Loading...
HomeMy WebLinkAbout16357-Bethel Park_90%plans_31August2023Site Bethel Park Restoration Morganton, North Carolina for City of Morganton Title Sheet 0.1 Legend 0.2 General Notes and Sequence 0.3 Project Overview 0.4 Demolition Plan 1.0 - 1.4 East Prong Hunting Creek Plan and Profile 2.1.1 - 2.1.5 Fiddlers Run Plan and Profile 2.2.1 - 2.2.4 Grading Plan 3.0 - 3.4 Park Drainage Plan 4.0 - 4.4 Erosion & Sediment Control Plan - Phase 1 - Perimeter Control 5.0 - 5.4 Erosion & Sediment Control Plan - Phase 2 - Stream Construction 5.5 - 5.9 Erosion & Sediment Control Plan - Phase 3 - Park Improvements 5.10- 5.14 Planting Tables 6.0 Planting Plan 6.1 - 6.4 Details 7.1 - 7.6 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y 90% Plans August 31, 2023 N X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - C o v e r . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 0. 1 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Ti t l e S h e e t Engineering: Wildlands Engineering, Inc 497 Bramson Ct, Suite 104 Mount Pleasant, SC 29464 (843) 814-3308 Geoff Smith, PE Sheet Index Project Directory Vicinity Map Not to Scale Owner: City of Morganton 305 E. Union St. Suite A100 Morganton, NC 28655 Attn: Rob Winkler (828) 438-5278 rwinkler@morgantonnc.gov Site Coordinates Latitude 35° 44' 26.52" Longitude -81° 39' 38.52" Address: 600 Bethel Road, Morganton, NC 28655 BEFORE YOU DIG! IT'S THE LAW! CALL 1-800-632-4949 N.C. ONE-CALL CENTER Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - G e n e r a l N o t e s a n d S y m b o l s . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 0. 2 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Le g e n d Legend Existing Thalweg Existing Property Line Existing Major Contour Existing Minor Contour Existing Overhead Electric Existing Underground Electric Existing Sanitary Sewer Existing Water Line Existing Fence Existing Asphalt Walking Trail Existing Wetland Existing Tree Existing Disc Golf Hole Existing Bridge (To Be Removed) Existing Culvert Existing Parking Lot CE CE CE 10+00 OHE OHE 100100 SS SS SS Existing Features Proposed Features Erosion Control Features Proposed Various Constructed Riffles Per Plans See Details 1-3, Sheet 7.1 Proposed Crayfish Glide See Detail 4, Sheet 7.1 Proposed Boulder Toe See Detail 1 & 2, Sheet 7.2 Proposed Brush Toe See Detail 3, Sheet 7.2 Proposed Log Sill See Detail 1, Sheet 7.3 Proposed Log J-Hook See Detail 3 Sheet 7.3 Proposed W-Weir See Detail 4, Sheet 7.3 Proposed Park Access Proposed Structures Proposed Temporary Silt Fence See Detail 1, Sheet 7.4 Proposed Temporary Stream Crossing - Timber Mat See Detail 3, Sheet 7.4 Proposed Temporary Stream Crossing - Culvert See Detail 4, Sheet 7.4 Proposed Channel Plug See Detail 2, Sheet 7.5 Proposed Turbidity Curtain See Detail 3, Sheet 7.5 Proposed Check Dam See Detail 3, Sheet 7.6 Proposed Stockpile Area Proposed Staging/Stockpile Area Proposed Limits of Disturbance Proposed Thalweg Alignment Proposed Bankfull Proposed Major Contour Proposed Minor Contour Proposed Conservation Easement Proposed Asphalt Walking Trail (By Others) X X X LOD LOD [X][X] T C Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - G e n e r a l N o t e s a n d S y m b o l s . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 0. 3 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Ge n e r a l N o t e s a n d S e q u e n c e Projection SITE SURVEY AND DESIGN WERE COMPLETED USING THE NORTH CAROLINA COORDINATE SYSTEM. HORIZONTAL DATUM: NAD 1983 NORTH CAROLINA STATE PLANES VERTICAL DATUM: NAVD 1988 UNIT: US FOOT 1.THE CONTRACTOR SHALL CONTACT NORTH CAROLINA 811 PRIOR TO SITE MOBILIZATION. 2.PRIOR TO SITE MOBILIZATION, THE CONTRACTOR SHALL DOCUMENT THE CONDITION OF ON-SITE ACCESS POINTS AND EXISTING PARK INFRASTRUCTURE (E.G., PARK SIGNAGE, GATES, PARKING LOTS, ETC.) VIA VIDEO OR STILL PHOTOGRAPHY AND PROVIDE TO THE ENGINEER OF RECORD. PRIOR TO DEMOBILIZATION ACTIVITIES, ACCESS POINTS MUST BE RESTORED, AT A MINIMUM, TO EXISTING SITE CONDITIONS. 3.PRIOR TO SITE MOBILIZATION, THE CONTRACTOR SHALL ERECT SIGNAGE DESIGNATING BETHEL PARK AS A CONSTRUCTION ZONE WITH TYPICAL WORK HOURS DISPLAYED. 4.SET UP TEMPORARY FACILITIES, IF APPLICABLE, AND MOBILIZE EQUIPMENT AND MATERIALS TO THE SITE. 5.INSTALL PERIMETER ESC MEASURES (PHASE 1) AS SHOWN ON THE PLANS AND IN THE ORDER LISTED IN THE ESC SEQUENCE INCLUDING STAGING AND STOCKPILE AREAS, SILT FENCE, TURBIDITY CURTAINS, AND TEMPORARY STREAM CROSSINGS. INDIVIDUAL TREE PROTECTION FENCING MAY BE ADDED IN THE FIELD AT THE DISCRETION OF THE ENGINEER OF RECORD. 6.PLACE ANY IMPORTED MATERIALS WITHIN THE LIMITS OF PROTECTED STOCKPILE AREAS AS SHOWN IN THE ESC PLANS. 7.FOLLOWING INSTALLATION OF ESC MEASURES, CONDUCT DEMOLITION OF EXISTING SITE FEATURES AS SHOWN IN THE PLANS. PHASE I - STREAM RESTORATION AND FLOODPLAIN BENCH EXCAVATION 8.ENSURE THAT PHASE 1 OF THE ESC SEQUENCE IS IMPLEMENTED AND IS FUNCTIONING PROPERLY BEFORE ANY CLEARING OR GRUBBING ACTIVITIES COMMENCE. 9.CLEAR ALL TREES, EXCEPT FOR THOSE MARKED BY THE ENGINEER, FROM THE PROPOSED STREAM CORRIDOR OF FIDDLERS RUN. STOCKPILE ALL TREES ON SITE WITHIN ANY ESTABLISHED, PROTECTED, AND APPROVED STOCKPILE AREA(S). 10.HARVEST REUSABLE SUBSTRATE FROM THE EXISTING CHANNEL AS DIRECTED BY THE ENGINEER OF RECORD AND STOCKPILE WITHIN ANY APPROVED AND PROTECTED STOCKPILE AREA(S). 11.PERFORM EXCAVATION AND GRADING OF FIDDLERS RUN OFFLINE OF THE EXISTING CHANNEL FROM APPROXIMATE STATION 201+00 TO 210+00 AND FROM STATION 211+00 TO THE PROPOSED CONFLUENCE WITH EAST PRONG HUNTING CREEK. FLOW WILL BE MAINTAINED IN THE EXISTING CHANNEL. 12.SEED AND MAT STREAM BANKS AND FLOODPLAIN AREAS ACCORDING TO THE PLANS AND SPECIFICATIONS. 13.PLACE ALL EXCAVATED MATERIAL IN DESIGNATED AND PROTECTED STOCKPILE AREAS. THE CONTRACTOR WILL ENSURE THAT ESC PRACTICES ARE PROPERLY FUNCTIONING IN STOCKPILE AREAS AS SHOWN ON THE ESC PLAN SHEETS. 14.TIE THE NEWLY EXCAVATED CHANNEL INTO THE EXISTING CHANNEL AT THE SOUTHERN AND NORTHERN EXTENTS OF FIDDLERS RUN. UTILIZE A PUMP AROUND TO WORK IN DRY CONDITIONS. 15.RELOCATE THE INSTALLED SILT FENCE AS DEFINED IN PHASE 2 OF THE ESC SEQUENCE TO FACILITATE FLOODPLAIN GRADING AND FILLING THE EXISTING CHANNEL WITH THE RECENTLY EXCAVATED MATERIAL. ANY EXCESS FILL MATERIAL WILL BE STORED IN THE APPROVED STOCKPILE AREA(S). IF ADDITIONAL FILL MATERIAL IS NEEDED, THE CONTRACTOR MAY BEGIN CLEARING AND OFFLINE CHANNEL EXCAVATION AT THE UPSTREAM EXTENT OF EAST PRONG HUNTING CREEK. 16.FILLING THE ABANDONED CHANNEL SHOULD INCLUDE INSTALLING CHANNEL PLUGS AS NOTED IN THE PLANS AND SPECIFICATIONS. 17.CLEARING AND GRUBBING ACTIVITIES ALONG EAST PRONG HUNTING CREEK MAY NOT COMMENCE UNTIL PHASE 1 OF THE ESC SEQUENCE HAS BEEN IMPLEMENTED AND APPROVED BY THE ENGINEER OF RECORD. 18.CLEAR ALL TREES, EXCEPT FOR THOSE MARKED BY THE ENGINEER, NECESSARY TO FACILITATE CHANNEL CONSTRUCTION AND GRADING AT THE UPSTREAM EXTENT OF EAST PRONG HUNTING CREEK AS SHOWN ON THE PLANS. STOCKPILE ALL TREES AND BRUSH IN APPROVED AND PROTECTED STOCKPILE AREA(S) OR AS DIRECTED BY THE ENGINEER. 19.PERFORM EXCAVATION AND GRADING OF EAST PRONG HUNTING CREEK OFFLINE OF THE EXISTING CHANNEL FROM APPROXIMATE STATION 101+00 TO 110+00. FLOW WILL BE MAINTAINED IN THE EXISTING CHANNEL. STOCKPILE EXCAVATED MATERIAL WITHIN ANY OF THE APPROVED AND PROTECTED STOCKPILE AREA(S). 20.TIE THE NEW CHANNEL INTO THE EXISTING CHANNEL AT THE SOUTHERN EXTENT OF THE PARK AND DOWNSTREAM OF STATION 110+00. UTILIZE A PUMP AROUND TO WORK IN DRY CONDITIONS. 21.FILL THE EXISTING CHANNEL AND GRADE THE FLOODPLAIN BENCH TO THE GRADES SHOWN ON THE PLANS CONCURRENTLY. THE INSTALLED SILT FENCE ALONG THE WEST BANK OF EAST PRONG HUNTING CREEK MAY BE RELOCATED AS DEFINED IN PHASE 2 OF THE ESC SEQUENCE. 22.UTILIZE A PUMP AROUND TO EXCAVATE THE PROPOSED STREAM WHILE FILLING THE OLD CHANNEL CONCURRENTLY UNTIL APPROXIMATE STATION 118+00. THE CONSTRUCTED CHANNEL MUST BE TIED INTO THE EXISTING CHANNEL AND STABILIZED AT THE END OF EACH WORKDAY TO FACILITATE FLOW THROUGH EAST PRONG HUNTING CREEK AT ALL TIMES. 23.WHEN THE NEW CHANNEL IS TIED INTO THE EXISTING CHANNEL AT STATION 118+00, EXCAVATE THE REMAINDER OF EAST PRONG HUNTING CREEK TO THE CONFLUENCE WITH FIDDLERS RUN. UPON COMPLETION, FILL BOTH OF THE EXISTING CHANNELS AND ALLOW BOTH STREAMS TO FLOW THROUGH THE NEWLY CONSTRUCTED CHANNELS. 24.WHEN EAST PRONG HUNTING CREEK STREAM GRADING IS COMPLETE, THE PROPOSED BRIDGE CROSSING MAY BE INSTALLED. THE CONTRACTOR MUST ENSURE THAT FLOW WILL BE MAINTAINED THROUGH OR AROUND EAST PRONG HUNTING CREEK THROUGHOUT THE DURATION OF THE BRIDGE INSTALLATION. 25.GRADE ANY REMAINING EXTENTS OF THE FLOODPLAIN BENCH AS SHOWN ON THE PLANS. ANY EXCESS MATERIAL WILL BE STORED IN ANY OF THE APPROVED STOCKPILE AREA(S). 26.ONCE ALL PHASES OF CHANNEL AND FLOODPLAIN BENCH GRADING ARE COMPLETE, PREPARE THE FLOODPLAIN BENCH FOR PLANTING PER THE SPECIFICATIONS. 27.APPLY PERMANENT SEED AND PLANT VEGETATION ALONG THE STREAM BANKS AND IN THE FLOODPLAIN BENCH PER THE PLANS AND SPECIFICATIONS. PHASE II - INTERIOR PARK GRADING 28.GRADE THE PROPOSED WALKING TRAIL LOOP AND CONNECTING TRAILS TO THE ELEVATIONS SHOWN ON THE PLANS. 29.TRANSPORT EXCESS FILL MATERIAL FROM THE STOCKPILE AREA(S) TO THE STOCKPILE AREA AT THE SOUTHERN EXTENT OF THE PARK TO FACILITATE GRADING SOUTH OF THE PROPOSED WALKING TRAIL AS SHOWN ON THE PLANS. 30.COMPLETE FINAL GRADING WITHIN THE PROPOSED WALKING TRAIL FROM THE SOUTHERN EXTENT AND THE NORTHERN EXTENT CONCURRENTLY. 31.INSTALL THE DRAINPIPES IN THE PARK AT THE LOCATIONS AND ELEVATIONS SPECIFIED IN THE PLANS. FOLLOWING PIPE INSTALLATION, RETURN ANY DISTURBED TRAIL TO THE PROPOSED GRADE IN THE PLANS. 32.UPON REACHING FINAL GRADE, TRANSPORT ANY EXCESS FILL MATERIAL OUT OF THE INTERIOR OF THE PARK, IF NECESSARY. 33.PLANT THE REMAINDER OF THE AREAS IN THE PARK PER THE PLANS AND SPECIFICATIONS. 34.ONCE PERMANENT SEED IS ESTABLISHED, MINIMUM 70% COVERAGE IS ACHIEVED, AND THE ENGINEER OF RECORD APPROVES, REMOVE ANY REMAINING TEMPORARY STREAM CROSSINGS, STOCKPILE AREAS, AND ESC PRACTICES. NO ESC PRACTICES SHALL BE REMOVED WITHOUT PRIOR APPROVAL FROM THE ENGINEER OF RECORD. 35.THE CONTRACTOR SHALL REMOVE ALL TRASH, DEBRIS, AND ANY LEFTOVER CONSTRUCTION MATERIALS PRIOR TO DEMOBILIZATION. 36.DEMOBILIZE EQUIPMENT FROM THE SITE. 37.DEMOBILIZE ALL EQUIPMENT, OFFICES, BUILDINGS, AND OTHER TEMPORARY FACILITIES ASSEMBLED ON SITE. Construction Sequence General Notes PHASE 1 - PERIMETER CONTROL 1.INSTALL TURBIDITY CURTAIN UPSTREAM OF THE EXISTING BOX CULVERT ON BETHEL ROAD. 2.ESTABLISH THE STAGING/STOCKPILE AREA AND ASSOCIATED SILT FENCE ALONG THE PARKING LOT IN THE EASTERN SIDE OF THE PARK. 3.INSTALL A CHECK DAM DOWNSTREAM OF THE EXISTING CULVERTS IN EAST PRONG HUNTING CREEK. 4.INSTALL SILT FENCE ALONG THE WEST BANK OF EAST PRONG HUNTING CREEK. ACCESS FOR ESTABLISHING SILT FENCE SHALL OCCUR BY UTILIZING THE EXISTING STREAM CROSSINGS. 5.INSTALL THE STOCKPILE AREA AND ASSOCIATED SILT FENCE IN THE SOUTHERN PORTION OF THE PARK. 6.ESTABLISH THE STOCKPILE AREA AND ASSOCIATED SILT FENCE ALONG THE PARKING LOT IN THE NORTHWEST CORNER OF THE PARK. 7.INSTALL SILT FENCE ALONG THE EXISTING WETLANDS TO THE WEST OF FIDDLERS RUN. ACCESS FOR ESTABLISHING THE SILT FENCE SHALL OCCUR FROM THE EXISTING PARKING LOT IN THE NORTHWEST CORNER OF THE PARK. 8.INSTALL SILT FENCE ALONG THE EAST BANK OF FIDDLERS RUN. ACCESS FOR ESTABLISHING SILT FENCE SHALL OCCUR BY UTILIZING THE EXISTING STREAM CROSSING. PHASE 2 - STREAM CONSTRUCTION 1.ESTABLISH THE TEMPORARY CULVERT STREAM CROSSING ON EAST PRONG HUNTING CREEK AS SHOWN ON THE PLANS. 2.INSTALL THE TEMPORARY TIMBER MAT STREAM CROSSINGS AND ASSOCIATED DOWNSTREAM CHECK DAMS ALONG FIDDLERS RUN AS SHOWN ON THE PLANS. 3.STOCKPILE AREAS MAY BE INSTALLED AND UTILIZED AT THE CONTRACTOR'S DISCRETION. EACH ACTIVE STOCKPILE AREA SHALL BE SURROUNDED WITH SILT FENCE ON THE DOWNSTREAM SIDE WHICH EXTENDS TO THE INNER PARK SIDE A MINIMUM OF 50% OF THE STOCKPILE LENGTH AND EXTENDS TO THE STREAM SIDE A MINIMUM OF 80% OF THE STOCKPILE LENGTH. 4.TEMPORARY STREAM CROSSINGS SHALL BE REMOVED CONCURRENT WITH FILLING THE EXISTING CHANNEL WITH RECENTLY EXCAVATED MATERIALS AND GRADING THE FLOODPLAIN BENCH. 5.INSTALL THE TEMPORARY STREAM CROSSINGS IN THE AREAS SHOWN ON THE PLANS TO FACILITATE ACCESS ACROSS THE NEWLY CONSTRUCTED PORTION OF EAST PRONG HUNTING CREEK. 6.ONCE GRADING AND STABILIZATION OF EAST PRONG HUNTING CREEK IS COMPLETED, AND FLOW HAS BEEN REDIRECTED INTO THE NEW CHANNEL, REMOVE PHASE 1 SILT FENCE FROM THE LEFT BANK OF THE EXISTING CHANNEL, AND PLACE ALONG THE LEFT BANK OF THE NEW CHANNEL TO PRECLUDE SEDIMENT TRANSPORT INTO THE NEW CHANNEL FROM THE PARK. 7.UPON COMPLETION OF GRADING AND STABILIZATION OF FIDDLERS RUN AND REDIRECTION OF FLOW INTO THE NEWLY GRADED CHANNEL, PHASE 1 SILT FENCE SHALL BE MOVED TO THE RIGHT TOP-OF-BANK OF FIDDLERS RUN TO FACILITATE FLOODPLAIN GRADING AND TO PRECLUDE SEDIMENT TRANSPORT INTO THE CHANNEL FROM THE PARK AREA. PHASE 3 - PARK IMPROVEMENTS 1.BEGIN GRADING AND STABILIZING THE PROPOSED WALKING TRAIL AT THE SOUTHERN LIMITS OF THE PARK AND WORK CONCURRENTLY ALONG BOTH SIDES OF THE TRAIL UNTIL FINISH GRADE ELEVATIONS OF THE TRAIL HAVE BEEN ACHIEVED. THIS SHALL BE COMPLETED PRIOR TO INTERIOR GRADING OF THE PARK. 2.THE PROPOSED WALKING TRAIL SHALL ACT AS A DIVERSION BERM FOR PARK INTERIOR EARTHWORK. Erosion and Sediment Control Sequence 1.ALL EROSION AND SEDIMENT CONTROL (ESC) PRACTICES SHALL COMPLY WITH THE 2013 NORTH CAROLINA (NC) EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2.ALL GRADED AREAS WITH SLOPES STEEPER THAN 3:1 WILL BE STABILIZED WITHIN SEVEN WORKING DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN FOURTEEN DAYS. 3.STAGING AND STOCKPILE AREAS ARE DEPICTED IN THE ESC PLAN SHEETS. ADDITIONAL OR ALTERNATIVE STAGING AND/OR STOCKPILE AREAS MAY BE UTILIZED BY THE CONTRACTOR WITH PRIOR APPROVAL FROM THE OWNER AND THE ENGINEER, PROVIDED THAT ALL PRACTICES COMPLY WITH THE NC DEQ STORMWATER DESIGN MANUAL AND THE AREA/PRACTICE IS APPROVED BY THE OWNER PRIOR TO IMPLEMENTATION. 4.THE CONTRACTOR WILL ENSURE THAT ESC PRACTICES ARE PROPERLY FUNCTIONING IN STOCKPILE AREAS AS SHOWN ON THE ESC PLAN SHEETS. 5.THE CONTRACTOR WILL MAKE EVERY EFFORT TO AVOID DAMAGING OR REMOVING EXISTING TREES THAT HAVE NOT BEEN DESIGNATED FOR REMOVAL. CONSTRUCTION ACTIVITIES SHALL BE LIMITED WITHIN THE DRIP LINE OF TREES THAT ARE DESIGNATED TO REMAIN UNLESS OTHERWISE NOTED ON THE PLANS. 6.THE CONTRACTOR SHALL NOT EXCEED THE LIMITS OF DISTURBANCE (LOD) ILLUSTRATED ON THE PLANS WITHOUT PRIOR APPROVAL FROM THE ENGINEER AND OWNER. 7.THE CONTRACTOR SHALL UTILIZE A PUMP AROUND SYSTEM TO DIVERT FLOW AROUND ACTIVE WORK AREAS, AS NECESSARY, WHEN CONDUCTING CHANNEL EXCAVATION OR TYING NEW CHANNELS INTO THE EXISTING CHANNELS ON FIDDLERS RUN AND EAST PRONG HUNTING CREEK. 8.THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND DISPOSING OF ANY VEGETATION, MATERIALS, OR DEBRIS WITHIN THE SITE LIMITS AS DIRECTED BY THE ENGINEER. 9.ANY UNAUTHORIZED DAMAGE TO EXISTING STRUCTURES OR GROUNDS DUE TO CONSTRUCTION ACTIVITIES WILL BE REPAIRED OR REPLACED TO A CONDITION THAT MEETS OR EXCEEDS THE PREVIOUS STANDARD. REPAIRS WILL OCCUR AT THE EXPENSE OF THE CONTRACTOR. 10.THE CONTRACTOR WILL COORDINATE WITH THE ENGINEER AND OWNER PRIOR TO CLOSING ANY PARKING LOTS, ROADWAYS, OR PARK AMENITIES (I.E., BASKETBALL COURTS, TENNIS COURTS, DOG PARK, WALKING TRAIL, PLAYGROUND, ETC.). 11.ALL LOG SILLS AND LOG J-HOOK STRUCTURES SHALL BE CONSTRUCTED AS DIRECTED BY THE ENGINEER IN THE FIELD. 12.THE ENGINEER WILL PROVIDE (1) A STORMWATER PERMIT (2) 404 PERMIT THAT AUTHORIZE THE LAND DISTURBANCE ACTIVITIES AND IMPACTS TO THE WATERS OF THE U.S. AS DEPICTED ON THE PLANS (3) NCDOT ENCROACHMENT PERMIT AND (4) FEMA APPROVED CLOMR. THE CONTRACTOR WILL BE RESPONSIBLE FOR SECURING ALL OTHER NECESSARY PERMITS AND AUTHORIZATIONS TO COMPLETE THE WORK. 13.THE TRAFFIC ENGINEER FOR THE CITY OF MORGANTON MUST BE CONSULTED AS NEEDED. 14.EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES OCCUR. THE COC CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (3-NOI) FORM AT DEQ.NC.GOV/NCG01. PLEASE NOTE, THE E-NOI FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN APPROVED. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLANS MUST BE KEPT ON SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE DURING INSPECTION. 15.THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO SETUP A MEETING WITH NCDEQ DIVISION OF ENERGY, MINERAL AND LAND RESOURCES REGIONAL (RALEIGH) OFFICE, 919-791-4200, TO NOTIFY THEM OF THE START DATE AND SCHEDULE A PRE-CONSTRUCTION MEETING AT LEAST 48 HOURS PRIOR TO PROJECT ACTIVATION. 16.EQUIPMENT STORAGE WITHIN THE PARK WHEN THE SITE IS NOT ACTIVELY BEING WORKED ON IS PROHIBITED. EQUIPMENT, FUEL TANKS, AND FACILITIES MUST BE LOCATED WITHIN THE TWO PARKING LOT AREAS AND ADJACENT STOCKPILE AREAS WHEN NOT IN ACTIVE USE. 17.WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. CE CE C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E CE CE C E C E C E CECECE CE CE CE CE CE CE CE CE C E C E C E CE CE O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E O H E O H E O H E O H E O H E O H E S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S OUE OUE OUEOUEOUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE O U E O U E O U E O U E O U E O U E O U E O U E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E O U E O U E O U E O U E O U E O U E O U E O U E O U E SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.5 EWT 25 LLC PARCEL ID: 2713040633 CITY OF MORGANTON PARCEL ID: 2713047373 THOMAS F & ALICE P JOHNSON PARCEL ID: 2713142528 CHARLES DALMER WOODARD PARCEL ID: 2713143460 GARY MARK JOHNSON PARCEL ID: 2713143048 LANELLE P JENNINGS PARCEL ID: 2713133867 ROBERT ERIC & SHEILA H JONES PARCEL ID: 2713133701 J M & CHARLOTTE M SIMASEK PARCEL ID: 2713132556 J M & CHARLOTTE M SIMASEK PARCEL ID: 2713132447 MTC LLC PARCEL ID: 2703929457 CITY OF MORGANTON PARCEL ID: 2713033871 ROBERT JOSEPH & VICTORIA LYNN CLAYTON PARCEL ID: 2713032927 MULL INC PARCEL ID: 2713153547 ROBERT JOSEPH & VICTORIA LYNN CLAYTON PARCEL ID: 2713041045 PROPOSED PARK ACCESS PROPOSED PARK ACCESS Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P r o j e c t O v e r v i e w . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 0. 4 08 . 3 1 . 2 0 2 3 0'100'200'300' (HORIZONTAL) N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pr o j e c t O v e r v i e w E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N BETHEL ROAD W O O D L A W N D R I V E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E O H E O H E O H E O H E O H E O H E S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S X X X X X X X X X X X X XX X OUE OUE OUEOUEOUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE O U E O U E O U E O U E O U E O U E O U E O U E O U E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E O U E O U E O U E O U E O U E O U E O U E O U E SHEET 1.1 SHEET 1.2 SHEET 1.3 SHEET 1.4 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e m o l i t i o n P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 1. 0 08 . 3 1 . 2 0 2 3 0'100'200'300' (HORIZONTAL) N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De m o l i t i o n P l a n E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N BETHE L R O A D Existing Park Structure To Be Removed Existing Tree To Be Removed Demolition Legend 1 0 7 5 107 0 1 0 6 5 10 6 0 10 5 5 10 6 5 1 0 6 0 1 0 5 5 1 0 5 0 1 0 4 5 1 0 4 5 1 0 4 5 10451045 1 0 4 5 1 0 4 5 10 4 5 OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E EAS T P R O N G H U N T I N G C R E E K EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) EXISTING DISC GOLF HOLE TO BE REMOVED (TYP) EXISTING DISC GOLF INFRASTRUCTURE TO BE REMOVED (TYP) EXISTING UNDERGROUND ELECTRIC TO BE REMOVED (TYP) EXISTING OVERHEAD ELECTRIC TO REMAIN (TYP) EXISTING SEWER TO REMAIN (TYP) EXISTING TREE TO BE REMOVED (TYP) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e m o l i t i o n P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 1. 1 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De m o l i t i o n P l a n 0'40'80'120' (HORIZONTAL) Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 1.4 SHEET 1.3 SHEET 1.2 SHEET 1.1 1 0 4 5 10 4 5 10 4 5 1045 1045 10 4 0 1 0 4 5 O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E OH E S S S S S S S S S S S S X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X XXXX X X X X O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E OU E OU E OU E O U E O U E O U E O U E O U E FID D L E R S R U N E A S T P R O N G H U N T I N G C R E E K RECREATIONAL AREA TO REMAIN EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) EXISTING DISC GOLF HOLE TO BE REMOVED (TYP) EXISTING DISC GOLF INFRASTRUCTURE TO BE REMOVED (TYP) EXISTING FENCE TO BE REMOVED EXISTING CULVERTS TO BE REMOVED EXISTING UNDERGROUND ELECTRIC TO BE REMOVED (TYP) EXISTING PARKING LOT TO REMAIN EXISTING TREE TO BE REMOVED (TYP) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e m o l i t i o n P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 1. 2 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De m o l i t i o n P l a n Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 1.4 SHEET 1.3 SHEET 1.2 SHEET 1.1 N 0'40'80'120' (HORIZONTAL) 1 0 4 5 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1 0 5 5 10 4 0 1040 10 4 0 1 0 5 5 1 0 5 5 1 0 6 5 106 0 O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS X X X X X OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N EXISTING FENCE TO BE REMOVED EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) EXISTING UNDERGROUND ELECTRIC TO BE REMOVED (TYP) EXISTING BRIDGE TO BE REMOVED EXISTING PARKING LOT TO REMAIN EXISTING OVERHEAD ELECTRIC TO REMAIN (TYP) EXISTING TREE TO BE REMOVED (TYP) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e m o l i t i o n P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 1. 3 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De m o l i t i o n P l a n Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 1.4 SHEET 1.3 SHEET 1.2 SHEET 1.1 N 0'40'80'120' (HORIZONTAL) 10 4 0 1 0 5 5 104 5 1040 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1040 10 4 0 10 4 0 1 0 5 5 1 0 5 5 1 0 6 5 106 0 O H E O H E O H E O H E O H E O H E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS OUE OUE OUE OUE OUE OUE OUEOUEOUEOUEOUEOUEOUEOUE O U E O U E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E O U E OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E O U E E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N BETHEL ROAD E A S T P R O N G H U N T I N G C R E E K EXISTING UNDERGROUND ELECTRIC TO BE REMOVED (TYP) EXISTING BRIDGE TO BE REMOVED EXISTING PARKING LOT TO REMAIN EXISTING WATERLINE TO REMAIN EXISTING SEWER TO REMAIN (TYP) EXISTING OVERHEAD ELECTRIC TO REMAIN (TYP) EXISTING TREE TO BE REMOVED (TYP) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e m o l i t i o n P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 1. 4 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De m o l i t i o n P l a n FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K Sheet Index SHEET 1.4 SHEET 1.3 SHEET 1.2 SHEET 1.1 N 0'40'80'120' (HORIZONTAL) OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OUEOUEOUEOUEOUEOUEOUEOUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE CECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CR-NM C R - C H CR-NM EAST P R O N G H U N T I N G C R E E K EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) FILL EXISTING CHANNEL (TYP) DISC GOLF HOLE TO BE REMOVED (TYP) DISC GOLF INFRASTRUCTURE TO BE REMOVED STA: 100+00 BEGIN EAST PRONG HUNTING CREEK REACH 1 100+0 0 101+0 0 10 2 + 0 0 103+00 104+00 104 5 1045 1045 1 0 4 5 10 4 5 1 0 4 0 104 0 1045 1045 10 4 5 M A T C H L I N E - S T A 1 0 4 + 0 0 1035 1040 1045 1050 1035 1040 1045 1050 100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 -0.3%-0.8% -0.3%-0.7% -0.3% -0.3% PROPOSED GRADE PROPOSED BANKFULL EXISTING GRADE STA = 100+00 ELEV = 1041.60 STA = 100+70 ELEV = 1041.38 ST A = 1 0 1 + 0 0 EL E V = 1 0 4 1 . 1 4 STA = 101+00 ELEV = 1036.35 ST A = 1 0 1 + 5 0 EL E V = 1 0 3 6 . 3 5 ST A = 1 0 1 + 7 5 EL E V = 1 0 4 1 . 0 4 ST A = 1 0 2 + 1 1 EL E V = 1 0 4 0 . 9 2 ST A = 1 0 2 + 5 7 EL E V = 1 0 4 0 . 5 9 ST A = 1 0 2 + 7 7 EL E V = 1 0 3 5 . 8 7 ST A = 1 0 2 + 9 7 EL E V = 1 0 3 5 . 8 7 ST A = 1 0 3 + 1 7 EL E V = 1 0 4 0 . 5 9 0'20'40'60' (HORIZONTAL) N X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 1 . 1 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Ea s t P r o n g H u n t i n g C r e e k P l a n a n d P r o f i l e Re a c h 1 FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y SHEET 2.1.5 10.5'10.5'14' BANKFULL WIDTH = 35' Dmax = 3.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8' Typical Sections - Reach 1 Riffle Pool 3:13:1 4:1 3:1 4.5' 1:1 1: 1 4.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8.3' Pool with Structure 4:1 3:1 4.5' 1: 1 1:1 4.5' Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. 3.5' 3.5' OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE SS SS SS SS SS SS SS SS SS SS X X X X X X X X X X X X X OUEOUEOUEOUE OUEOUEOUEOUEOUEOUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE CE CE CE CE CE CECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CR-NM C R - N M CR- N M EAST PRONG HUNTING CREEK EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) EXIST I N G A S P H A L T W A L K I N G T R A I L FILL EXISTING CHANNEL (TYP) PROPOSED ASPHALT WALKING TRAIL BY OTHERS DISC GOLF HOLE TO BE REMOVED (TYP) 104+00 10 5 + 0 0 1 0 6 + 0 0 107+00 108 + 0 0 109+ 0 0 PROPOSED LOG SILL 1045 1045 10 4 5 10 4 5 1045 1045 1045 1 0 3 5 104 0 1 0 4 5 1045 10501055 1045 104 0 104 5 MA T C H L I N E - S T A 1 0 4 + 0 0 M A T C H L I N E - S T A 1 0 8 + 3 0 1033 1035 1040 1045 1033 1035 1040 1045 104+00 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00 108+30 -0.7%-0.3%-0.9% -0.3% -0.3% ST A = 1 0 4 + 5 4 EL E V = 1 0 3 9 . 9 4 ST A = 1 0 6 + 0 5 EL E V = 1 0 3 9 . 4 8 PROPOSED GRADE PROPOSED BANKFULL EXISTING GRADE PROPOSED CRAYFISH GLIDE ST A = 1 0 4 + 1 3 EL E V = 1 0 4 0 . 2 8 ST A = 1 0 4 + 5 4 EL E V = 1 0 3 9 . 9 8 ST A = 1 0 4 + 7 3 EL E V = 1 0 3 5 . 2 5 ST A = 1 0 4 + 9 1 EL E V = 1 0 3 5 . 2 5 STA = 105+10 ELEV = 1039.98 ST A = 1 0 5 + 7 4 EL E V = 1 0 3 9 . 7 8 ST A = 1 0 6 + 0 5 EL E V = 1 0 3 9 . 5 1 STA = 106+06 ELEV = 1034.67 ST A = 1 0 7 + 0 1 EL E V = 1 0 3 4 . 6 7 ST A = 1 0 7 + 5 0 EL E V = 1 0 3 9 . 2 1 0'20'40'60' (HORIZONTAL) N X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 1 . 2 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Ea s t P r o n g H u n t i n g C r e e k P l a n a n d P r o f i l e Re a c h 1 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 10.5'10.5'14' BANKFULL WIDTH = 35' Dmax = 3.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8' Typical Sections - Reach 1 Riffle Pool 3:13:1 4:1 3:1 4.5' 1:1 1: 1 4.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8.3' Pool with Structure 4:1 3:1 4.5' 1: 1 1:1 4.5' Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.1.5 3.5' 3.5' OHE OHE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X OUE OUE OUE OUE OUE OUE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CR-NM CR-N M CR-ALR CR-CH EAST PRONG HUNTING CREEK EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) PROPOSED BRIDGE FORPARK ACCESS EXISTING PARKING LOT TO REMAIN EXISTING FENCE TO BE REMOVED FILL EXISTING CHANNEL (TYP) EXISTING 26 LF DUAL 48" CMP CULVERTS TO BE REMOVED PROPOSED ASPHALT WALKING TRAIL BY OTHERS 108+0 0 109+00 11 0 + 0 0 111+00 112+ 0 0 113+00 10 4 5 1040 1040 1040 1045 1 0 3 5 1045 MA T C H L I N E - S T A 1 0 8 + 3 0 MA T C H L I N E - S T A 1 1 2 + 8 0 1032 1035 1040 1045 1032 1035 1040 1045 108+30 108+50 109+00 109+50 110+00 110+50 111+00 111+50 112+00 112+50 112+80 -0.3% -0.8%-0.3%-0.6% -0.4% -0.5% PROPOSED GRADE PROPOSED BANKFULL EXISTING GRADE ST A = 1 0 8 + 3 8 EL E V = 1 0 3 8 . 9 3 STA = 108+80 ELEV = 1038.61 ST A = 1 0 9 + 0 0 EL E V = 1 0 3 4 . 3 9 ST A = 1 0 9 + 1 9 EL E V = 1 0 3 4 . 3 9 ST A = 1 0 9 + 3 8 EL E V = 1 0 3 8 . 6 1 ST A = 1 1 0 + 0 3 EL E V = 1 0 3 8 . 4 0 ST A = 1 1 0 + 3 7 EL E V = 1 0 3 8 . 1 9 STA = 110+48 ELEV = 1034.31 ST A = 1 1 0 + 6 0 EL E V = 1 0 3 4 . 3 1 ST A = 1 1 0 + 7 2 EL E V = 1 0 3 8 . 1 9 ST A = 1 1 1 + 6 7 EL E V = 1 0 3 7 . 7 9 ST A = 1 1 1 + 7 7 EL E V = 1 0 3 3 . 9 0 ST A = 1 1 1 + 8 7 EL E V = 1 0 3 3 . 9 0 ST A = 1 1 1 + 9 7 EL E V = 1 0 3 7 . 7 9 ST A = 1 1 2 + 4 3 EL E V = 1 0 3 7 . 5 7 STA = 112+44 ELEV = 1032.68 0'20'40'60' (HORIZONTAL) N X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 1 . 3 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Ea s t P r o n g H u n t i n g C r e e k P l a n a n d P r o f i l e Re a c h 1 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 10.5'10.5'14' BANKFULL WIDTH = 35' Dmax = 3.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8' Typical Sections - Reach 1 Riffle Pool 3:13:1 4:1 3:1 4.5' 1:1 1: 1 4.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8.3' Pool with Structure 4:1 3:1 4.5' 1: 1 1:1 4.5' Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.1.5 3.5' 3.5' OHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE SS SS SS SS SS SS SS SS SS SS OUEOUEOUEOUEOUEOUEOUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CR-N M CR-A L R CR-NM EAST PRONG HUNTING CREEK EXISTING BRIDGE TO BE REMOVED FILL EXISTING CHANNEL (TYP) EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) PROPOSED ASPHALT WALKING TRAIL BY OTHERS 113+00 11 4 + 0 0 115+ 0 0 116+ 0 0 117+00 1040 1045 104 0 1045 1040 1 0 4 0 1040 1040 M A T C H L I N E - S T A 1 1 2 + 8 0 M A T C H L I N E - S T A 1 1 7 + 2 0 1030 1035 1040 1045 1030 1035 1040 1045 112+80 113+00 113+50 114+00 114+50 115+00 115+50 116+00 116+50 117+00 117+20 -0.3%-0.8% -0.3%-0.6%-0.3% -0.3% PROPOSED BANKFULL EXISTING GRADE PROPOSED GRADE ST A = 1 1 3 + 1 1 EL E V = 1 0 3 2 . 6 8 ST A = 1 1 3 + 4 6 EL E V = 1 0 3 7 . 3 2 ST A = 1 1 4 + 0 4 EL E V = 1 0 3 7 . 1 3 ST A = 1 1 4 + 3 2 EL E V = 1 0 3 6 . 9 1 STA = 114+33 ELEV = 1032.41 ST A = 1 1 4 + 8 0 EL E V = 1 0 3 2 . 4 1 ST A = 1 1 5 + 0 4 EL E V = 1 0 3 6 . 8 1 ST A = 1 1 5 + 7 3 EL E V = 1 0 3 6 . 5 9 ST A = 1 1 6 + 1 8 EL E V = 1 0 3 6 . 3 2 ST A = 1 1 6 + 3 1 EL E V = 1 0 3 2 . 4 6 ST A = 1 1 6 + 4 5 EL E V = 1 0 3 2 . 4 6 ST A = 1 1 6 + 5 8 EL E V = 1 0 3 6 . 3 2 ST A = 1 1 7 + 1 0 EL E V = 1 0 3 6 . 1 5 PROPOSED CRAYFISH GLIDE 0'20'40'60' (HORIZONTAL) N X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 1 . 4 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Ea s t P r o n g H u n t i n g C r e e k P l a n a n d P r o f i l e Re a c h 1 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 10.5'10.5'14' BANKFULL WIDTH = 35' Dmax = 3.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8' Typical Sections - Reach 1 Riffle Pool 3:13:1 4:1 3:1 4.5' 1:1 1: 1 4.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8.3' Pool with Structure 4:1 3:1 4.5' 1: 1 1:1 4.5' Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.1.5 3.5' 3.5' OH E OH E SSSSSSSSSS OU E OU E OU E OU E OU E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CR - N M CR-N M CR - C H CR - C H EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) STA: 120+46 END EAST PRONG HUNTING CREEK REACH 1 BEGIN EAST PRONG HUNTING CREEK REACH 2 F I D D L E R S R U N EAST PRONG HUNTING CREEK FILL EXISTING CHANNEL (TYP) BETH E L R O A D STA: 121+21 END EAST PRONG HUNTING CREEK REACH 2 21 3 + 4 2 2 1 2 + 0 0 21 3 + 0 0 1 2 1 + 2 1 11 7 + 0 0 118+00 119+ 0 0 12 0 + 0 0 1 2 1 + 0 0 C R - C H 1 0 4 0 1045 1040 1040 1 0 4 0 10 4 0 1 0 4 0 105 5 1 0 3 5 103 5 1 0 3 5 1040 1 0 3 5 1 0 4 0 1 0 3 5 10 4 0 104 0 103 0 1040 MA T C H L I N E - S T A 1 1 7 + 2 0 1028 1030 1035 1040 1028 1030 1035 1040 117+20 117+50 118+00 118+50 119+00 119+50 120+00 120+50 121+00 121+21 -0.2% -0.4%-0.3%-0.9% -0.5% -0.6% -0.3% PROPOSED GRADE PROPOSED BANKFULL EXISTING GRADE EXISTING 8" DIP WATER LINE IE: 1033.7 EXISTING 12' x 10.6' TRIPLE CONCRETE BOX CULVERTS IE: 1034.55 ST A = 1 1 7 + 4 6 EL E V = 1 0 3 6 . 0 0 STA = 117+47 ELEV = 1031.41 STA = 118+00 ELEV = 1031.41 ST A = 1 1 8 + 2 7 EL E V = 1 0 3 5 . 9 0 ST A = 1 1 8 + 8 1 EL E V = 1 0 3 5 . 7 3 ST A = 1 1 9 + 0 8 EL E V = 1 0 3 5 . 5 0 STA = 119+09 ELEV = 1030.59 ST A = 1 1 9 + 6 1 EL E V = 1 0 3 0 . 5 9 ST A = 1 1 9 + 8 7 EL E V = 1 0 3 5 . 3 0 ST A = 1 2 0 + 1 3 EL E V = 1 0 3 5 . 1 6 STA = 120+14 ELEV = 1029.74 STA = 120+46 ELEV = 1029.74 ST A = 1 2 0 + 7 0 EL E V = 1 0 3 4 . 8 6 STA = 121+21 ELEV = 1034.55 PROPOSED CRAYFISH GLIDE 0'20'40'60' (HORIZONTAL) N 0'2'4'6' (VERTICAL) X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 1 . 5 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Ea s t P r o n g H u n t i n g C r e e k P l a n a n d P r o f i l e Re a c h 1 a n d R e a c h 2 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 10.5'10.5'14' BANKFULL WIDTH = 35' Dmax = 3.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8' Typical Sections - Reach 1 Riffle Pool 3:13:1 4:1 3:1 4.5' 1:1 1: 1 4.5' 10.5'14'13.9' BANKFULL WIDTH = 47.4' Dmax = 7.4'-8.3' Pool with Structure 4:1 3:1 4.5' 1: 1 1:1 4.5' Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.1.5 3.5' 3.5' S S S S S S SS SS SS SS SS SS SS SS CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CECECECECECECECECECECECECECECECECECECE C E C R - N M CR- C H C R - C H CR-NM FIDDLERS RUN EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) FILL EXISTING CHANNEL (TYP) FILL EXIS T I N G C H A N N E L ( T Y P ) STA: 200+00 BEGIN FIDDLERS RUN 2 0 0 + 0 0 201+0 0 202+00 2 0 3 + 0 0 204+0 0 PROTECT EXISTING WETLANDS 1040 1 0 4 5 1040 1040 1040 1045 MA T C H L I N E - S T A 2 0 4 + 2 0 1033 1035 1040 1045 1033 1035 1040 1045 200+00 200+50 201+00 201+50 202+00 202+50 203+00 203+50 204+00 204+20 ST A = 2 0 1 + 6 1 EL E V = 1 0 3 9 . 8 4 -0.4% -0.7% -0.7% -0.8% -0.4% PROPOSED BANKFULL EXISTING GRADE PROPOSED GRADE STA = 200+00 ELEV = 1040.96 ST A = 2 0 0 + 3 9 EL E V = 1 0 4 0 . 6 9 STA = 200+40 ELEV = 1036.63 ST A = 2 0 0 + 9 4 EL E V = 1 0 3 6 . 6 3 ST A = 2 0 1 + 2 1 EL E V = 1 0 4 0 . 4 9 ST A = 2 0 1 + 6 1 EL E V = 1 0 4 0 . 2 0 STA = 201+62 ELEV = 1037.05 STA = 202+20 ELEV = 1037.05 ST A = 2 0 2 + 4 9 EL E V = 1 0 4 0 . 0 0 ST A = 2 0 2 + 9 7 EL E V = 1 0 3 9 . 6 1 ST A = 2 0 3 + 1 5 EL E V = 1 0 3 5 . 6 7 ST A = 2 0 3 + 3 3 EL E V = 1 0 3 5 . 6 7 ST A = 2 0 3 + 5 0 EL E V = 1 0 3 9 . 6 1 ST A = 2 0 4 + 0 4 EL E V = 1 0 3 9 . 4 0 PROPOSED CRAYFISH GLIDE 0'20'40'60' (HORIZONTAL) N X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 2 . 1 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Fi d d l e r s R u n P l a n a n d P r o f i l e 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 7.5'7.5'9.7' BANKFULL WIDTH = 24.7' Dmax = 2.5' Typical Sections Riffle 3:1 3:1 7.5'10'9.5' BANKFULL WIDTH = 33.6' Dmax = 5.5' Pool 4:1 3:1 3.3'3.3' 1 : 1 1:1 7.5'10'9.5' BANKFULL WIDTH = 33.6' Dmax = 6.2'-6.4' Pool with Structure 4:1 3:1 3.3'3.3' 1 : 1 1:1 Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.1.5 2.5' 2.5' CE CECECECECECECECECECECECECECECECECECECECECECECECECECECECECECE CR-N M C R - N M CR- C H C R - N M FIDDLERS RUN EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) FILL EXISTING CHANNEL (TYP) PROTECT EXISTING WETLANDS PROPOSED ASPHALT WALKING TRAIL BY OTHERS 204 + 0 0 2 0 5 + 0 0 206+00 207 + 0 0 2 0 8 + 0 0 209+00 1040 104 0 10 4 0 104 0 1040 1040 1040 M A T C H L I N E - S T A 2 0 4 + 2 0 MA T C H L I N E - S T A 2 0 8 + 5 0 1033 1035 1040 1045 1033 1035 1040 1045 204+20 204+50 205+00 205+50 206+00 206+50 207+00 207+50 208+00 208+50 -0.3% -1.0% -0.6% -0.3%-0.9% -0.5% PROPOSED BANKFULL EXISTING GRADE PROPOSED GRADE ST A = 2 0 4 + 3 9 EL E V = 1 0 3 9 . 0 4 ST A = 2 0 4 + 5 8 EL E V = 1 0 3 6 . 0 2 ST A = 2 0 4 + 7 8 EL E V = 1 0 3 6 . 0 2 ST A = 2 0 4 + 9 7 EL E V = 1 0 3 9 . 0 4 STA = 205+60 ELEV = 1038.67 STA = 205+60 ELEV = 1034.68 ST A = 2 0 6 + 1 4 EL E V = 1 0 3 4 . 6 8 ST A = 2 0 6 + 4 1 EL E V = 1 0 3 8 . 5 7 ST A = 2 0 6 + 7 7 EL E V = 1 0 3 8 . 4 5 ST A = 2 0 7 + 1 9 EL E V = 1 0 3 8 . 0 7 ST A = 2 0 7 + 4 5 EL E V = 1 0 3 5 . 0 7 ST A = 2 0 7 + 7 1 EL E V = 1 0 3 5 . 0 7 ST A = 2 0 7 + 9 7 EL E V = 1 0 3 8 . 0 7 PROPOSED CRAYFISH GLIDE 0'20'40'60' (HORIZONTAL) N X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 2 . 2 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Fi d d l e r s R u n P l a n a n d P r o f i l e 0'2'4'6' (VERTICAL) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 7.5'7.5'9.7' BANKFULL WIDTH = 24.7' Dmax = 2.5' Typical Sections Riffle 3:1 3:1 7.5'10'9.5' BANKFULL WIDTH = 33.6' Dmax = 5.5' Pool 4:1 3:1 3.3'3.3' 1 : 1 1:1 7.5'10'9.5' BANKFULL WIDTH = 33.6' Dmax = 6.2'-6.4' Pool with Structure 4:1 3:1 3.3'3.3' 1 : 1 1:1 Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.1.5 2.5' 2.5' C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E CECECECECECE CECECECECE CE CE CE CE CE CR-C H CR- N M CR-N M CR - N M CR-A L R CR- C H EN D E A S T P R O N G H U N T I N G C R E E K R E A C H 1 FIDDLERS RU N EA S T P R O N G H U N T I N G C R E E K EXISTING PARKING LOT TO REMAIN EXISTING BRIDGE TO BE REMOVED EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) FILL EXISTING CHANNEL (TYP) PROPOSED ASPHALT WALKING TRAIL BY OTHERS 213 + 4 2 209+00 210+00 211+00 212+0 0 213 + 0 0 1 1 9 + 0 0 120+ 0 0 PROPOSED BOARDWALK/BRIDGE FOR PARK ACCESS PROPOSED LOG SILL 1040 10 4 0 1040 10 4 0 1040 1040 1 0 3 5 1040 1035 104 0 1040 1 0 3 0 104 0 104 0 1040 M A T C H L I N E - S T A 2 0 8 + 5 0 MA T C H L I N E - S T A 2 1 2 + 8 0 1030 1035 1040 1045 1030 1035 1040 1045 208+50 209+00 209+50 210+00 210+50 211+00 211+50 212+00 212+50 212+80 -0.3% -0.4% -0.7% -0.8% -1.0% PROPOSED BANKFULL EXISTING GRADE PROPOSED GRADE ST A = 2 0 8 + 7 0 EL E V = 1 0 3 7 . 6 8 ST A = 2 0 8 + 8 3 EL E V = 1 0 3 3 . 9 0 ST A = 2 0 8 + 9 7 EL E V = 1 0 3 3 . 9 0 ST A = 2 0 9 + 1 1 EL E V = 1 0 3 7 . 6 8 ST A = 2 0 9 + 6 9 EL E V = 1 0 3 7 . 4 2 STA = 209+69 ELEV = 1034.26 ST A = 2 1 0 + 0 1 EL E V = 1 0 3 4 . 2 6 ST A = 2 1 0 + 1 7 EL E V = 1 0 3 7 . 3 2 ST A = 2 1 0 + 7 1 EL E V = 1 0 3 6 . 9 5 STA = 210+72 ELEV = 1033.90 ST A = 2 1 1 + 1 0 EL E V = 1 0 3 3 . 9 0 STA = 211+30 ELEV = 1036.75 ST A = 2 1 1 + 9 7 EL E V = 1 0 3 6 . 2 2 STA = 211+97 ELEV = 1032.58 ST A = 2 1 2 + 3 1 EL E V = 1 0 3 2 . 5 8 ST A = 2 1 2 + 4 8 EL E V = 1 0 3 5 . 9 2 0'20'40'60' (HORIZONTAL) N 0'2'4'6' (VERTICAL) X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 2 . 3 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Fi d d l e r s R u n P l a n a n d P r o f i l e Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 7.5'7.5'9.7' BANKFULL WIDTH = 24.7' Dmax = 2.5' Typical Sections Riffle 3:1 3:1 7.5'10'9.5' BANKFULL WIDTH = 33.6' Dmax = 5.5' Pool 4:1 3:1 3.3'3.3' 1 : 1 1:1 7.5'10'9.5' BANKFULL WIDTH = 33.6' Dmax = 6.2'-6.4' Pool with Structure 4:1 3:1 3.3'3.3' 1 : 1 1:1 Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.1.5 2.5' 2.5' SS SS SS SS O U E O U E O U E O U E O U E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E CE CE CE CE CE CE CE CE C E C E C E C E C E C E C R - N M CR-C H CR-A L R CR- C H FIDDLERS R U N EA S T P R O N G H U N T I N G C R E E K EXISTING PARKING LOT TO REMAIN EXISTING BRIDGE TO BE REMOVED EXISTING ASPHALT WALKING TRAIL TO BE REMOVED (TYP) B E T H E L R O A D FILL EXISTING CHANNEL (TYP) STA: 213+42 END FIDDLERS RUN 213 + 4 2 212+0 0 213 + 0 0 121+21 1 1 9 + 0 0 120+ 0 0 121+00 CR-CH 1040 10 4 0 1040 1040 1 0 5 5 10 5 5 1035 1 0 3 5 1035 1040 1035 1 0 4 0 1 0 3 0 1040 104 0 10 4 5 10 5 0 GRADING TIE IN TO HEADWALLS TO BE DIRECTED IN THE FIELD BY THE ENGINEER MA T C H L I N E - S T A 2 1 2 + 8 0 1028 1030 1035 1040 1028 1030 1035 1040 212+80 213+00 213+42 -0.3% EXISTING GRADE PROPOSED BANKFULL PROPOSED GRADE STA = 213+07 ELEV = 1035.31 STA = 213+07 ELEV = 1029.74 STA = 213+42 ELEV = 1029.74 0'20'40'60' (HORIZONTAL) N 0'2'4'6' (VERTICAL) X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n a n d P r o f i l e . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 2. 2 . 4 08 . 3 1 . 2 0 2 3 Sheet Index Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Fi d d l e r s R u n P l a n a n d P r o f i l e Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 7.5'7.5'9.7' BANKFULL WIDTH = 24.7' Dmax = 2.5' Typical Sections Riffle 3:1 3:1 7.5'10'9.5' BANKFULL WIDTH = 33.6' Dmax = 5.5' Pool 4:1 3:1 3.3'3.3' 1 : 1 1:1 7.5'10'9.5' BANKFULL WIDTH = 33.6' Dmax = 6.2'-6.4' Pool with Structure 4:1 3:1 3.3'3.3' 1 : 1 1:1 Note: Pool Dmax can vary ± 0.2' Note: Structures shown on the proposed profile are not drawn to scale. Symbols are included for illustrative purposes only. SHEET 2.2.1 SHEET 2.2.2 SHEET 2.2.3 SHEET 2.2.4 SHEET 2.1.1 SHEET 2.1.2 SHEET 2.1.3 SHEET 2.1.4 SHEET 2.1.5 2.5' 2.5' CE CE C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E CE CE CE CE CE CE CE CE C E C E C E C E C E C E CE CE C E C E C E CECECE CE CE CE CE CE CE CE CE C E C E C E CE CE SHEET 3.1 > >>> > > >>>> >> > > >>> > > > > SHEET 3.2 SHEET 3.3 SHEET 3.4 1 0 7 5 107 0 10 5 5 10 6 5 1 0 6 0 1 0 5 5 1 0 5 0 1 0 4 5 1 0 4 5 1 0 4 5 1 0 4 5 10 4 5 1045 10 4 0 1 0 4 5 10 4 0 1 0 6 0 10 4 0 104 5 1 0 4 5 1 0 5 0 1 0 6 0 1040 10 4 0 104 0 10 4 0 1045 1 0 4 0 10 4 0 1 0 4 0 10 4 0 1 0 4 0 10 4 0 10 4 0 104 0 104 0 CROSS-SECTION A CROSS-SECTION B CROSS -SECTION C CROSS - S E C T I O N D Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - G r a d i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 3. 0 08 . 3 1 . 2 0 2 3 0'100'200'300' (HORIZONTAL) N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Gr a d i n g P l a n E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N BETHE L R O A D PROPOSED ASPHALT WALKING TRAIL BY OTHERS RECREATIONAL AREA TO REMAIN NOTE: CONTRACTOR RESPONSIBLE FOR ROUGH GRADING OF WALKING TRAIL TO GRADES SHOWN HEREIN. FINISH ASPHALT TOPDRESSING TO BE COMPLETED BY OTHERS. 1037 1040 1045 1050 1037 1040 1045 1050 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+39 PROPOSED GRADE EXISTING GRADE C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E CE CE C E CE C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E CE CE C E CE C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE > > > >>>>>>> 1 0 7 5 107 0 1 0 6 5 10 6 0 10 5 5 10 6 5 1 0 6 0 1 0 5 5 1 0 5 0 1 0 4 5 1 0 4 5 1 0 4 5 10451045 1 0 4 5 1 0 4 5 10 4 5 EAS T P R O N G H U N T I N G C R E E K EXISTING ASPHALT WALKING TRAIL TO BE REMOVED PROPOSED ASPHALT WALKING TRAIL BY OTHERS 104 0 10 4 0 CROSS-SECTION A 0+00 1+00 2+00 3+00 4+00 4+39 1 0 0 + 0 0 1 0 1 + 0 0 102 + 0 0 10 3 + 0 0 1 0 4 + 0 0 105 + 0 0 106 + 0 0 EXISTING WETLAND B IMPACT (0.013 AC). FLOODPLAIN BENCH AND TRAIL GRADING. Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - G r a d i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 3. 1 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Gr a d i n g P l a n Cross-Section A 0'40'80'120' (HORIZONTAL) 0'4'8'12' (VERTICAL) Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 3.4 SHEET 3.3 SHEET 3.2 SHEET 3.1 NOTE: CONTRACTOR RESPONSIBLE FOR ROUGH GRADING OF WALKING TRAIL TO GRADES SHOWN HEREIN. FINISH ASPHALT TOPDRESSING TO BE COMPLETED BY OTHERS. 1033 1035 1040 1045 1033 1035 1040 1045 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+508+56 PROPOSED GRADE EXISTING GRADE PROPOSED ASPHALT WALKING TRAIL PROPOSED ASPHALT WALKING TRAIL TIE TO EXISTING GRADE C E C E C E CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E CE CE CE CE C E C E C E CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E CE CE CE CE > > > > > > >>>>>>>>> > >>>> 1 0 4 5 10 4 5 10 4 5 1045 1045 10 4 0 1 0 4 5 E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N EXISTING ASPHALT WALKING TRAIL TO BE REMOVED PROPOSED ASPHALT WALKING TRAIL BY OTHERS 104 0 1045 1 0 4 0 10 4 0 1 0 4 0 CROSS-SECTION B RECREATIONAL AREA TO REMAIN 200 + 0 0 2 0 1 + 0 0 2 0 2 + 0 0 203 + 0 0 2 0 4 + 0 0 205+ 0 0 105 + 0 0 106 + 0 0 1 0 7 + 0 0 10 8 + 0 0 1 0 9 + 0 0 11 0 + 0 0 1 1 1 + 0 0 11 2 + 0 0 8+56 0+00 1+00 2 + 0 0 3+00 4+00 5+00 6+00 7+00 8+00 PROPOSED PARK ACCESS EXISTING WETLAND B IMPACT (0.013 AC). FLOODPLAIN BENCH AND TRAIL GRADING. JURISDICTIONAL DITCH 2 IMPACT (128 LF). FLOODPLAIN BENCH GRADING. JURISDICTIONAL SWALE 1 IMPACT (442 LF). BIORETENTION GRADING. Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - G r a d i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 3. 2 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Gr a d i n g P l a n Cross-Section B 0'40'80'120' (HORIZONTAL) 0'4'8'12' (VERTICAL) Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 3.4 SHEET 3.3 SHEET 3.2 SHEET 3.1 NOTE: CONTRACTOR RESPONSIBLE FOR ROUGH GRADING OF WALKING TRAIL TO GRADES SHOWN HEREIN. FINISH ASPHALT TOPDRESSING TO BE COMPLETED BY OTHERS. 1032 1035 1040 1045 1032 1035 1040 1045 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+20 PROPOSED ASPHALT WALKING TRAIL EXISTING GRADE PROPOSED GRADE PROPOSED ASPHALT WALKING TRAIL C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE >>>> > > > >>>>>> > > >> > > 1 0 4 5 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1 0 5 5 1 0 4 0 1040 10 4 0 1 0 5 5 1 0 5 5 1 0 6 5 106 0 E A S T P R O N G H U N T I N G C R E E K E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N EXISTING ASPHALT WALKING TRAIL TO BE REMOVED PROPOSED ASPHALT WALKING TRAIL BY OTHERS 1 0 4 0 1 0 4 0 10 4 0 104 0 1 0 4 0 10 4 0 10 4 0 104 0 CROSS -SECTION C 0+00 1+00 2 + 0 0 3+00 4+00 5+00 6+0 0 7+00 8+00 8+20 205+ 0 0 20 6 + 0 0 2 0 7 + 0 0 208+ 0 0 20 9 + 0 0 210 + 0 0 21 1 + 0 0 1 1 1 + 0 0 11 2 + 0 0 1 1 3 + 0 0 114+00 1 1 5 + 0 0 1 1 6 + 0 0 1 1 7 + 0 0 11 8 + 0 0 PROPOSED PARK ACCESS PROPOSED PARK ACCESS JURISDICTIONAL DITCH 1 IMPACT (82 LF). FLOODPLAIN BENCH GRADING. EXISTING WETLAND C TO BE PROTECTED Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - G r a d i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 3. 3 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Gr a d i n g P l a n Cross-Section C 0'40'80'120' (HORIZONTAL) 0'4'8'12' (VERTICAL) Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 3.4 SHEET 3.3 SHEET 3.2 SHEET 3.1 NOTE: CONTRACTOR RESPONSIBLE FOR ROUGH GRADING OF WALKING TRAIL TO GRADES SHOWN HEREIN. FINISH ASPHALT TOPDRESSING TO BE COMPLETED BY OTHERS. 1028 1030 1035 1040 1028 1030 1035 1040 0+00 0+50 1+00 1+50 2+00 2+50 2+81 EXISTING GRADE PROPOSED GRADE EXISTING 8" DIP WATER LINE IE: 1033.7 CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CE > > > > > > 10 4 0 1 0 5 5 104 5 1040 104 0 1 0 4 5 1 0 5 0 1 0 6 0 1040 10 4 0 10 4 0 1 0 5 5 1 0 5 5 1 0 6 5 106 0 E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N EAST P R O N G H U N T I N G C R E E K FID D L E R S R U N BETHEL ROAD EXISTING SIDEWALK TO BE REMOVED PROPOSED ASPHALT WALKING TRAIL BY OTHERS 10 4 0 104 0 104 0 CROSS - S E C T I O N D EXISTING PARKING LOT TO REMAIN 0+00 1+00 2+00 2+81 213 + 4 2 210 + 0 0 21 1 + 0 0 21 2 + 0 0 213+ 0 0 121+21 1 1 7 + 0 0 11 8 + 0 0 119+0 0 1 2 0 + 0 0 12 1 + 0 0 PROPOSED PARK ACCESS JURISDICTIONAL DITCH 1 IMPACT (82 LF). FLOODPLAIN BENCH GRADING. Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - G r a d i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 3. 4 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Gr a d i n g P l a n Cross-Section D 0'40'80'120' (HORIZONTAL) 0'4'8'12' (VERTICAL) FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K Sheet Index SHEET 3.4 SHEET 3.3 SHEET 3.2 SHEET 3.1 NOTE: CONTRACTOR RESPONSIBLE FOR ROUGH GRADING OF WALKING TRAIL TO GRADES SHOWN HEREIN. FINISH ASPHALT TOPDRESSING TO BE COMPLETED BY OTHERS. CE CE C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E CE CE CE CE CE CE CE CE C E C E C E C E C E C E CE CE C E C E C E CECECE CE CE CE CE CE CE CE CE C E C E C E CE CE SHEET 4.1 & SHEET 4.2 SHEET 4.3 & SHEET 4.4 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P a r k D r a i n a g e P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 4. 0 08 . 3 1 . 2 0 2 3 0'100'200'300' (HORIZONTAL) N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pa r k D r a i n a g e P l a n E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N BETHE L R O A D SWALE 1 SWALE 2 SWALE 3 SWALE 4 1035 1040 1045 1050 1035 1040 1045 1050 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 4+88 PROPOSED GRADE C E C E C E CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E CE CE CE CE C E C E C E CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E CE CE CE CE 1 0 4 5 10 4 5 10 4 5 1045 1045 10 4 0 1 0 4 5 E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N 104 0 1045 1 0 4 0 10 4 0 1 0 4 0 200 + 0 0 2 0 1 + 0 0 2 0 2 + 0 0 203 + 0 0 2 0 4 + 0 0 205+ 0 0 105 + 0 0 106 + 0 0 1 0 7 + 0 0 10 8 + 0 0 1 0 9 + 0 0 11 0 + 0 0 1 1 1 + 0 0 11 2 + 0 0 0+ 0 0 0+ 0 0 0+ 0 0 1+ 0 0 2 + 0 0 3 + 0 0 4+00 4+88 0 + 0 0 1+00 2+ 0 0 2+ 3 3 >0+00 0+55 > 0+ 0 0 0+ 4 7 SWALE 1 SWALE 1 TYPICAL SECTION SWALE 2 SWALE 2 TYPICAL SECTION 1 0 4 5 1045 1 0 4 5 1042 1045 1042 1045 0+00 0+50 0+55 PROPOSED GRADE Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P a r k D r a i n a g e P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 4. 1 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pa r k D r a i n a g e P l a n Swale 1 Profile 0'40'80'120' (HORIZONTAL) 0'4'8 12' (VERTICAL) Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 4.1 & SHEET 4.2 Swale 1 Typical Section Swale 1 Profile and Plan View Scale Swale 1 Typical Section Scale 0'10'20'30' (HORIZONTAL) 0'1'2'3' (VERTICAL) SHEET 4.3 & SHEET 4.4 1043 1045 1043 1045 0+00 0+47 PROPOSED GRADE 1035 1040 1045 1050 1035 1040 1045 1050 0+00 0+50 1+00 1+50 2+00 2+33 PROPOSED GRADE C E C E C E CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E CE CE CE CE C E C E C E CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E CE CE CE CE 1 0 4 5 10 4 5 10 4 5 1045 1045 10 4 0 1 0 4 5 E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N 104 0 1045 1 0 4 0 10 4 0 1 0 4 0 200 + 0 0 2 0 1 + 0 0 2 0 2 + 0 0 203 + 0 0 2 0 4 + 0 0 205+ 0 0 105 + 0 0 106 + 0 0 1 0 7 + 0 0 10 8 + 0 0 1 0 9 + 0 0 11 0 + 0 0 1 1 1 + 0 0 11 2 + 0 0 0+ 0 0 0+ 0 0 0+ 0 0 1+ 0 0 2 + 0 0 3 + 0 0 4+00 4+88 0 + 0 0 1+00 2+ 0 0 2+ 3 3 >0+00 0+55 > 0+ 0 0 0+ 4 7 SWALE 1 SWALE 1 TYPICAL SECTION SWALE 2 SWALE 2 TYPICAL SECTION 1 0 4 5 1045 1 0 4 5 Swale 2 Profile 0'40'80'120' (HORIZONTAL) 0'4'8 12' (VERTICAL) Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 4.1 & SHEET 4.2 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P a r k D r a i n a g e P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 4. 2 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pa r k D r a i n a g e P l a n Swale 2 Typical Section Swale 2 Profile and Plan View Scale Swale 2 Typical Section Scale 0'10'20'30' (HORIZONTAL) 0'1'2'3' (VERTICAL) SHEET 4.3 & SHEET 4.4 C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE 1 0 4 5 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1 0 5 5 1 0 4 0 1040 10 4 0 1 0 5 5 1 0 5 5 1 0 6 5 106 0 E A S T P R O N G H U N T I N G C R E E K E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N 1 0 4 0 1 0 4 0 10 4 0 104 0 1 0 4 0 10 4 0 10 4 0 104 0 205+ 0 0 20 6 + 0 0 2 0 7 + 0 0 208+ 0 0 20 9 + 0 0 210 + 0 0 21 1 + 0 0 1 1 1 + 0 0 11 2 + 0 0 1 1 3 + 0 0 114+00 1 1 5 + 0 0 1 1 6 + 0 0 1 1 7 + 0 0 11 8 + 0 0 0+ 0 0 1+ 0 0 2 + 0 0 3+ 0 0 4+0 0 4+3 0 0+ 0 0 1 + 0 0 2 + 0 0 3 + 0 0 4 + 0 0 4 + 5 5 0+ 0 0 0+00 0+41 0+00 0+42 PROPOSED PARK ACCESS SWALE 3 SWALE 3 TYPICAL SECTION SWALE 4 SWALE 4 TYPICAL SECTION 1040 1040 0+00 0+41 PROPOSED GRADE 1035 1040 1045 1050 1035 1040 1045 1050 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+30 PROPOSED GRADE Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P a r k D r a i n a g e P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 4. 3 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pa r k D r a i n a g e P l a n Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 0'40'80'120' (HORIZONTAL) 0'4'8 12' (VERTICAL) N Swale 3 Profile and Plan View Scale Swale 3 Typical Section Scale 0'10'20'30' (HORIZONTAL) 0'1'2'3' (VERTICAL) Swale 3 Profile Swale 3 Typical Section SHEET 4.1 & SHEET 4.2 SHEET 4.3 & SHEET 4.4 C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE 1 0 4 5 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1 0 5 5 1 0 4 0 1040 10 4 0 1 0 5 5 1 0 5 5 1 0 6 5 106 0 E A S T P R O N G H U N T I N G C R E E K E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N 1 0 4 0 1 0 4 0 10 4 0 104 0 1 0 4 0 10 4 0 10 4 0 104 0 205+ 0 0 20 6 + 0 0 2 0 7 + 0 0 208+ 0 0 20 9 + 0 0 210 + 0 0 21 1 + 0 0 1 1 1 + 0 0 11 2 + 0 0 1 1 3 + 0 0 114+00 1 1 5 + 0 0 1 1 6 + 0 0 1 1 7 + 0 0 11 8 + 0 0 0+ 0 0 1+ 0 0 2 + 0 0 3+ 0 0 4+0 0 4+3 0 0+ 0 0 1 + 0 0 2 + 0 0 3 + 0 0 4 + 0 0 4 + 5 5 0+ 0 0 0+00 0+41 0+00 0+42 PROPOSED PARK ACCESS SWALE 3 SWALE 3 TYPICAL SECTION SWALE 4 SWALE 4 TYPICAL SECTION 1040 1040 0+00 0+42 PROPOSED GRADE 1035 1040 1045 1050 1035 1040 1045 1050 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 4+68 PROPOSED GRADE Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P a r k D r a i n a g e P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 4. 4 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pa r k D r a i n a g e P l a n Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K 0'40'80'120' (HORIZONTAL) 0'4'8 12' (VERTICAL) N Swale 4 Profile and Plan View Scale Swale 4 Typical Section Scale 0'10'20'30' (HORIZONTAL) 0'1'2'3' (VERTICAL) Swale 4 Profile Swale 4 Typical Section SHEET 4.1 & SHEET 4.2 SHEET 4.3 & SHEET 4.4 O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E O H E O H E O H E O H E O H E O H E S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S X X X X X X X X X X X X XX X OUE OUE OUEOUEOUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE O U E O U E O U E O U E O U E O U E O U E O U E O U E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E O U E O U E O U E O U E O U E O U E O U E O U E SHEET 5.1 SHEET 5.2 SHEET 5.3 SHEET 5.4 LOD L O D LO D L O D L O D L O D L O D LOD L O D L O D L O D L O D L O D LO D LO D LODLODLO D LO D LO D LO D LO D LOD LOD LO D LO D LO D LO D LO D L O D L O D LO D LO D LOD LOD LOD LOD LOD LOD L O D L O D LO D L O D LO D LO D LOD LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LO D LO D LOD LOD LO D [ X ] [X][X][X] [ X ] [ X ] [X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [X ] [X ] [X ] [X ] [X ] [ X ] [ X ] [X ] [X] [X] [X] [X ] [ X ] [X ] [X ] [X ] [X] [X ] [X ] [X ] [X] [X] [X] [ X ] [ X ] [ X ] [X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [X ] [X ] [X ] [X ] [X ] [X ] [X] [X ] [X] [X] [X] [ X ] [ X ] Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 1 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 0 08 . 3 1 . 2 0 2 3 0'100'200'300' (HORIZONTAL) N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 1 - P e r i m e t e r C o n t r o l E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N BETHE L R O A D LIMITS OF DISTURBANCE = 23.7 ACRES 1075 10 7 0 1065 1060 1065 1060 1055 1050 1045 104 5 1045 10 4 5 10 4 5 104 5 1045 1045 1045 1 0 4 5 1 0 4 5 OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E SS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS SS SS SS SS SS X X X X X X X X X X X X X X X X X X X X X X X X XXXXX X X X X X X X X OUE OUE OUEOUEOUE OUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE LOD L O D LO D LOD LOD LOD L O D LOD LOD LOD L O D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LODLODLODLOD LOD LOD LOD LO D LO D LO D LO D LO D L O D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LO D LO D LO D LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LODLOD [X] [X] [X] [X][X][X][X][X][X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X][X][X] [X] [X][X] [X] [X ] [X][X][X] [X] [X] [X] [ X ] [ X ] [X] [X] [X ] [X ] [X] [X] [X ] [X ] [X ] [X ] [X ] [X] [X] [X] [X][X] CHECK DAM (TYP) SILT FENCE (TYP) STOCKPILE AREA (TYP) LIMITS OF DISTURBANCE STAGING/STOCKPILE AREA EAST PRONG H U N T I N G C R E E K Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 1 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 1 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a 0'40'80'120' (HORIZONTAL) Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 5.2 SHEET 5.1 SHEET 5.3 SHEET 5.4 Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 1 - P e r i m e t e r C o n t r o l 1045 1045 1050 1060 1055 1040 1 0 4 0 10 4 0 1045 1050 1060 1 0 4 0 1040 1040 1055 1055 1065 10 6 0 OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHE SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS X X X X X X X X X OU E O U E OU E OU E OU E OU E OU E OU E OU E OUEOUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D L O D L O D [X][X] [X] [X ] [X ] [X ] [X ] [X ] [X ] [ X ] [X] [X] [X][X][X] [X] [X] [X] [X] [X] [X] [X ] [ X ] [X] [X] [ X ] [ X ] [X ] [X ] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X][X][X] [X] [X] [X] [X] [X][X][X] [X] [X] SILT FENCE (TYP) STAGING/STOCKPILE AREA LIMITS OF DISTURBANCE TURBIDITY CURTAIN EAST P R O N G H U N T I N G C R E E K BE T H E L R D Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 1 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 2 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 1 - P e r i m e t e r C o n t r o l Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 5.2 SHEET 5.1 SHEET 5.3 SHEET 5.4 N 0'40'80'120' (HORIZONTAL) 1075 10 7 0 1065 1060 1055 1065 1060 1055 1045 1 0 4 5 104 0 S S S S S S S S S S SS SS SS SS SS SS SS SS SS X LOD LOD LODLOD LOD LOD LOD LOD L O D LODLOD LOD LO D LO D LO D LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LOD LOD LOD LOD LO D LO D LOD LO D LO D LO D LODLOD [X ] [X][X][X][X] [X ] [X] [X] [X] [X] [X][X][X] [X] [X][X][X] LIMITS OF DISTURBANCE SILT FENCE (TYP) FI D D L E R S R U N 10 4 5 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 1 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 3 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 5.2 SHEET 5.1 SHEET 5.3 SHEET 5.4 N 0'40'80'120' (HORIZONTAL) Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 1 - P e r i m e t e r C o n t r o l 104 0 104 0 1 0 4 5 1 0 4 0 10 4 0 1 0 4 0 1040 OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OH E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSS SS SS OUE OUE OUEOUEOUEOUEOUEOUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE OUE OUE OUE O U E O U E O U E O U E O U E OU E O U E OU E OU E OU E OU E LO D LO D LO D LO D LO D L O D L O D LO D L O D L O D L O D LO D LODLODLOD LO D LODLOD L O D L O D L O D LOD LOD L O DLODLODLOD LOD LODLOD LOD LOD LOD LO D LO D LOD LOD [X ] [X ] [X ] [X ] [X ] [X ] [ X ] [X] [X] [X][X][X] [X] [X] [X] [X] [X][X][X] [X] [X][X] [X] [X] [X] [X ] [X][X][X] [X ] [X ] [X ] [X][X] [X] [X][X][X][X][X][X] [X] [X][X] [X][X][X][X] [X][X][X][X] [ X ] [ X ] [X] [X] [ X ] [ X ] [X ] [X ] [X] [X] [X] [X] [X] [X] LIMITS OF DISTURBANCE SILT FENCE (TYP) STOCKPILE AREA (TYP) TURBIDITY CURTAIN FIDDLERS RUN BE T H E L R D Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 1 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 4 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 5.2 SHEET 5.1 SHEET 5.3 SHEET 5.4 N 0'40'80'120' (HORIZONTAL) Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 1 - P e r i m e t e r C o n t r o l O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E O H E O H E O H E O H E O H E O H E S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S X X X X X X X X X X X X XX X OUE OUE OUEOUEOUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE O U E O U E O U E O U E O U E O U E O U E O U E O U E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E O U E O U E O U E O U E O U E O U E O U E O U E 1 0 7 5 107 0 1 0 6 5 10 6 0 10 5 5 10 6 5 1 0 6 0 1 0 5 5 1 0 5 0 1 0 4 5 1 0 4 5 1 0 4 5 10451045 1 0 4 5 1 0 4 5 10 4 5 10 4 5 1045 1045 10 4 0 1 0 4 5 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1 0 5 5 1 0 4 0 104 5 1040 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1040 10 4 0 10 4 0 1 0 5 5 1 0 5 5 1 0 6 5 106 0 SHEET 5.6 SHEET 5.7 SHEET 5.8 SHEET 5.9 LOD L O D LO D L O D L O D L O D L O D LOD L O D L O D L O D L O D L O D LO D LO D LODLODLO D LO D LO D LO D LO D LOD LOD LO D LO D LO D LO D LO D L O D L O D LO D LO D LOD LOD LOD LOD LOD LOD L O D L O D LO D L O D LO D LO D LOD LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LO D LO D LOD LOD LO D [ X ] [X][X][X] T T T C T [ X ] [ X ] [X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [X ] [X ] [X ] [X ] [X ] [ X ] [ X ] [X ] [X] [X] [X] [X ] [ X ] [X ] [X ] [X ] [X] [X ] [X ] [X ] [X] [X] [X] [ X ] [ X ] [ X ] [X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [X ] [X ] [X ] [X ] [X ] [X ] [X] [X ] [X] [X] [X] [ X ] [ X ] [ X ] [X ] [X ] [ X ] [X ] [X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [X ] [X ] [X ] [X ] [X] [X ] Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 2 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 5 08 . 3 1 . 2 0 2 3 0'100'200'300' (HORIZONTAL) N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 2 - S t r e a m C o n s t r u c t i o n E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N BETHE L R O A D LIMITS OF DISTURBANCE = 23.7 ACRES OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E SS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS SS SS SS SS SS X X X X X X X X X X X X X X X X X X X X X X X X XXXXX X X X X X X X X OUE OUE OUEOUEOUE OUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE 1075 10 7 0 1065 1060 1065 1060 1055 1050 1045 104 5 1045 10 4 5 10 4 5 104 5 1045 1045 1045 1 0 4 5 1 0 4 5 LOD L O D LO D LOD LOD LOD L O D LOD LOD LOD L O D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LODLODLODLOD LOD LOD LOD LO D LO D LO D LO D LO D L O D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LO D LO D LO D LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LODLOD T [X] [X] [X] [X][X][X][X][X][X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X][X][X] [X] [X][X] [X] [X ] [X][X][X] [X] [X] [X] [ X ] [ X ] [X] [X] [X ] [X ] [X] [X] [X ] [X ] [X ] [X ] [X ] [X] [X] [X] [X][X] [X][X][X] [X] [X] [ X ] [X ] [X] [X][X][X] [X] [X] [ X ] [ X ] [X] [X][X] [X] [X] [X] [X] [X] [X] [X][X][X] SILT FENCE (TYP) STOCKPILE AREA (TYP) LIMITS OF DISTURBANCE (TYP) STAGING/STOCKPILE AREA EAST PRONG H U N T I N G C R E E K TEMPORARY STREAM CROSSING - TIMBER MAT (TYP) CHECK DAM (TYP) CHANNEL PLUG (TYP) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 2 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 6 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a 0'40'80'120' (HORIZONTAL) Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 5.7 SHEET 5.6 SHEET 5.8 SHEET 5.9 Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 2 - S t r e a m C o n s t r u c t i o n OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHE SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS X X X X X X X X X OU E O U E OU E OU E OU E OU E OU E OU E OU E OUEOUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE 1045 1045 1050 1060 1055 1040 1 0 4 0 10 4 0 1045 1050 1060 1 0 4 0 1040 1040 1055 1055 1065 10 6 0 LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D L O D L O D [X][X] [X] [X ] [X ] [X ] [X ] [X ] [X ] [ X ] [X] [X] C [X][X][X] [X] [X] [X] [X] [X] [X] [X ] [ X ] [X] [X] [ X ] [ X ] [X ] [X ] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X] [X][X][X] [X] [X] [X] [X] [X][X][X] [X] [X] [X] [X] [X] [X] [X] [X][X] [X] [X] [X][X] [X] [X] [X] [X] [X][X] [X] [X] [X ] [X ] [X] [X] [X ] [X ] [X] [ X ] [X] [X] SILT FENCE (TYP) STAGING/STOCKPILE AREA LIMITS OF DISTURBANCE (TYP) TURBIDITY CURTAIN (TYP) EAST P R O N G H U N T I N G C R E E K BE T H E L R D TEMPORARY STREAM CROSSING - CULVERT (TYP) CHECK DAM (TYP) CHANNEL PLUG (TYP) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 2 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 7 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 2 - S t r e a m C o n s t r u c t i o n Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K N 0'40'80'120' (HORIZONTAL) SHEET 5.7 SHEET 5.6 SHEET 5.8 SHEET 5.9 S S S S S S S S S S SS SS SS SS SS SS SS SS SS X 1075 10 7 0 1065 1060 1055 1065 1060 1055 1045 1 0 4 5 104 0 LOD LOD LODLOD LOD LOD LOD LOD L O D LODLOD LOD LO D LO D LO D LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LOD LOD LOD LOD LO D LO D LOD LO D LO D LO D LODLOD T [X ] [X][X][X][X] [X ] [X] [X] [X] [X] [X][X][X] [X] [X][X][X] [X ] [X] [X] [X] [X] [X] [X] [X] [X] [X] LIMITS OF DISTURBANCE (TYP) SAFETY FENCE (TYP) SILT FENCE (TYP) FIDDLERS RUN TEMPORARY STREAM CROSSING - TIMBER MAT (TYP) CHECK DAM (TYP) CHANNEL PLUG (TYP) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 2 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 8 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K N 0'40'80'120' (HORIZONTAL) Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 2 - S t r e a m C o n s t r u c t i o n SHEET 5.7 SHEET 5.6 SHEET 5.8 SHEET 5.9 OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OH E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSS SS SS OUE OUE OUEOUEOUEOUEOUEOUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE OUE OUE OUE O U E O U E O U E O U E O U E OU E O U E OU E OU E OU E OU E 104 0 104 0 1 0 4 5 1 0 4 0 10 4 0 1 0 4 0 1040 LO D LO D LO D LO D LO D L O D L O D LO D L O D L O D L O D LO D LODLODLOD LO D LODLOD L O D L O D L O D LOD LOD L O DLODLODLOD LOD LODLOD LOD LOD LOD LO D LO D LOD LOD [X ] [X ] [X ] [X ] [X ] [X ] [ X ] [X] [X] T T [X][X][X] [X] [X] [X] [X] [X][X][X] [X] [X][X] [X] [X] [X] [X ] [X][X][X] [X ] [X ] [X ] [X][X] [X] [X][X][X][X][X][X] [X] [X][X] [X][X][X][X] [X][X][X][X] [ X ] [ X ] [X] [X] [ X ] [ X ] [X ] [X ] [X] [X] [X] [X] [X] [X] [X] [X ] [X ] [X] [X] [X ] [X] [X] [X] [ X ] [X ] [X][X] [X] [X] [X] [ X ] [X] [X] [X] [X ] [X] [ X ] [X] [X] LIMITS OF DISTURBANCE (TYP) SILT FENCE (TYP) STOCKPILE AREA (TYP) TURBIDITY CURTAIN (TYP) FIDDLERS RUN BE T H E L R D TEMPORARY STREAM CROSSING - TIMBER MAT (TYP) CHECK DAM (TYP) CHANNEL PLUG (TYP) Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 2 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 9 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K N 0'40'80'120' (HORIZONTAL) Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 2 - S t r e a m C o n s t r u c t i o n SHEET 5.7 SHEET 5.6 SHEET 5.8 SHEET 5.9 O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E O H E O H E O H E O H E O H E O H E S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S S X X X X X X X X X X X X XX X OUE OUE OUEOUEOUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE O U E O U E O U E O U E O U E O U E O U E O U E O U E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E O U E O U E O U E O U E O U E O U E O U E O U E 1 0 7 5 107 0 1 0 6 5 10 6 0 10 5 5 10 6 5 1 0 6 0 1 0 5 5 1 0 5 0 1 0 4 5 1 0 4 5 1 0 4 5 10451045 1 0 4 5 1 0 4 5 10 4 5 10 4 5 1045 1045 10 4 0 1 0 4 5 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1 0 5 5 1 0 4 0 104 5 1040 10 4 0 1 0 4 5 1 0 5 0 1 0 6 0 1040 10 4 0 10 4 0 1 0 5 5 1 0 5 5 1 0 6 5 106 0 SHEET 5.11 SHEET 5.12 SHEET 5.13 SHEET 5.14 LOD L O D LO D L O D L O D L O D L O D LOD L O D L O D L O D L O D L O D LO D LO D LODLODLO D LO D LO D LO D LO D LOD LOD LO D LO D LO D LO D LO D L O D L O D LO D LO D LOD LOD LOD LOD LOD LOD L O D L O D LO D L O D LO D LO D LOD LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LO D LO D LOD LOD LO D [ X ] [X][X][X] C T [ X ] [ X ] [X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [X ] [X ] [X ] [X ] [X ] [ X ] [ X ] [X ] [X] [ X ] [X ] [X ] [ X ] [X ] [X ] [ X ] [ X ] [ X ] [ X ] [ X ] [ X ] [X ] [X ] [X ] [X ] [X] [X ] Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 3 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 1 0 08 . 3 1 . 2 0 2 3 0'100'200'300' (HORIZONTAL) N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 3 - P a r k I m p r o v e m e n t s E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N BETHE L R O A D LIMITS OF DISTURBANCE = 23.7 ACRES OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E SS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS SS SS SS SS SS X X X X X X X X X X X X X X X X X X X X X X X X XXXXX X X X X X X X X OUE OUE OUEOUEOUE OUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE 1075 10 7 0 1065 1060 1065 1060 1055 1050 1045 104 5 1045 10 4 5 10 4 5 104 5 1045 1045 1045 1 0 4 5 1 0 4 5 LOD L O D LO D LOD LOD LOD L O D LOD LOD LOD L O D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LODLODLODLOD LOD LOD LOD LO D LO D LO D LO D LO D L O D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LO D LO D LO D LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LODLOD T [X] [X] [X] [X][X][X][X][X][X] [X] [X] [X] [X] [X] [X][X][X] [X] [X] [ X ] [X ] [X] [X][X][X] [X] [X] [ X ] [ X ] [X] [X][X] [X] [X] [X] [X] [X] [X] [X][X][X] STOCKPILE AREA (TYP) LIMITS OF DISTURBANCE STAGING/STOCKPILE AREA EAST PRONG H U N T I N G C R E E K TEMPORARY STREAM CROSSING - TIMBER MAT (TYP) CHANNEL PLUG (TYP) DIVERSION BERM Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 3 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 1 1 08 . 3 1 . 2 0 2 3 N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a 0'40'80'120' (HORIZONTAL) Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 5.12 SHEET 5.11 SHEET 5.13 SHEET 5.14 Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 3 - P a r k I m p r o v e m e n t s OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHE SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS X X X X X X X X X OU E O U E OU E OU E OU E OU E OU E OU E OU E OUEOUEOUEOUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE OUE 1045 1045 1050 1060 1055 1040 1 0 4 0 10 4 0 1045 1050 1060 1 0 4 0 1040 1040 1055 1055 1065 10 6 0 LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D L O D L O D [X][X] [X] [X ] [X ] [X ] [X ] [X ] [X ] [ X ] [X] [X] [X][X][X] [X] [X] [X] [X] [X] [X] [X ] [X] [X] [X] [X] [X] [X][X] [X] [X] [X][X] [X] [X] [X] [X] [X][X] [X] [X] [X ] [X ] [X] [X] [X ] [X ] [X] [ X ] [X] [X] STAGING/STOCKPILE AREA LIMITS OF DISTURBANCE TURBIDITY CURTAIN EAST P R O N G H U N T I N G C R E E K BE T H E L R D CHANNEL PLUG (TYP) DIVERSION BERM Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 3 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 1 2 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 3 - P a r k I m p r o v e m e n t s Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K N 0'40'80'120' (HORIZONTAL) SHEET 5.12 SHEET 5.11 SHEET 5.13 SHEET 5.14 S S S S S S S S S S SS SS SS SS SS SS SS SS SS X 1075 10 7 0 1065 1060 1055 1065 1060 1055 1045 1 0 4 5 104 0 LOD LOD LODLOD LOD LOD LOD LOD L O D LODLOD LOD LO D LO D LO D LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LOD LOD LOD LOD LO D LO D LOD LO D LO D LO D LODLOD [X ] [X][X][X][X] [X ] [X] [X] [X] [X] [X] [X] [X] [X] [X] LIMITS OF DISTURBANCE FIDDLERS RUN CHANNEL PLUG (TYP) DIVERSION BERM Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 3 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 1 3 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K N 0'40'80'120' (HORIZONTAL) Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 3 - P a r k I m p r o v e m e n t s SHEET 5.12 SHEET 5.11 SHEET 5.13 SHEET 5.14 OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OH E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSS SS SS OUE OUE OUEOUEOUEOUEOUEOUE OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OU E OUE OUE OUE OUE OUE OUE OUE O U E O U E O U E O U E O U E OU E O U E OU E OU E OU E OU E 104 0 104 0 1 0 4 5 1 0 4 0 10 4 0 1 0 4 0 1040 LO D LO D LO D LO D LO D L O D L O D LO D L O D L O D L O D LO D LODLODLOD LO D LODLOD L O D L O D L O D LOD LOD L O DLODLODLOD LOD LODLOD LOD LOD LOD LO D LO D LOD LOD [X ] [X ] [X ] [X ] [X ] [X ] [ X ] [X] [X] [X][X][X] [X] [X] [X] [X] [X][X][X] [X] [X][X] [X] [X] [X] [X ] [X][X][X] [X ] [X ] [X ] [X] [X ] [X ] [X] [X] [X ] [X] [X] [X] [ X ] [X ] [X][X] [X] [X] [X] [ X ] [X] [X] [X] [X ] [X] [ X ] [X] [X] LIMITS OF DISTURBANCE STOCKPILE AREA (TYP) TURBIDITY CURTAIN FIDDLERS RUN BE T H E L R D CHANNEL PLUG (TYP) DIVERSION BERM Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - E r o s i o n a n d S e d i m e n t C o n t r o l P l a n - P h a s e 3 . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 5. 1 4 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K N 0'40'80'120' (HORIZONTAL) Er o s i o n & S e d i m e n t C o n t r o l P l a n - P h a s e 3 - P a r k I m p r o v e m e n t s SHEET 5.12 SHEET 5.11 SHEET 5.13 SHEET 5.14 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n t i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 6. 0 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pl a n t i n g T a b l e s Floodplain Bench Planting Zone #2 Bare Root Species Common Name Spacing Stratum % of Stems Wetland Indicator Status Lindera benzoin Northern Spicebush 12'Shrub 15%FAC Itea virginica Virginia Sweetspire 12'Shrub 10%OBL Vaccinium corymbosum Highbush Blueberry 12'Shrub 15%FACW Viburnum dentatum Arrowwood Viburnum 12'Shrub 15%FAC Calycanthus floridus Sweetshrub 12'Shrub 15%FAC Ilex vertcillata Winterberry 12'Shrub 15%FACW Hamamelis virginiana Witchhazel 12'Shrub 15%FACU 100% Streambank Planting Zone Live Stakes Species Common Name Indiv. Spacing Stratum % of Stems Wetland Indicator Status Cornus amomum Silky Dogwood 5'Shrub 35%FACW Salix sericea Silky Willow 5'Shrub 25%OBL Cephalanthus occidentalis Buttonbush 5'Shrub 25%FACW Sambucus canadensis Elderberry 5'Shrub 15%FACW 100% Herbaceous Plugs Juncus effusus Common Rush 3'Herb 35%- Carex vulpinoidea Fox Sedge 3'Herb 20%- Carex lurida Shallow Sedge 3'Herb 25%- Lobelia cardinalis Cardinalflower 3'Herb 20%- 100% Floodplain Bench Planting Zone #1 Bare Root (303 stems/ac) Species Common Name Spacing Stratum % of Stems Wetland Indicator Status Acer saccharinum Silver Maple 12'Tree 15%FACW Platanus occidentalis Sycamore 12'Tree 20%FACW Betula nigra River Birch 12'Tree 20%FACW Aesculus sylvatica Painted Buckeye 12'Shrub-Tree 10%FAC Calycanthus floridus Sweetshrub 12'Shrub 10%FAC Amelanchier arborea Downy Serviceberry 12'Tree 10%FAC Itea virginica Virginia Sweetspire 12'Shrub 5%OBL Viburnum dentatum Arrowwood Viburnum 12'Shrub 5%FAC Ilex vercillata Winterberry 12'Shrub 5%FACW 100% Planting Zones Notes: 1.Not all species of containerized plants listed above are intended for use. Select from the list above based on availability or preference to satisfy the number of plants as indicated on the plans. 2.Location and quantity to be determined by City Staff Seeding Bioretention Planting Zones Permanent Seed Mix (20 lbs/ac) Species Common Name Stratum Density (lbs/acre)Wetland Indicator Status Coreopsis tinctoria Golden Tickseed Herb 3.0 FAC Rudbeckia hirta Blackeyed Susan Herb 3.0 FACU Juncus tenuis Path Rush Herb 2.0 FAC Chamaecrista fasciculata Partridge Pea Herb 2.0 FACU Carex cherokeensis Cherokee Sedge Herb 2.0 FACW Pycnanthemum tenuifolium Narrowleaf Mountainmint Herb 2.0 FACW Conoclinium coelestinum Blue mistflower Herb 1.5 FAC Chasmanthium latifolium River Oats Herb 1.5 FACU Schizachyrium scoparium Little Bluestem Herb 1.5 FACU Panicum virgatum Switchgrass Herb 1.5 FAC Bioretention Herbaceous Plugs (2,723 plugs/ac) Species Common Name Spacing Stratum % of Stems Wetland Indicator Status Juncus effusus Common Rush 4'Herb 20%FACW Sisyrinchium angustifolium Blue-eyed grass 4'Herb 15%FACW Sagittaria latifolia Duck-potato 4'Herb 15%OBL Lobelia cardinalis Cardinalflower 4'Herb 15%FACW Pycnanthemum tenuifolium Narrowleaf Mountain mint 4'Herb 10%FACW Asclepias incarnata Swamp Milkweed 4'Herb 10%OBL Verbena hastata Blue Verbena 4'Herb 10%FACW Saururus cernuus Lizard's Tail 4'Herb 5%OBL 100% Temporary Seed Mix Pure Live Seed Species Common Name Density (lbs/ac)Approved Date Secale cereale Rye Grain 140 Sep 15 - April 1 Setaria italica German Millet 50 April 1 - Sep 15 Bioretention 5-Gallon Containerized Plants Species Common Name Spacing Stratum Number of Plants Wetland Indicator Status Lindera benzoin Northern Spicebush -Shrub 3 FAC Vaccinium corymbosum Highbush Blueberry -Shrub 2 FACW Viburnum dentatum Arrowwood Viburnum -Shrub 3 FAC Calycanthus floridus Sweetshrub -Shrub 3 FAC Ilex vertcillata Winterberry -Shrub 2 FACW Hamamelis virginiana Witchhazel -Shrub 2 FACU 15 Floodplain Bench Planting Zones Permanent Seed Mix (20 lbs/ac) Species Common Name Stratum Density (lbs/acre)Wetland Indicator Status Coreopsis tinctoria Golden Tickseed Herb 2.0 FAC Rudbeckia hirta Blackeyed Susan Herb 2.0 FACU Sisyrinchium angustifolium Blue-eyed grass Herb 1.5 FACW Juncus tenuis Path Rush Herb 1.5 FAC Juncus effusus Common Rush Herb 1.5 OBL Chamaecrista fasciculata Partridge Pea Herb 1.5 FACU Carex cherokeensis Cherokee Sedge Herb 1.5 FACW Pycnanthemum tenuifolium Narrowleaf Mountainmint Herb 1.5 FACW Helenium autumnale Sneezeweed Herb 1.5 FACW Carex crinita Fringed Sedge Herb 1.5 OBL Dichanthelium clandestinum Deer Tongue Herb 1.0 FAC Conoclinium coelestinum Blue mistflower Herb 1.0 FAC Chasmanthium latifolium River Oats Herb 1.0 FACU Schizachyrium scoparium Little Bluestem Herb 1.0 FACU Park/Bioswale Seed Mix Permanent Seed Mix (20 lbs/ac) Species Common Name Density (lbs/ac)Approved Date Notes: 1.Species will be presented in the Final Plans. CE CE C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE C E CE CE CE CE CE CE CE CE C E C E C E C E C E C E CE CE C E C E C E CECECE CE CE CE CE CE CE CE CE C E C E C E CE CE SHEET 6.2 SHEET 6.3 SHEET 6.4 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n t i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 6. 1 08 . 3 1 . 2 0 2 3 0'100'200'300' (HORIZONTAL) N Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pl a n t i n g P l a n O v e r v i e w E A S T P R O N G H U N T I N G C R E E K FI D D L E R S R U N BETHEL ROAD Streambank Planting Zone Floodplain Bench Planting Zone #1 Floodplain Bench Planting Zone #2 Bioswale Seeding Zone Bioretention Planting Zone Planting Zones X X X X X X X XXXX X C E C E C E CE C E C E C E C E C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E CE CE C E C E C E C E CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E CE CE CE CE FID D L E R S R U N EA S T P R O N G H U N T I N G C R E E K 1 0 0 + 0 0 1 0 1 + 0 0 102 + 0 0 10 3 + 0 0 1 0 4 + 0 0 105 + 0 0 106 + 0 0 1 0 7 + 0 0 10 8 + 0 0 1 0 9 + 0 0 200 + 0 0 2 0 1 + 0 0 2 0 2 + 0 0 Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n t i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 6. 2 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pl a n t i n g P l a n Sheet IndexSheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 6.4 SHEET 6.3 SHEET 6.2 0'40'80'120' (HORIZONTAL) N CE C E CE C E C E C E CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE CE C E C E C E C E C E C E C ECE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E CE E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N 1 0 7 + 0 0 10 8 + 0 0 1 0 9 + 0 0 11 0 + 0 0 1 1 1 + 0 0 11 2 + 0 0 1 1 3 + 0 0 11 4 + 0 0 1 1 5 + 0 0 1 1 6 + 0 0 200 + 0 0 2 0 1 + 0 0 2 0 2 + 0 0 203 + 0 0 2 0 4 + 0 0 205+ 0 0 20 6 + 0 0 2 0 7 + 0 0 208+ 0 0 20 9 + 0 0 PROPOSED PARK ACCESS Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n t i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 6. 3 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pl a n t i n g P l a n Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 6.4 SHEET 6.3 SHEET 6.2 0'40'80'120' (HORIZONTAL) N CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE CE C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E C E CE C E C E C E C E C E C E C E C E C E C E CECECECECECE CE CE CE CE CE CE CE CE CE CE CE E A S T P R O N G H U N T I N G C R E E K FID D L E R S R U N BETHEL ROAD 121+21 11 4 + 0 0 1 1 5 + 0 0 1 1 6 + 0 0 1 1 7 + 0 0 11 8 + 0 0 119+0 0 1 2 0 + 0 0 12 1 + 0 0 2 0 7 + 0 0 208+ 0 0 20 9 + 0 0 210 + 0 0 21 1 + 0 0 21 2 + 0 0 213+ 0 0 213 + 4 2 PROPOSED PARK ACCESS Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - P l a n t i n g P l a n . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 6. 4 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a Pl a n t i n g P l a n Sheet Index FI D D L E R S R U N E A S T P R O N G H U N T I N G C R E E K SHEET 6.4 SHEET 6.3 SHEET 6.2 0'40'80'120' (HORIZONTAL) N Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e t a i l s . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 7. 1 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De t a i l s Au g u s t 3 1 , 2 0 2 3 1 7.1 Native Material Riffle Not to Scale TOE OF SLOPE (TYP) Plan View Profile A-A'Section B-B' TOP OF BANK (TYP) RIFFLE INVERT PER PROFILE TOP OF BANK (TYP) HEAD OF RIFFLE ELEVATION POINT PER PROFILE TAIL OF RIFFLE ELEVATION POINT PER PROFILE LOCALLY MINED OR IMPORTED GRAVEL/COBBLE MIXTURE (NCDOT Stone Class A) SEE TYPICAL SECTIONS FOR RIFFLE SIDE SLOPES RIFFLE BOTTOM WIDTH PER TYPICAL SECTIONS SEE PROFILE FOR LENGTH OF RIFFLE 12" MIN. FLOW A A' B' B CR-NM NOTE: 1.SEE PROJECT SPECIFICATIONS FOR BED MATERIAL GRADATION Plan View Profile View A-A' Log Section B-B' A' 5' MIN. (TYP) Angled Log Riffle Not to Scale 2 7.1 1% - 2% 1/2 TO 2/3 BANKFULL NOTES: 1.ONSITE ENGINEER TO SPECIFY THE LOCATION AND QUANTITY OF LOGS. 2.LOGS SHALL BE HARVESTED FROM ON-SITE HARDWOOD TREES 12" IN DIAMETER OR GREATER, UNLESS OTHERWISE APPROVED BY ENGINEER. LOGS SHALL BE GENERALLY STRAIGHT AND FREE OF ROT. ALL LIMBS SHALL BE MECHANICALLY REMOVED PRIOR TO PLACEMENT AS SHOWN ON THE DETAIL. TOP OF BANK BURY INTO BANK 5' MIN BEYOND BANKFULL(TYP) 12" DIAMETER OR GREATER (TYP) FL O W 55° TO 65° (TYP)0.5' MAX.NORMAL WATER SURFACE TOP OF BANK NON-WOVEN FILTER FABRIC THALWEG FLOW LOCALLY MINED OR IMPORTED GRAVEL/COBBLE MIXTURE (NCDOT Mix of ABC, Class A and Class B) LOCALLY MINED OR IMPORTED GRAVEL/COBBLE MIXTURE (NDCOT Mix of ABC, Class A and Class B)TOE OF SLOPE BANKFULL B B' A' FL O W CR-ALR 0.3' - 0.5' EXCAVATE SMALL POOLS 0.3' DEEP DOWNSTREAM OF IMBEDDED LOGS PLACE LOG AT END OF RIFFLE Chunky Riffle Not to Scale TOE OF SLOPE (TYP) TOP OF BANK (TYP) Section A-A' Plan View Section B-B' A A' B B' VARIES PER BASEFLOW 0.3 - 0.5' 3" MAX 3 7.1 CLASS B STONE OR SALVAGED ONSITE BOULDERS MIN 0.5'x1'x1.5' TAIL OF RIFFLE ELEVATION POINT PER PROFILE HEAD OF RIFFLE ELEVATION POINT PER PROFILE TOP OF BANK (TYP) RIFFLE INVERT PER PROFILE CLASS B STONE OR SALVAGED ONSITE BOULDERS MIN 0.5'x1'x1.5' CLASS B STONE OR SALVAGED ONSITE BOULDERS MIN 0.5'x1'x1.5'LOCALLY MINED OR IMPORTED GRAVEL/COBBLE MIXTURE (NCDOT Stone Class A) SEE PROFILE FOR LENGTH OF RIFFLE CR-CH 12" MIN. FLOW LOCALLY MINED OR IMPORTED GRAVEL/COBBLE MIXTURE (NCDOT Stone Class A) THALWEG 0.3-0.5' DEEPER THAN REST OF RIFFLE TO PROVIDE LOW FLOW PATH V NOTCH 0.3'-0.5' DEEPER THAN REST OF RIFFLE TO PROVIDE LOW FLOW PATH V NOTCH 0.3'-0.5' DEEPER THAN REST OF RIFFLE TO PROVIDE LOW FLOW PATH Crayfish Glide Not to Scale 4 7.1 TOE OF SLOPE (TYP) TOP OF BANK (TYP) A A' TAIL OF RIFFLE ELEVATION POINT PER PROFILE SEE PROFILE FOR LENGTH OF GLIDE FLOW Profile View A-A' BED MATERIAL FLOW CRAYFISH HABITAT SLAB ROCKS. SEE NOTES. NOTE: 1.SLAB ROCKS SHALL BE A 2'x2', 2'x3', OR SOME EQUIVALENT VARIATION AT MINIMUM. SLAB ROCKS SHALL BE MINIMUM OF 2-3" THICK, BUT MAY BE MUCH LARGER. 2.STACK SLAB ROCKS IN THE GLIDE UPSTREAM OF THE POOL, BUT DOWNSTREAM OF THE RIFFLE INVERT, IN A LOCATION SUCH THAT THE CURRENT IS SWIFT ENOUGH TO PREVENT SEDIMENT DEPOSITION UNDER OR ON TOP OF SLAB ROCKS DURING A FLOOD EVENT. 3.TARGET 5 LARGER STACKED SLAB ROCK STRUCTURES PER SPECIFIED RIFFLE, OR 10-15 SMALLER SLAB ROCK STRUCTURES PER SPECIFIED RIFFLE IF LARGER ROCKS ARE UNAVAILABLE. 4.SLAB ROCKS ARE TO BE HAND SELECTED AND INSTALLED AS DIRECTED BY THE ENGINEER. NORMAL WATER SURFACE TOP OF BANK THALWEG CRAYFISH HABITAT SLAB ROCKS. SEE NOTES. Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e t a i l s . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 7. 2 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De t a i l s Au g u s t 3 1 , 2 0 2 3 1 7.2 Boulder Toe - East Prong Hunting Creek Not to Scale NOTES: 1.BOULDERS SHALL BE BLOCKY IN NATURE. RIPRAP IS NOT A PERMISSIBLE SUBSTITUTE FOR BOULDER TOE. 2.ALL BOULDERS SHALL BE MINIMUM OF 4.0' L x 3.0' W x 2.0' H FLOW A A' TOP O F B A N K ( T Y P ) TOE O F S L O P E ( T Y P ) TOE O F S L O P E ( T Y P ) TOP O F B A N K ( T Y P ) 0.5' NONWOVEN FILTER FABRIC Plan View Section A-A' HEADER ROCK(S) FOOTER ROCK TO BE BURIED 1' BELOW STREAM BED. BACKFILL MATERIAL WILL BE SOIL FREE OF STONE AND DEBRIS CONSISTING OF CLAY, CLAY LOAM, OR SANDY CLAY LOAM 1' NOTES: 1.OVEREXCAVATE 5' OUTSIDE OF TOP OF BANK (BANKFULL). 2.INSTALL BASE LOGS PARALLEL TO FLOW AT TOE OF SLOPE. DIAMETER 6"-12". 3.INSTALL BASE LOGS PERPENDICULAR TO FLOW AT INTERVALS ALONG BANK, RESTING ON TOP OF PARALLEL BASE LOGS. PARALLEL BASE LOGS SHALL BE 6"-12” DIAMETER. PERPENDICULAR BASE LOGS SHALL BE 4"-6" DIAMETER. 4.INSTALL A DENSE LAYER OF BRUSH/WOODY DEBRIS, WHICH SHALL CONSIST OF SMALL BRANCHES AND ROOTS COLLECTED ON-SITE AND SOIL TO FILL ANY VOID SPACE. LIGHTLY COMPACT BRUSH/WOODY DEBRIS LAYER. 5.BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLY PARALLEL AND INSTALLED POINTING SLIGHTLY UPSTREAM. 6.INSTALL COIR MATTING OVER BRUSH/WOODY DEBRIS AND BACKFILL LAYER. 7.INSTALL EARTH BACKFILL OVER BRUSH/WOODY LAYER ACCORDING TO TYPICAL SECTION DIMENSIONS. 8.SEED, MULCH AND INSTALL EROSION CONTROL MATTING AND BANK STABILIZATION PER PLANS. 9.ONSITE ENGINEER ENGINEER SHALL APPROVE SELECT WOODY DEBRIS PRIOR TO INSTALLATION. Plan View TOP OF BANK (BANKFULL) Section A-A' BASE LOG 4"-6" DIAMETER DENSELY PACKED BRUSH, WOODY DEBRIS AND SOIL COIR MATTING OR EQUIVALENT EROSION CONTROL MATTING. BACKFILL DENSELY PACK BRUSH, WOODY DEBRIS AND SOIL IN BETWEEN BASE LOGS BASE LOGS PERPENDICULAR TO FLOW TOE OF SLOPE 2' MIN 3' BRUSH MATERIAL TO BE INSTALLED WITH A MINIMUM OF 75% OF MATERIAL EMBEDDED INTO BANK FLOW A A' EROSION CONTROL MATTING TOP O F B A N K ( T Y P ) TOE O F S L O P E ( T Y P ) TOE O F S L O P E ( T Y P ) TOP O F B A N K ( T Y P ) BASE LOGS PARALLEL TO FLOW BACKFILL NATIVE SOIL BASE LOG 6-12" DIAMETERELEV. 6" BELOW CHANNEL BOTTOM ELEV. 1' ABOVE DOWNSTREAM RIFFLE INVERT WIDTH PER TYPICAL SECTIONS 6" Brush Toe Not to Scale 3 7.2 RIP RAP BEDDING TO BE BURIED 2' BELOW FOOTER ROCK 2 7.2 Boulder Toe - Fiddlers Run Not to Scale FLOW A A' TOP O F B A N K ( T Y P ) TOE O F S L O P E ( T Y P ) TOE O F S L O P E ( T Y P ) TOP O F B A N K ( T Y P ) 0.5' NONWOVEN FILTER FABRIC Plan View Section A-A' HEADER ROCK(S) FOOTER ROCK TO BE BURIED 1' BELOW STREAM BED. BACKFILL MATERIAL WILL BE SOIL FREE OF STONE AND DEBRIS CONSISTING OF CLAY, CLAY LOAM, OR SANDY CLAY LOAM 1' RIP RAP BEDDING TO BE BURIED 2' BELOW FOOTER ROCK NOTES: 1.BOULDERS SHALL BE BLOCKY IN NATURE. RIPRAP IS NOT A PERMISSIBLE SUBSTITUTE FOR BOULDER TOE. 2.ALL BOULDERS SHALL BE MINIMUM OF 4.0' L x 2.0' W x 2.0' H Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e t a i l s . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 7. 3 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De t a i l s Au g u s t 3 1 , 2 0 2 3 Profile View Plan View Section A - A' FLOW 1 7.3 Log Sill Not to Scale EXTEND FILTER FABRIC 5' MIN. UPSTREAM EMBED LOG 5' BEYOND BANKFULL (MIN.) EXCAVATED SCOUR POOL PER PROFILE SILL ELEVATION PER PROFILE SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL SUPPLEMENT WITH IMPORTED MATERIAL NON-WOVEN FILTER FABRIC SILL ELEVATION PER PROFILE (TYP) SILL ELEVATION PER PROFILE (TYP) FOOTER LOG HEADER LOG SCOUR POOL OFFSET HEADER LOG 0.25' TO 0.5' UPSTREAM OF FOOTER LOG EXCAVATE PER PROFILE Erosion Control Matting Not to Scale Section View Plan View 6" MIN. OVERLAP IN DOWNSTREAM DIRECTION AT MAT ENDS 2 7.3 12" 1.25" Eco-Stake NOTES: ·TOP ROW OF STAKES SHOULD FACE AWAY FROM THE STREAM. ·BOTTOM ROW OF STAKES SHOULD FACE TOWARDS THE STREAM. ·MIDDLE ROWS OF STAKES SHOULD FACE UPSTREAM. 3 7.3 Plan View Section B-B' Section A-A' B' B TOP OF BANK (TYP) TOE OF SLOPE (TYP) Log J-Hook Not to Scale Y FILTER FABRIC EXTENDS 5' MIN. H OFFSET HEADER LOG 0.25' TO 0.5' UPSTREAM OF FOOTER LOG SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL SUPPLEMENT WITH IMPORTED RIVER ROCK HEADER LOG FOOTER LOG HEADER LOG FOOTER LOG WOVEN FILTER FABRIC SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL SUPPLEMENT WITH IMPORTED RIVER ROCK PLACE HEADER BOULDER TO PREVENT LOG FROM SHIFTING. INVERT ELEVATION PER PROFILE EXCAVATE POOL PER PROFILE PLACE HEADER BOULDERS WITH 1' TO 2' CLEAR SPACE BETWEEN ROCKS. NO GAP BETWEEN FOOTERS Fiddlers Run East Prong Hunting Creek H (FT)1.3 1.8 X (FT)21 28 Y (FT)4.5 4.5 S (%)8 8 MIN. BOULDER SIZE (L,W,H)4 x 3 x 2 4 x 3 x 2 EXTEND INTO BANK IN TOP 1 3 OF SIDE SLOPES Plan View FLOW FLOW FL O W B B' TOP OF BA N K ( T Y P ) TOE OF SLOPE (TYP) A A' STREAMBED NOTES: 1.LOG MAY BE ANGLED 20° TO 25° RELATIVE TO BANKFULL. 2.12" MINIMUM DIAMETER FOR LOGS. ECO-STAKE (TYP) EROSION CONTROL MATTING (TYP) ECO-STAKE (TYP) TOP OF BANK TOE OF SLOPE TOE OF SLOPE TOP OF BANK 3' MAX. SPACING .4" SCOUR POOLFLOW TOE OF SLOPE A' A TOP OF BANK FLOW SLOPE (S) 25° VANE ARM LENGTH (X) LENGTH OF ARM (Y) TOE OF SLOPE (TYP) TOP OF BANK (TYP) SCOUR POOLS STRUCTURE INVERT ELEVATIONS PER PROFILE. 25°-30° EMBED LOG TO BANKFULL OR 5' (MIN) WHICHEVER IS GREATER PLACE HEADER BOULDER TO PREVENT LOG FROM SHIFTING. Section A-A' A A' Section B-B' H TOP OF BANK FLOW SLOPE (S) SALVAGED ONSITE COBBLE/GRAVEL BED MATERIAL HEADER LOG FOOTER LOG W-Weir Not to Scale 4 7.3 Fiddlers Run East Prong Hunting Creek H (FT)2.2 2.2 X (FT)17.5 17.5 Y (FT)35 35 S (%)3 - 5 3 - 5 MIN. LOG SIZE (DBH)24"24" NOTES: 1.24" MINIMUM DIAMETER FOR LOGS. NOTES: 1.24" MINIMUM DIAMETER FOR LOGS. X HEADER LOG FOOTER LOG 1 2 BANKFULL TOP OF BANK FL O W FL O W Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e t a i l s . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 7. 4 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De t a i l s Au g u s t 3 1 , 2 0 2 3 NOTES: 1.WHEN REQUIRED TO USE WIRE BACKING USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINES OF WIRES WITH 12" STAY SPACING. 2.USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRES IN ACCORDANCE WITH GA DHEC BMP HANDBOOK. 3.PROVIDE 5' STEEL POST OF THE SELF-FASTENER ANGLE STEEL TYPE. ANGLE STEEL TYPE. WIRE TOP AND BOTTOM STRAND SHALL BE 10 GAUGE MIN. MIDDLE AND VERTICAL WIRES SHALL BE 12.5 GAGE MIN. FILTER FABRIC EXISTING GROUND FILTER FABRIC COMPACTED FILL EXTEND FABRIC INTO TRENCH 8" 4" 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE) STEEL POST 2'-0" DEPTH 30" MIN. 1 7.4 Temporary Silt Fence Not to Scale 2 7.4 Safety Fence Not to ScaleSAF[X] 6' MAX. WITH WIRE ORANGE SAFTY FENCE "T" OR "U" POST DRIVEN MINIMUM OF 18" INTO GROUND ATTACH SAFETY FENCE TO METAL POSTS USING METAL WIRE TIES 4' MIN. MATERIAL SPECIFICATIONS PHYSICAL PROPERTY TESTS REQUIREMENTS MATERIAL N/A POLYETHYLENE RECOMENDED COLOR N/A "INTERNATIONAL ORANGE" TENSILE YIELD ASTM D638 AVE. 2000 LBS. PER 4' WIDE ULTIMATE TENSILE STRENGTH ASTM D638 AVE. 2900 LBS. PER 4' WIDE ELONGATION AT BREAK (%)ASTM D638 GREATER THAN 1000% CHEMICAL RESISTANCE N/A INERT TO MOST CHEMICALS AND ACIDS 18" MIN. 3 7.4 Temporary Stream Crossing - Timber Mats Not to Scale TWATER DIVERSION CHANNEL MUD MATS SUPPORT LOG 12" Ø MIN. FILTER FABRIC CLASS B STONE NOTES: 1.TEMPORARY STREAM CROSSING LOCATIONS INCLUDED IN THE ESC PLANS. 2.CONSTRUCT STREAM CROSSING WHEN FLOW IS AT NORMAL BASEFLOW. 3.MINIMIZE CLEARING AND EXCAVATION OF STREAM BANKS. DO NOT EXCAVATE CHANNEL BOTTOM. 4.INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW. 5.MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL. 6.STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD MAT. 7.CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED. 8.MATS SHALL BE 16' LONG OR A MINIMUM OF 4' LONGER THAN TOP OF BANK WIDTH. 9.ALL MATS SHALL BE 4' IN WIDTH. 10.16' MATS SHALL BE CONSTRUCTED OF A MINIMUM 8"X8" HARDWOOD TIMBERS. 11.MATS LONGER THAN 16' SHALL BE CONSTRUCTED OF A MINIMUM 12"X12" HARDWOOD TIMBERS. 12.ALL MATS SHALL HAVE NO GAPS BETWEEN TIMBERS. 13.THE CONTRACTOR MAY USE THE ALTERNATE TEMPORARY STREAM CROSSING, CULVERT CROSSING, AS APPROVED BY THE ENGINEER. 5' 5' DIM Temporary Stream Crossing - Timber Mats Section View C NOTES: 1.TEMPORARY STREAM CROSSING LOCATIONS INCLUDED IN THE ESC PLANS. 2.CONSTRUCT STREAM CROSSING WHEN FLOW IS AT NORMAL BASEFLOW. 3.MINIMIZE CLEARING AND EXCAVATION OF STREAM BANKS. DO NOT EXCAVATE CHANNEL BOTTOM. 4.INSTALL STREAM CROSSING PERPENDICULAR TO THE FLOW. 5.MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL. 6.STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD MAT. 7.CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED. 8.MATS SHALL BE 16' LONG OR A MINIMUM OF 4' LONGER THAN TOP OF BANK WIDTH. 9.ALL MATS SHALL BE 4' IN WIDTH. 10.16' MATS SHALL BE CONSTRUCTED OF A MINIMUM 8"X8" HARDWOOD TIMBERS. 11.MATS LONGER THAN 16' SHALL BE CONSTRUCTED OF A MINIMUM 12"X12" HARDWOOD TIMBERS. 12.ALL MATS SHALL HAVE NO GAPS BETWEEN TIMBERS. 13.THE CONTRACTOR MAY USE THE ALTERNATE TEMPORARY STREAM CROSSING, CULVERT CROSSING, AS APPROVED BY THE ENGINEER. 4 7.4 Temporary Stream Crossing - Culvert Not to Scale FL O W TO P O F B A N K TO E O F S L O P E TO P O F B A N K RIP-RAP COVERED BY APPROPRIATELY LARGE ANGULAR ROCK. COARSE AGGREGATE MI N . 7 2 " P I P E DI A M E T E R 25' MIN.25' MIN. Section View Plan View TO E O F S L O P E FL O W Temporary Stream Crossing - Culvert MI N . 7 2 " P I P E DI A M E T E R COARSE AGGREGATE 6"MIN. 72" PIPE DIAMETER 1/2 DIAMETER OF PIPE OR 12", WHICHEVER IS GREATER EARTH FILL COVERED BY APPROPRIATELY LARGE ANGULAR ROCK. EMBEDDED 6" Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e t a i l s . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 7. 5 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De t a i l s Au g u s t 3 1 , 2 0 2 3 IMPERVIOUS DIKE (SEE INSET "B") INTAKE HOSE PUMP DISCHARGE HOSE IMPERVIOUS DIKE (SEE INSET "A") 10' X 5' STABILIZED OUTLET USING CLASS B RIPRAP AND NCDOT TYPE 2 FILTER FABRIC. (SEE INSET "B") INTAKE HOSE DEWATERING PUMP DISCHARGE HOSE SAND BAG (24" X 12" X 6") OR STONE. IMPERVIOUS SHEETING FLOW FLEXIBLE DISCHARGE HOSE FROM PUMP AROUND PUMP HELD IN PLACE WITH SAND BAGS AS NEEDED. 10' MIN. STABILIZED OUTLET USING CLASS B RIPRAP TRENCHED INTO EXISTING GROUND A MINIMUM OF 6". SIZE AND LOCATION TO BE DETERMINED IN THE FIELD BY THE ENGINEER. FILTER FABRIC Inset "B" Stabilized Outlet Plan View Inset "A" Impervious Dike NOTE: ·PROVIDE STABILIZED OUTLET TO STREAMBED. ACTIVE WORK AREA Pump Around System Not to Scale 1 7.5 2 7.5 Channel Plug Not to Scale Section A-A' Plan View EROSION CONTROL MAT 1 1 COMPACTED SELECT MATERIAL CHANNEL BACKFILL SIDE SLOPE PER TYPICAL SECTION P R O P O S E D C H A N N E L A A'FLOW ABANDONED CHANNEL FLOW WORK AREA TOE OF SLOPE/BANK INSTALL TURBIDITY CURTAIN DOWNSTREAM OF WORK AREA. NOTES: 1. TURBIDITY CURTAIN SHOULD BE INSTALLED DIRECTLY DOWNSTREAM OF WORK AREA AND INSTALLED IN STREAM TO CAPTURE ANY STREAM FLOW THAT CONTACTS WORK AREA. 2. TURBIDITY CURTAIN SHOULD BE SUITABLE FOR USE IN MOVING WATER AND INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 3. RECOMMENDED USE OF ELASTEC TYPE II DOT FASTWATER SCREEN OR SIMILAR REPLACEMENT. 4. TURBIDITY CURTAIN SHOULD BE INSPECTED, MAINTAINED, AND ADJUSTED DAILY TO ENSURE PROPER FUNCTION. 3 7.5 Turbidity Curtain Not to Scale Sh e e t Ch e c k e d B y : Jo b N u m b e r : Dr a w n B y : Pr o j e c t E n g i n e e r : Da t e : Re v i s i o n s : 49 7 B r a m s o n C t , S u i t e 1 0 4 Mo u n t P l e a s a n t , S C 2 9 4 6 4 Te l : 8 4 3 . 2 7 7 . 6 2 2 1 Li c e n s e N o . F - 0 8 3 1 PE R M I T T I N G PU R P O S E S ON L Y X: \ S h a r e d \ P r o j e c t s \ 0 0 5 - 1 6 3 5 7 M o r g a n t o n - B e t h e l P a r k \ C a d d \ P l a n s \ 1 6 3 5 7 - D e t a i l s . d w g Au g u s t 3 1 , 2 0 2 3 00 5 - 1 6 3 5 7 TW W DH J GL S 7. 6 08 . 3 1 . 2 0 2 3 Be t h e l P a r k R e s t o r a t i o n Mo r g a n t o n , N o r t h C a r o l i n a De t a i l s Au g u s t 3 1 , 2 0 2 3 NOTE: 1.LIVE STAKES TO BE PLANTED IN AREAS AS SHOWN ON PLANS AND DIRECTED BY THE ENGINEER. 2.5x5' AVG LIVESTAKE SPACING (STAGGERED ROWS, AS SHOWN IN PLAN VIEW OF DETAIL). 3.BEGIN LIVE STAKE PLANTING 1' HORIZONTALLY FROM BASEFLOW WATER SURFACE. 4.LIVE STAKING SHOULD BE COMPLETED DURING THE DORMANT SEASON, GENERALLY DECEMBER TO APRIL. Plan View 2' T O 3 ' L I V E S T A K E TA P E R E D A T B O T T O M 1/2" TO 2" DIAMETER Live Stake Detail 5' SPACING FOR LIVE STAKES 3' SPACING HERBACEOUS PLUGS TOE OF SLOPE TOP OF BANK EROSION CONTROL MATTING (SEE DETAIL) TOE OF SLOPE Section View LIVE STAKE (TYP) 2 7.6 Live Staking and Juncus Plugs Not to Scale JUNCUS PLUG LIMITS PER PLANS Boardwalk Not to Scale 1 7.6 1 1 4" - 1 1 2" GALVANIZED WELDED PIPE HANDRAIL TYPICAL BOTH SIDES. 2" X 6" DECKING USE #10X3" STAINLESS STEEL COUNTER SNAP SCREWS ON DECK ONLY DECK LEVEL GRADE 2" X 6" JOIST 4" 18" 12" 6" 4" 2' 8" 16" USE #10X3" STAINLESS STEEL COUNTER SNAP SCREWS ON DECK ONLY VARIES NOTES: 1.ACTUAL HEIGHT OF DECK TO BE DETERMINED IN THE FIELD. 2.IF A 1:12 SLOPE CANNOT BE MAINTAINED, FOLLOW THE GUIDELINES STATED UNDER 28 CFR PART 36 SECT. 4.1.6(3)(A). 3.WHERE SITE CONDITIONS DO NOT ALLOW FOR BORING, USE STANDOFFS AT THE BASE OF THE 4"X4" AND SIT ON GRADE. Boardwalk Section/Elevation Boardwalk Plan 2"x6" @ 16" OC TYPICAL ATTACH WITH JOIST HANGERS HANDRAIL BOTH SIDES ATTACH WITH PIPE GRIP TIES BRICK SIDEWALK OR ADA RAMP CURB RAMP WITH DETECTABLE WARNING 1: 5 0 CR O S S SL O P E 1: 5 0 CR O S S SL O P E 2"x6" JOIST TYPICAL @ 4"x4"4"x4" POST CLEAR BETWEEN SAFETY RAILS 5'-2" BEGIN SLOPE DOWN VARIES (SEE PLAN) 6' FL O W TO E O F S L O P E ( T Y P ) NO. 57 STONE CLASS B RIPRAP 2' MIN. 3' NO. 57 STONE 4 INCHES WIDE ON UPSTREAM FACE SPILLWAY CREST CLASS B RIPRAP Plan View Section A-A' Temporary Rock Check Dam Not to Scale 2 3 STREAM WIDTH 3' TOE OF SLOPE CLASS B RIPRAP TOP OF BANK 6" Section B-B' 5' MIN. FLOW 3 7.6 A A' B B' NOTES: 1.SEE PLANS FOR LOCATION OF ALL TEMPORARY ROCK CHECK DAMS.