Loading...
HomeMy WebLinkAboutNCC202050_NOT Closeout Documents_20230901 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 Fayetteville Outer Loop,Lines 90 and 5 County: Cumberland Project: Relocation River basin: Cape Fear Person financially responsible:Piedmont Natural Gas-Dave Vena Project#: CUMBE-2020-169 NCC202050 Address: PO Box 33068,Charlotte,NC 28233 1. Project Location: See Plans,Fayetteville Pictures: No 2. Weather and soil conditions: dry,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Stephen Williams,Reed Chandler Title: Lead EHS Professional,Project Manager Inspection report: Sent Report Date given/sent: August 31,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: August 24,2023 Time arriving on site: 9:00 AM Time leaving site: 9:40 AM CC: