furnished: NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Helms Development Prprtis LLC, File Number: SAW-2023-01365 Date: 7/14/2023 Steve Helms Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of permission) B ❑ PERMIT DENIAL WITHOUT PREJUDICE C ❑ PERMIT DENIAL WITH PREJUDICE D ❑ APPROVED JURISDICTIONAL DETERMINATION E ❑x PRELIMINARY JURISDICTIONAL DETERMINATION F SECTION I The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at https://www.usace.army.mil/Missions/Civil-Works/Regulatory- Program-and-Permits/appeals/ or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C. PERMIT DENIAL WITHOUT PREJUDICE: Not appealable You received a permit denial without prejudice because a required Federal, state, and/or local authorization and/or certification has been denied for activities which also require a Department of the Army permit before final action has been taken on the Army permit application. The permit denial without prejudice is not appealable. There is no prejudice to the right of the applicant to reinstate processing of the Army permit application if subsequent approval is received from the appropriate Federal, state, and/or local agency on a previously denied authorization and/or certification. D: PERMIT DENIAL WITH PREJUDICE: You may appeal the permit denial You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information for reconsideration • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. • RECONSIDERATION: You may request that the district engineer reconsider the approved JD by submitting new information or data to the district engineer within 60 days of the date of this notice. The district will determine whether the information submitted qualifies as new information or data that justifies reconsideration of the approved JD. A reconsideration request does not initiate the appeal process. You may submit a request for appeal to the division engineer to preserve your appeal rights while the district is determining whether the submitted information qualifies for a reconsideration. F: PRELIMINARY JURISDICTIONAL DETERMINATION: Not appealable You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision you If you have questions regarding the appeal process, may contact: or to submit your request for appeal, you may District Engineer, Wilmington Regulatory Division contact: Attn: Krystynka B Stygar Philip Shannin Charlotte Regulatory Office Regulatory Appeals Review Officer U.S Army Corps of Engineers South Atlantic Division 8430 University Executive Park Drive, Suite 615 60 Forsyth St SW, Floor M9 Charlotte, North Carolina 28262 Atlanta, Georgia 30303-8803 Phil ip.A.Shannin2a-usace.army.mi1 404-562-5136 SECTION II — REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. Use additional pages as necessary. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation and will have the opportunity to participate in all site investigations. Signature of appellant or agent. Date: Email address of appellant and/or agent: Telephone number: PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 07/11/2023 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Helms Development Prprtis LLC, Steve Helms, 9669 Fred Road, Stanfield, NC 28163 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Lake Glenn S/D , SAW- 2023-01365 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Project is located northeast of the intersection of Polk Ford Road and Renee Ford Road in Stanfield, Stanly County, North Carolina. PIN: 556301453992 (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Stanly City: Stanfield Center coordinates of site (lat/long in degree decimal format): Latitude: 35.21387 Longitude:-80.45840 Universal Transverse Mercator: Name of nearest waterbody: Rock Hole Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ® Office (Desk) Determination. Date: July 13, 2023 ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAYBE" SUBJECT TO REGULATORY JURISDICTION Site Number Latitude Longitude Estimated Type of aquatic Geographic authority to (decimal (decimal amount of resources (i.e., which the aquatic degrees) degrees) aquatic wetland vs. resource "may be" resources in non -wetland subject (i.e., Section 404 review area waters) or Section 10/404) (acreage and linear feet, if applicable Tributary 1(int) 35.21384123 -80.45863478 420 LF Non -wetland Section 404 waters Tributary 1 (per) 35.21461932 -80.45672329 630 LF Non -wetland Section 404 waters Tributary 1A 35.21435339 -80.45749044 140 If Non -wetland Section 404 waters Tributary 2 35.21344718 -80.45889586 50 LF Non -wetland Section 404 waters Tributary 3 35.21419805 -80.45818296 440 LF Non -wetland Section 404 waters Tributary 4 35.21365620 -80.45764429 340 LF Non -wetland Section 404 waters Wetland 1000 35.21428134 -80.45859700 0.04 acres Wetland Section 404 Wetland 2000 35.21361987 -80.45766725 0.02 acres Wetland Section 404 1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AID constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items are included in the administrative record and are appropriately cited: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: ®Data sheets prepared/submitted by or on behalf of the PJD requestor. Datasheets: ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑Data sheets prepared by the Corps: ❑Corps navigable waters' study: ❑U.S. Geological Survey Hydrologic Atlas: ❑USGS NHD data: ❑USGS 8 and 12 digit HUC maps: ® U.S. Geological Survey map(s). Cite scale & quad name: ®Natural Resources Conservation Service Soil Survey. Citation: ❑ National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: ® Photographs: ❑ Aerial (Name & Date): (National Geodetic Vertical Datum of 1929) or ® Other (Name & Date): Site Photographs El Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later iurisdictional determinations. /1 Signa e and date of Regulatory staff member completing PJD 7/14/2023 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action.