Loading...
HomeMy WebLinkAboutU-5878 Commerce Drive Ext. sediment lossFrom: Westphal, Anneliese To: Steffens. Thomas A CIV USARMY CESAW (USA); Sprinkle. Hannah H Cc: Giles. Jon W; Steenhuis (LJB. Inc.). Joanne H Subject: U-5878 Commerce Drive Ext. sediment loss Date: Friday, September 1, 2023 4:26:27 PM Attachments: imaae001.pna 1 Idalia- Sta 21+85 50"It sediment loss.JPG 2 Idalia - eroded embankment Sta 21 + 50 Lt.JPG 3 Idalia Silt fence failure Sta 21+80 50"Lt.3PG Hannah and Tom, The project inspector at the subject project has reported a sediment loss at the inlet of Culvert 1 which occurred during the Idalia rain event. The site received more than 5" of rain in a 24-hour period. Please see the attached photo of the sediment over the riprap at the inlet of the culvert. Site 1 Sta. 21+85 Lt of -L- at the inlet of the culvert 2.5 CY of sediment (depth over the riprap is approximately 5" deep) The assistant resident explained: The loss (photo 1) was the result of erosion of embankment placed to back up the recently placed curbing (photo 2). Soil erosion measures we in place and the contractor temporary seeded and mulched the embankment areas on Wednesday 8/30/23. The site received more than 5" of rain in a 24 hour period and the subsequent runoff caused a silt fence failure (photo 3) resulting in this loss. We would like to determine the best way to repair this site, with your input. I understand that there is no obvious sediment downstream of either culvert which can be recovered. Thank you, Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile 910 675 0143 fax awestph�ncdot. qov 5501 Barbados Blvd Castle Hayne, INC 28429-5647 �c STATE 5 �Eq�wH,no�' Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.