Loading...
HomeMy WebLinkAboutNCC232280_ESC Approval Submitted_20230905 � { 0 ,v, 4 Ud� f ROY COOPER /s 'al�. "` }': Governor , a�,� 0, ELIZABETH S.BISER \'` " _ Secretary `ee *+ , DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality i June 27, 2023 LETTER OF APPROVAL WITH MODIFICATION Greater Asheville Regional Airport Authority ATTN: Lew Bleiweis 61 Terminal Drive Fletcher, NC 28732 RE: Project Name: South Parking Area - Phase 2 - South Parking Lot Acres Approved: 13.1 Project ID: BUNCO-2023-009 County: Buncombe City: Asheville Address: 61 Terminal Drive River Basin: French Broad Stream Classification: B Submitted By: AVCON, INC. - Mr.James Moose, P.E. Date Originally Received by LQS: November 14, 2022 Date Revision Received by LQS: June 22, 2023 Plan Type: Airport Dear Mr. Bleiweis, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modification. The Modification Required for Approval is listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNal form to the Stormwater North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources DE --, Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa.North Carolina 28778 opmi-rw"X=mrnwo0,11 r 828.296.4500 �/ Letter of Approval with Modification Greater Asheville Regional Airport Authority ATTN: Lew Bleiweis June 27, 2023 Page 2 of 3 Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land- disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. Sincerely, 14 Michael Smith Assistant Regional Engineer Land Quality Section Letter of Approval with Modification Greater Asheville Regional Airport Authority ATTN: Lew Bleiweis June 27, 2023 Page 3 of 3 Enclosures: NPDES NCG01 Fact Sheet ec: Mr. James Moose, P.E. jmoose@avconinc.com Regional Office file MODIFICATION Project Name: South Parking Area- Phase 2 - South Parking Lot Project ID: BUNCO-2023-009 County: Buncombe For final plan approval, please provide the requested information below. 1. While it is noted that work shown on plan sheet C-20 will be completed under a future phase, please include the proposed rip rap splash pad located on the discharge of S- 39 within the limits of disturbance. {NCG01000, 15A NCAC 04B .0106}. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities