LETTER OF APPROVAL WITH MODIFICATION
Greater Asheville Regional Airport Authority
ATTN: Lew Bleiweis
61 Terminal Drive
Fletcher, NC 28732
RE: Project Name: South Parking Area - Phase 2 - South Parking Lot
Acres Approved: 13.1
Project ID: BUNCO-2023-009
County: Buncombe
City: Asheville
Address: 61 Terminal Drive
River Basin: French Broad
Stream Classification: B
Submitted By: AVCON, INC. - Mr.James Moose, P.E.
Date Originally Received by LQS: November 14, 2022
Date Revision Received by LQS: June 22, 2023
Plan Type: Airport
Dear Mr. Bleiweis,
This office has reviewed the subject revised erosion and sedimentation control plan. We find
the plan to be acceptable with modifications and hereby issue this letter of Approval with
Modification. The Modification Required for Approval is listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNal form to the Stormwater
North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources
DE --, Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa.North Carolina 28778
opmi-rw"X=mrnwo0,11 r 828.296.4500
�/
Letter of Approval with Modification
Greater Asheville Regional Airport Authority
ATTN: Lew Bleiweis
June 27, 2023
Page 2 of 3
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
14
Michael Smith
Assistant Regional Engineer
Land Quality Section
Letter of Approval with Modification
Greater Asheville Regional Airport Authority
ATTN: Lew Bleiweis
June 27, 2023
Page 3 of 3
Enclosures: NPDES NCG01 Fact Sheet
ec: Mr. James Moose, P.E. jmoose@avconinc.com
Regional Office file
MODIFICATION
Project Name: South Parking Area- Phase 2 - South Parking Lot
Project ID: BUNCO-2023-009
County: Buncombe
For final plan approval, please provide the requested information below.
1. While it is noted that work shown on plan sheet C-20 will be completed under a
future phase, please include the proposed rip rap splash pad located on the discharge of S-
39 within the limits of disturbance. {NCG01000, 15A NCAC 04B .0106}.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities