Loading...
HomeMy WebLinkAbout[External] RE Second Request for Additional Information, Bethel Park Stream Restoration Project, Burke County (DWR #20230566)1 Winston, Joey From:Win Taylor <wtaylor@wildlandseng.com> Sent:Friday, September 1, 2023 12:45 PM To:Winston, Joey Cc:Brandee.C.Boggs@usace.army.mil; Leslie, Andrea J Subject:[External] RE: Second Request for Additional Information, Bethel Park Stream Restoration Project, Burke County (DWR #20230566) Attachments:DWQ Comment Response.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message  button located on your Outlook menu bar on the Home tab.    Joey,    I have aƩached a comment response document that presents your addiƟonal informaƟon request (comment) and then  a response that speaks to the comment and where it is addressed in the plan sheets.  This should help you locate the  perƟnent informaƟon within the plan sheets.  The file size of the plan sheets is too large to email, so I’ll send you a  Onedrive link to access these. Please let me know if you have any addiƟonal needs and/or quesƟons.  Have a great  holiday weekend.    Thanks, Win    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .     Win Taylor PWS, FPC |  Senior Environmental Scientist  O: 843.277.6221  x102  M: 843.412.6314     Wildlands Engineering, Inc.  497 Bramson Ct, Suite 104  Mount Pleasant, SC 29464  From: Winston, Joey <joey.winston@deq.nc.gov>   Sent: Tuesday, August 29, 2023 12:24 PM  To: Win Taylor <wtaylor@wildlandseng.com>  Cc: Brandee.C.Boggs@usace.army.mil; Leslie, Andrea J <andrea.leslie@ncwildlife.org>  Subject: Second Request for Additional Information, Bethel Park Stream Restoration Project, Burke County (DWR  #20230566)    Mr. Taylor,    On April 24, 2023, the Division of Water Resources (Division) received your applicaƟon requesƟng a 401 Water Quality  CerƟficaƟon from the Division for the subject project. AddiƟonal informaƟon was received on July 5, 2023. The Division  has determined that your applicaƟon is incomplete and cannot be processed. The applicaƟon is on‐hold unƟl all of the  following informaƟon is received:     1. The PCN idenƟfies 0.013 acres of wetland impacts, but wetland impacts are not idenƟfied on the plans. From  looking at the PJD, it seems like the wetland impact would be to Wetland B since it’s 0.013 acres in size. Wetland  B is not idenƟfied on the plans either, only Wetland A marked as “Protect ExisƟng Wetlands”. Please confirm  whether wetland impacts are sƟll proposed. If so, please include them on the project plans. [15A NCAC 02H  .0502(a)(4); 15A NCAC 02H .0502(a)(9)]  2   2. The Division requires that all work in or adjacent to streams be conducted so that the flowing stream does not  come in contact with the disturbed area. The PCN indicates that most of the work will be conducted off‐line  before streamflow is diverted into the new channels. What are the plans for any in‐channel work to prevent  streamflow from reaching disturbed areas (such as a pump around system or other diversion structure)? Please  include any details and notes in the plans, as necessary. [15A NCAC 02H .0502(a)(4); 15A NCAC 02H .0502(a)(9);  15A NCAC 02H .0506(b)(2)]    3. The PCN says “redesigning an exisƟng culvert” is part of the project and the plans show “Proposed Bridge and  Culvert Crossing” on sheets 1.1.3 and 1.2.3. Will culverts be installed as part of the project or will exisƟng  structures be replaced with bridges? If culverts are proposed for the project, then please indicate the size of the  impact, and include a detail for the culverts. The Division requires that culverts be buried to allow low flow  passage of water and aquaƟc life. The culvert should be buried by 20% of the pipe’s diameter for culverts 48  inches or less and by one foot for culverts greater than 48 inches. [15A NCAC 02H .0502(a)(4); 15A NCAC 02H  .0502(a)(9)]    4. The PCN and PJD idenƟfy impacts to two jurisdicƟonal ditches and one jurisdicƟonal swale, but these features or  impacts are not shown on the plans. Please confirm whether impacts are sƟll proposed and include these  features on plans. [15A NCAC 02H .0502(a)(4); 15A NCAC 02H .0502(a)(9)]    Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested informaƟon for the  proper consideraƟon of the applicaƟon. Please provide your response by September 29, 2023. If all of the requested  informaƟon is not received, the Division will be unable to approve the applicaƟon and it will be denied as incomplete.  The denial of this project will necessitate reapplicaƟon to the Division for approval, including a complete applicaƟon  package and appropriate fee.    Please let me know if you have any quesƟons.    Regards,  Joey    Joey Winston  Environmental Specialist II, Division of Water Resources  North Carolina Department of Environmental Quality   Office: (828) 296‐4685 | Cell: (828) 785‐9171   NEW: joey.winston@deq.nc.gov   DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th.   Employee email addresses may look different, but email performance will not be impacted.        Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.